ALDOT contract 20250725011 bid tabulation
ACCESS MANAGEMENT (GRADE, DRAIN, PAVE, SIGNALS, & STRIPE) ON SR-12 (US-84) FROM CR-709 (MP 184.300) EAST OF ENTERPRISE TO CR-1 (MP 185.420) IN LEVEL PLAINS. Let by Alabama DOT on July 25, 2025, Dale, Coffee, 0702. 3 bids received; low bid $2,431,183 by Wiregrass Construction Company, Inc..
- Owner
- Alabama DOT
- Letting
- 25 JUL 2025
- Pay items
- 93
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Wiregrass Construction Company, Inc. | $2,431,183 | Low |
| 2 | Apac-Alabama, Inc. | $2,475,259 | +2.0% |
| 3 | McElhenney Construction Co., LLC | $2,761,997 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Wiregrass Construction Company, Inc. | 2. Apac-Alabama, Inc. | 3. McElhenney Construction Co., LLC |
|---|---|---|---|---|---|---|
| 0010 | Removing pipe (206D000) | LF | 12 | $50.40 | $87.15 | $79.15 |
| 0020 | Removing headwalls (206E000) | EACH | 2 | $302.30 | $315.00 | $949.74 |
| 0030 | Removing inlets (206E001) | EACH | 2 | $1,208.90 | $2,047.50 | $1,139.69 |
| 0040 | Unclassified excavation (210A000) | CY | 3,579 | $25.25 | $18.95 | $32.39 |
| 0050 | Borrow excavation (loose truckbed measurement)(A4 or better) (210D021) | CY | 1,718 | $42.70 | $27.71 | $32.02 |
| 0060 | Structure excavation (214A000) | CY | 729 | $19.05 | $8.82 | $20.67 |
| 0070 | Foundation backfill, commercial (214B001) | CY | 366 | $104.95 | $94.50 | $103.84 |
| 0080 | Roadbed processing (230A000) | RBST | 55 | $779.65 | $1,135.00 | $667.74 |
| 0090 | Crushed aggregate base course, type B, road mixed, 6" compacted thickness (301A025) | SY | 9,705 | $31.35 | $25.72 | $31.77 |
| 0100 | Crushed aggregate, section 825, for miscellaneous use (305B077) | TON | 564 | $76.05 | $86.73 | $77.14 |
| 0110 | Bituminous treatment A (401A000) | SY | 9,145 | $2.00 | $1.65 | $1.46 |
| 0120 | Tack coat (405A000) | GAL | 207 | $12.00 | $5.80 | $8.54 |
| 0130 | Planing existing pavement (approximately 1.10" thru 2.0" thick) (408A052) | SY | 7,483 | $4.80 | $6.03 | $5.31 |
| 0140 | Superpave bituminous concrete wearing surface layer, widening, 1/2" maximum aggregate size mix, esal range C/D (424A369) | TON | 1,373 | $164.25 | $186.51 | $165.26 |
| 0150 | Superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range C/D (424B655) | TON | 100 | $178.95 | $188.65 | $167.36 |
| 0160 | Superpave bituminous concrete upper binder layer, leveling, 3/4" maximum aggregate size mix, esal range C/D (424B658) | TON | 100 | $165.30 | $126.60 | $160.00 |
| 0170 | Superpave bituminous concrete upper binder layer, widening, 3/4" maximum aggregate size mix, esal range C/D (424B661) | TON | 1,053 | $159.25 | $164.60 | $177.16 |
| 0180 | Superpave bituminous concrete lower binder layer, widening, 1" maximum aggregate size mix, esal range C/D (424B692) | TON | 1,259 | $143.65 | $146.20 | $175.94 |
| 0190 | Scoring bituminous pavement surface (428A001) | MI | 1 | $3,562.45 | $300.00 | $4,482.03 |
| 0200 | Aggregate surfacing (aldot #467 or #57) (430B000) | TON | 154 | $75.00 | $115.07 | $96.01 |
| 0210 | 18" roadway pipe (class 3 R.C.) (530A001) | LF | 1,433 | $76.20 | $81.90 | $109.15 |
| 0220 | 18" span, 11" rise roadway pipe (class 3 R.C.) (530B000) | LF | 3 | $572.85 | $1,365.00 | $321.15 |
| 0230 | Cleaning existing pipe (less than or equal to 48" horizontal opening) (534E001) | LF | 74 | $56.70 | $74.55 | $47.18 |
