ALDOT contract 20250829022 bid tabulation
RELOACTION AND INTERSECTION IMPROVEMENTS ON LAKESHORE PARKWAY AND MORGAN ROAD FROM CUMBERLAND ROAD TO TURNIN DRIVE IN BESSEMER. Let by Alabama DOT on August 29, 2025, Jefferson, 0301. 6 bids received; low bid $18,948,037 by Chilton Contractors, Inc..
- Owner
- Alabama DOT
- Letting
- 29 AUG 2025
- Pay items
- 195
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Chilton Contractors, Inc. | $18,948,037 | Low |
| 2 | Carcel & G. Construction, LLC | $19,712,633 | +4.0% |
| 3 | Ikaros, LLC | $21,710,000 | +15% |
| 4 | Russo Corporation | $25,208,132 | +33% |
| 5 | GFC Construction, Inc. | $25,566,145 | +35% |
| 6 | Gillespie Construction, LLC | $26,199,887 | +38% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Chilton Contractors, Inc. | 2. Carcel & G. Construction, LLC | 3. Ikaros, LLC | 4. Russo Corporation | 5. GFC Construction, Inc. | 6. Gillespie Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (maximum allowable bid $ 8,000.00 per acre) (approximately 38 acres) (201A002) | LS | 1 | $230,263 | $269,559 | $304,000 | $304,000 | $304,000 | $304,000 |
| 0020 | Removal of structures, structure no. 1 (205A001) | EACH | 1 | $1,543.48 | $4,353.17 | $1,000.00 | $4,022.28 | $30,700 | $25,000 |
| 0030 | Removal of structures, structure no. 2 (205A002) | EACH | 1 | $11,649 | $4,353.17 | $35,000 | $4,022.28 | $30,700 | $25,000 |
| 0040 | Removal of structures, structure no. 3 (205A003) | EACH | 1 | $13,584 | $4,353.17 | $35,000 | $6,703.80 | $30,700 | $25,000 |
| 0050 | Removal of structures, structure no. 4 (205A004) | EACH | 1 | $18,439 | $4,353.17 | $35,000 | $4,022.28 | $30,700 | $25,000 |
| 0060 | Removal of structures, structure no. 5 (205A005) | EACH | 1 | $1,198.77 | $4,353.17 | $1,000.00 | $670.38 | $30,700 | $25,000 |
| 0070 | Removal of structures, structure no. 1 (205A006) | EACH | 1 | $1,303.87 | $4,353.17 | $1,000.00 | $670.38 | $30,700 | $25,000 |
| 0080 | Removal of structures, structure no. 2 (205A007) | EACH | 1 | $5,931.83 | $4,353.17 | $10,000 | $6,703.80 | $30,700 | $25,000 |
| 0090 | Removal of old box culvert, station 85+19.32 (206B000) | LS | 1 | $10,830 | $16,119 | $50,000 | $46,968 | $14,439 | $40,000 |
| 0100 | Removal of old box culvert, partial, station 497+71.82 (206B009) | LS | 1 | $5,172.56 | $7,666.74 | $25,000 | $18,787 | $11,681 | $35,000 |
| 0110 | Removing concrete sidewalk (206C000) | SY | 6 | $37.08 | $97.18 | $50.00 | $200.32 | $367.50 | $100.00 |
| 0120 | Removing concrete slope paving (206C002) | SY | 177 | $17.92 | $5.80 | $50.00 | $76.75 | $19.95 | $65.00 |
| 0130 | Removing concrete flumes (206C003) | SY | 86 | $18.00 | $8.87 | $50.00 | $35.80 | $24.15 | $72.00 |
| 0140 | Removing concrete median (206C008) | SY | 519 | $24.29 | $11.33 | $50.00 | $98.18 | $15.75 | $70.00 |
| 0150 | Removing concrete driveway (206C010) | SY | 373 | $34.19 | $6.94 | $50.00 | $35.78 | $15.75 | $35.00 |
| 0160 | Removing concrete pad (206C017) | SY | 13 | $40.06 | $139.22 | $50.00 | $352.68 | $215.25 | $85.00 |
