ALDOT contract 20250926011 bid tabulation
STREETSCAPE AND SIDEWALK ENHANCEMENTS TO INCLUDE ADA UPGRADE ON VARIOUS ROUTES AT VARIOUS LOCATIONS IN BIRMINGHAM AS INDICATED IN THE PLANS. Let by Alabama DOT on September 26, 2025, Jefferson, 0301. 2 bids received; low bid $2,672,406 by South Dade Air Conditioning & Refrigeration,.
- Owner
- Alabama DOT
- Letting
- 26 SEP 2025
- Pay items
- 37
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | South Dade Air Conditioning & Refrigeration, | $2,672,406 | Low |
| 2 | Bulls Construction Group, LLC | $2,767,191 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. South Dade Air Conditioning & Refrigeration, | 2. Bulls Construction Group, LLC |
|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (maximum allowable bid $ 8,000.00 per acre) (approximately 1 acre) (201A002) | LS | 1 | $5,000.00 | $8,000.00 |
| 0020 | Removing concrete sidewalk (206C000) | SY | 16,202 | $20.00 | $15.00 |
| 0030 | Removing concrete driveway (206C010) | SY | 1,495 | $20.00 | $15.00 |
| 0040 | Removing curb and gutter (206D003) | LF | 240 | $15.00 | $20.00 |
| 0050 | Removing trees (206E006) | EACH | 38 | $2,800.00 | $400.00 |
| 0060 | Unclassified excavation (210A000) | CY | 500 | $30.00 | $40.00 |
| 0070 | Borrow excavation (loose truckbed measurement) (210D001) | CY | 1,100 | $40.00 | $40.00 |
| 0080 | Crushed aggregate, section 825, for miscellaneous use (305B077) | TON | 115 | $68.00 | $75.00 |
| 0090 | Superpave bituminous concrete wearing surface layer, patching, 1/2" maximum aggregate size mix, esal range C/D (424A363) | TON | 15 | $300.00 | $300.00 |
| 0100 | Mobilization (600A000) | LS | 1 | $63,000 | $112,176 |
| 0110 | Filter blanket, geotextile (610D003) | SY | 1,698 | $4.50 | $6.00 |
| 0120 | Concrete sidewalk, 4" thick (618A000) | SY | 16,713 | $65.00 | $78.00 |
| 0130 | Concrete driveway, 6" thick (includes wire mesh) (618B003) | SY | 1,884 | $90.00 | $85.00 |
| 0140 | Detectable warning surface (618C001) | SF | 1,488 | $40.00 | $45.00 |
| 0150 | Curb ramp (618D000) | SY | 732 | $140.00 | $360.00 |
| 0160 | Concrete gutter (valley) (623A001) | LF | 200 | $30.00 | $40.00 |
| 0170 | Combination curb & gutter, type C (623C000) | LF | 414 | $30.00 | $40.00 |
| 0180 | Topsoil (650A000) | CY | 2,000 | $50.00 | $40.00 |
| 0190 | Solid sodding (bermuda) (654A001) | SY | 11,200 | $25.00 | $11.00 |
| 0200 | Temporary seeding (665A000) | ACRE | 2 | $5,000.00 | $1,350.00 |
| 0210 | Temporary mulching (665B001) | TON | 6 | $650.00 | $1,075.00 |
| 0220 | Polyethylene (665E000) | SY | 500 | $1.00 | $5.00 |
| 0230 | Sand bags (665G000) | EACH | 740 | $5.00 | $11.00 |
| 0240 | Silt fence (665J002) | LF | 5,008 | $6.00 | $6.00 |
| 0250 | Silt fence removal (665O001) | LF | 5,008 | $4.50 | $1.50 |
| 0260 | Wattle (665Q002) | LF | 1,880 | $15.00 | $8.50 |
| 0270 | Construction safety fence (674A000) | LF | 5,000 | $6.00 | $4.00 |
| 0280 | Geometric controls (680A001) | LS | 1 | $15,000 | $73,332 |
| 0290 | Traffic control markings, class 2, type A (703A002) | SF | 7,745 | $9.90 | $7.00 |
| 0300 | Traffic control markings, class W, type A (703A011) | SF | 70 | $20.20 | $28.00 |
| 0310 | Removal of existing traffic control markings or legends (plastic) (703C001) | SF | 1,632 | $3.40 | $4.50 |
| 0320 | Temporary traffic control markings (703D001) | SF | 220 | $2.70 | $2.25 |
| 0330 | Construction signs (740B000) | SF | 362 | $7.80 | $8.50 |
| 0340 | Channelizing drums (740D000) | EACH | 150 | $40.30 | $50.00 |
| 0350 | Cones (36 inches high) (740E000) | EACH | 150 | $32.70 | $45.00 |
| 0360 | Barricades, type II (740F001) | EACH | 5 | $174.30 | $250.00 |
| 0370 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 1 | $2,419.00 | $3,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of September 26, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.