| 0240 | 18" side drain pipe (class 3 R.C.) (535A080) | LF | 385 | $69.45 | $80.85 | $109.15 |
| 0250 | Mobilization (600A000) | LS | 1 | $198,250 | $268,990 | $235,844 |
| 0260 | Filter blanket, geotextile (610D003) | SY | 404 | $7.50 | $5.45 | $5.53 |
| 0270 | Slope paving (614A000) | CY | 417 | $649.60 | $677.25 | $760.77 |
| 0280 | 18" roadway pipe end treatment, class 1 (619A002) | EACH | 1 | $1,863.20 | $1,942.50 | $2,182.04 |
| 0290 | 18" side drain pipe end treatment, class 1 (619A101) | EACH | 4 | $2,014.26 | $2,100.00 | $2,358.97 |
| 0300 | Junction boxes, type 1 or 1P (621A011) | EACH | 5 | $5,826.23 | $6,074.25 | $4,502.87 |
| 0310 | Inlets, type E (621C008) | EACH | 3 | $7,251.32 | $7,560.00 | $8,492.27 |
| 0320 | Inlets, type Y (621C020) | EACH | 4 | $6,546.33 | $6,825.00 | $5,058.05 |
| 0330 | Inlet units, type Y (621D019) | EACH | 1 | $906.41 | $945.00 | $1,453.68 |
| 0340 | Manholes, type L or M (storm) (621E004) | EACH | 1 | $5,180.00 | $7,218.75 | $4,301.66 |
| 0350 | Concrete curb, type N (623B000) | LF | 160 | $45.32 | $47.25 | $53.08 |
| 0360 | Topsoil (650A000) | CY | 645 | $51.05 | $34.03 | $57.42 |
| 0370 | Mowing (652C000) | ACRE | 2 | $106.76 | $111.30 | $707.69 |
| 0380 | Solid sodding (bermuda) (654A001) | SY | 11,605 | $4.27 | $4.45 | $7.08 |
| 0390 | Erosion control product, type C6 (659C006) | SY | 1,902 | $3.52 | $3.68 | $6.19 |
| 0400 | Temporary seeding (665A000) | ACRE | 2 | $1.07 | $1.12 | $1,415.38 |
| 0410 | Temporary mulching (665B001) | TON | 6 | $1.07 | $1.11 | $471.79 |
| 0420 | Polyethylene (665E000) | SY | 500 | $5.47 | $1.11 | $2.93 |
| 0430 | Hay bales (665F000) | EACH | 100 | $1.07 | $1.11 | $16.51 |
| 0440 | Sand bags (665G000) | EACH | 100 | $1.07 | $1.11 | $14.15 |
| 0450 | Silt fence (665J002) | LF | 605 | $1.07 | $1.11 | $7.67 |
| 0460 | Temporary coarse aggregate,aldot number 1 (665N000) | TON | 93 | $77.75 | $138.67 | $87.68 |
| 0470 | Silt fence removal (665O001) | LF | 605 | $0.01 | $0.00 | $3.59 |
| 0480 | Inlet protection, stage 3 or 4 (665P005) | EACH | 9 | $63.45 | $66.15 | $825.64 |
| 0490 | Wattle (665Q002) | LF | 280 | $1.07 | $1.11 | $16.51 |
| 0500 | Pest control treatment (666A001) | ACRE | 2 | $1.07 | $1.12 | $182.92 |
| 0510 | Construction safety fence (674A000) | LF | 200 | $2.75 | $9.45 | $4.00 |
| 0520 | Geometric controls (680A001) | LS | 1 | $15,610 | $13,455 | $44,510 |
| 0530 | Construction fuel (maximum bid limited to $ 120,000.00) (698A000) | LS | 1 | $0.00 | $0.00 | $0.00 |
| 0540 | Solid white, class 2, type A traffic stripe (5" wide) (701A227) | MI | 3 | $4,124.94 | $4,042.50 | $4,541.01 |
| 0550 | Solid yellow, class 2, type A traffic stripe (5" wide) (701A230) | MI | 2 | $4,124.94 | $4,042.50 | $4,541.01 |
| 0560 | Dotted, class 2, type A traffic stripe (5" wide) (701B207) | LF | 1,960 | $1.61 | $1.58 | $1.77 |
| 0570 | Solid temporary traffic stripe (701C001) | MI | 9 | $803.56 | $787.50 | $884.61 |
| 0580 | Solid traffic stripe removed (paint) (701D007) | MI | 1 | $107.14 | $105.00 | $117.95 |
| 0590 | Solid traffic stripe removed (plastic) (701D008) | MI | 1 | $107.14 | $105.00 | $117.95 |
| 0600 | Broken traffic stripe removed (paint) (701D014) | MI | 1 | $107.14 | $105.00 | $117.95 |
| 0610 | Broken traffic stripe removed (plastic) (701D015) | MI | 1 | $107.14 | $105.00 | $117.95 |
| 0620 | Dotted temporary traffic stripe (701F000) | LF | 2,940 | $0.16 | $0.16 | $0.18 |