| 0170 | Removing pipe (206D000) | LF | 1,095 | $26.46 | $10.98 | $50.00 | $27.22 | $13.65 | $65.00 |
| 0180 | Removing guardrail (206D001) | LF | 424 | $5.55 | $5.51 | $5.91 | $6.70 | $5.40 | $8.00 |
| 0190 | Removing curb (206D002) | LF | 824 | $11.23 | $16.32 | $20.00 | $16.65 | $11.81 | $30.00 |
| 0200 | Removing curb and gutter (206D003) | LF | 3,729 | $10.65 | $9.07 | $20.00 | $16.69 | $8.97 | $30.00 |
| 0210 | Removing fence (206D011) | LF | 236 | $7.49 | $6.93 | $15.00 | $9.39 | $15.75 | $25.00 |
| 0220 | Removing headwalls (206E000) | EACH | 3 | $560.71 | $455.47 | $2,500.00 | $819.70 | $787.50 | $850.00 |
| 0230 | Removing inlets (206E001) | EACH | 4 | $544.59 | $1,346.30 | $2,500.00 | $1,546.43 | $787.50 | $1,500.00 |
| 0240 | Removing junction boxes (206E002) | EACH | 1 | $643.71 | $1,346.30 | $2,500.00 | $3,151.88 | $787.50 | $1,500.00 |
| 0250 | Removing manholes (206E003) | EACH | 2 | $8,588.94 | $6,615.00 | $7,500.00 | $3,166.60 | $787.50 | $1,500.00 |
| 0260 | Removing guardrail end anchor (all type) (206E008) | EACH | 6 | $332.79 | $330.75 | $354.63 | $402.23 | $324.00 | $400.00 |
| 0270 | Removing inlets (partial) (206E042) | EACH | 4 | $1,070.64 | $1,680.57 | $4,000.00 | $1,680.51 | $787.50 | $4,500.00 |
| 0280 | Removing tree (19 - 36 inch) (206E062) | EACH | 1 | $8,511.44 | $13,854 | $7,500.00 | $3,351.90 | $5,250.00 | $7,500.00 |
| 0290 | Unclassified excavation (210A000) | CY | 74,347 | $15.39 | $16.97 | $25.00 | $29.54 | $21.52 | $24.00 |
| 0300 | Muck excavation (210C000) | CY | 23,400 | $17.78 | $18.26 | $7.50 | $27.76 | $30.91 | $30.00 |
| 0310 | Borrow excavation (A4 or better) (210D011) | CY | 106,633 | $17.77 | $14.70 | $12.00 | $35.37 | $21.93 | $34.00 |
| 0320 | Borrow excavation (sand fill, complete in place) (210D101) | CY | 742 | $75.27 | $75.72 | $60.00 | $38.00 | $36.75 | $75.00 |
| 0330 | Borrow excavation (underwater backfill) (aldot #57) (210F002) | TON | 225 | $50.84 | $46.09 | $75.00 | $66.09 | $51.71 | $85.00 |
| 0340 | Structure excavation (214A000) | CY | 2,234 | $29.72 | $13.36 | $20.00 | $44.91 | $17.72 | $45.00 |
| 0350 | Foundation backfill, commercial (214B001) | CY | 1,292 | $57.59 | $62.25 | $75.00 | $77.56 | $61.73 | $100.00 |
| 0360 | Roadbed processing (230A000) | RBST | 116 | $686.63 | $896.26 | $1,000.00 | $2,071.46 | $525.00 | $1,900.00 |
| 0370 | Crushed aggregate base course, type B, plant mixed, 6" compacted thickness (301A012) | SY | 98,103 | $13.52 | $16.01 | $17.00 | $19.55 | $14.81 | $21.00 |
| 0380 | Crushed aggregate, section 825, for miscellaneous use (305B077) | TON | 525 | $55.08 | $36.26 | $65.00 | $56.59 | $48.25 | $65.00 |
| 0390 | Bituminous treatment AE (401A043) | SY | 93,839 | $3.79 | $7.78 | $3.89 | $4.74 | $3.78 | $3.82 |
| 0400 | Tack coat (405A000) | GAL | 26,524 | $5.04 | $4.97 | $5.32 | $6.09 | $4.86 | $5.17 |
| 0410 | Planing existing pavement (approximately 1.10" thru 2.0" thick) (408A052) | SY | 21,355 | $2.00 | $2.48 | $2.66 | $3.05 | $2.43 | $2.20 |