| 0630 | Traffic control markings, class 2, type A (703A002) | SF | 10,029 | $4.29 | $4.20 | $4.72 |
| 0640 | Traffic control legends, class 2, type A (703B002) | SF | 471 | $5.89 | $5.78 | $6.49 |
| 0650 | Temporary traffic control markings (703D001) | SF | 10,029 | $1.34 | $1.31 | $1.47 |
| 0660 | Pavement markers, class A-H, type 2-C (705A030) | EACH | 9 | $16.07 | $15.75 | $17.69 |
| 0670 | Pavement markers, class A-H, type 1-B (705A032) | EACH | 5 | $16.07 | $15.75 | $17.69 |
| 0680 | Pavement markers, class A-H, type 2-D (705A037) | EACH | 20 | $16.07 | $15.75 | $17.69 |
| 0690 | Pavement markers, class A-H, type 2-E (705A038) | EACH | 7 | $16.07 | $15.75 | $17.69 |
| 0700 | Class 9, aluminum flat sign panels (type XI background) (710A153) | SF | 118 | $27.86 | $27.30 | $30.67 |
| 0710 | Class 4, aluminum flat sign panels (type IV background) (710A171) | SF | 81 | $25.71 | $25.20 | $28.31 |
| 0720 | Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel) (710B021) | LF | 322 | $19.82 | $19.43 | $21.82 |
| 0730 | Removal of existing traffic control unit (partial) ( SR-12 (US-84) at CR- 1) (730A012) | LS | 1 | $3,974.94 | $3,895.50 | $4,375.88 |
| 0740 | Furnishing and installing traffic control unit ( SR-12 (US-84) at CR- 1) (730C000) | LS | 1 | $11,802 | $11,566 | $12,992 |
| 0750 | Traffic signal junction box type S2 (730K002) | EACH | 1 | $2,126.75 | $2,084.25 | $2,341.27 |
| 0760 | 1", non-metallic, conduit (730L003) | LF | 40 | $19.82 | $19.43 | $21.82 |
| 0770 | 2", non-metallic, conduit (730L005) | LF | 160 | $17.14 | $16.80 | $18.87 |
| 0780 | Vehicular signal head, 12 inch, 3 (730P022) | EACH | 4 | $1,682.12 | $1,648.50 | $1,851.79 |
| 0790 | Vehicular signal head, 12 inch, 4 (730P023) | EACH | 6 | $2,196.40 | $2,152.50 | $2,417.94 |
| 0800 | Controller assembly, type atc, 16 channels (730R046) | EACH | 1 | $37,928 | $37,170 | $41,754 |
| 0810 | Electrical power service assembly with wood pole (730T010) | EACH | 1 | $5,357.06 | $5,250.00 | $5,897.41 |
| 0820 | Radar detection system ( SR-12 (US-84) at CR-1) (730U400) | LS | 1 | $41,249 | $40,425 | $45,410 |
| 0830 | Furnishing and installing pedestal pole and foundation with flashing beacon (730Y000) | LS | 1 | $12,353 | $12,107 | $13,599 |
| 0840 | Furnishing and installing pedestal pole and foundation with flashing beacon (730Y001) | LS | 1 | $12,353 | $12,107 | $13,599 |
| 0850 | Furnishing and installing pedestal pole and foundation with flashing beacon (730Y002) | LS | 1 | $12,353 | $12,107 | $13,599 |
| 0860 | Furnishing and installing pedestal pole and foundation with flashing beacon (730Y003) | LS | 1 | $12,353 | $12,107 | $13,599 |
| 0870 | Construction signs (740B000) | SF | 1,290 | $6.96 | $6.83 | $7.67 |
| 0880 | Channelizing drums (740D000) | EACH | 200 | $19.82 | $19.43 | $21.82 |
| 0890 | Cones (36 inches high) (740E000) | EACH | 50 | $31.44 | $11.56 | $40.69 |
| 0900 | Barricades, type III (740F002) | EACH | 10 | $133.93 | $131.25 | $147.44 |
| 0910 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 2 | $937.49 | $918.75 | $1,032.05 |
| 0920 | Portable changeable message sign, type 2 (742A001) | EACH | 2 | $1,714.26 | $1,680.00 | $1,887.17 |
| 0930 | Uniformed police officer (745A000) | HR | 80 | $120.00 | $63.87 | $54.88 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of July 25, 2025. Compiled by Mirage Metrics.