| 0430 | Material remixing device (410H000) | EACH | 2 | $52,103 | $51,266 | $54,968 | $62,975 | $50,200 | $53,475 |
| 0440 | Smoothness testing, certified inertial profiler (410I000) | EACH | 1 | $4,437.12 | $4,365.90 | $4,681.13 | $5,363.04 | $4,276.80 | $4,554.00 |
| 0450 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D (424A360) | TON | 9,969 | $103.31 | $101.65 | $108.99 | $124.87 | $99.58 | $110.00 |
| 0460 | Superpave bituminous concrete wearing surface layer, widening, 1/2" maximum aggregate size mix, esal range C/D (424A369) | TON | 17 | $223.42 | $219.84 | $235.71 | $270.05 | $215.35 | $229.50 |
| 0470 | Superpave bituminous concrete upper binder layer, 3/4" maximum aggregate size mix, esal range C/D (424B650) | TON | 10,372 | $86.73 | $85.33 | $91.49 | $104.82 | $83.59 | $90.00 |
| 0480 | Superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range C/D (424B655) | TON | 188 | $223.99 | $220.39 | $236.30 | $270.73 | $215.89 | $230.00 |
| 0490 | Superpave bituminous concrete upper binder layer, leveling, 3/4" maximum aggregate size mix, esal range C/D (424B658) | TON | 1,897 | $105.44 | $103.75 | $111.24 | $127.44 | $101.63 | $108.25 |
| 0500 | Superpave bituminous concrete upper binder layer, widening, 3/4" maximum aggregate size mix, esal range C/D (424B661) | TON | 24 | $211.66 | $208.27 | $223.30 | $255.83 | $204.01 | $217.25 |
| 0510 | Superpave bituminous concrete lower binder layer, 3/4" maximum aggregate size mix, esal range C/D (424B680) | TON | 10,432 | $86.61 | $85.23 | $91.38 | $104.69 | $83.48 | $89.00 |
| 0520 | Superpave bituminous concrete lower binder layer, 1" maximum aggregate size mix, esal range C/D (424B681) | TON | 16,344 | $83.92 | $82.58 | $88.54 | $101.44 | $80.89 | $86.25 |
| 0530 | Superpave bituminous concrete lower binder layer, patching, 1" maximum aggregate size mix, esal range C/D (424B685) | TON | 200 | $215.13 | $211.68 | $226.96 | $260.03 | $207.36 | $221.00 |
| 0540 | Superpave bituminous concrete lower binder layer, leveling, 1" maximum aggregate size mix, esal range C/D (424B689) | TON | 2,306 | $97.59 | $96.03 | $102.96 | $117.96 | $94.07 | $100.25 |
| 0550 | Superpave bituminous concrete lower binder layer, widening, 3/4" maximum aggregate size mix, esal range C/D (424B691) | TON | 25 | $211.66 | $208.27 | $223.30 | $255.83 | $204.01 | $217.25 |
| 0560 | Superpave bituminous concrete lower binder layer, widening, 1" maximum aggregate size mix, esal range C/D (424B692) | TON | 41 | $208.97 | $205.62 | $220.46 | $252.58 | $201.42 | $215.00 |
| 0570 | Scoring bituminous pavement surface (428A001) | MI | 1 | $1,783.93 | $4,189.50 | $4,492.00 | $5,146.35 | $4,104.00 | $4,370.00 |
| 0580 | Steel reinforcement (502A000) | LB | 47,743 | $1.96 | $1.69 | $2.00 | $2.21 | $1.89 | $2.00 |
| 0585 | Steel reinforcement (grade 60) (502A001) | LB | 1,614 | $1.96 | $2.26 | $2.50 | $2.21 | $1.89 | $5.00 |
| 0590 | Temporary steel sheet piling (505I000) | SF | 1,720 | $55.46 | $43.17 | $50.00 | $52.49 | $73.50 | $125.00 |
| 0600 | Culvert concrete (524A010) | CY | 200 | $1,928.40 | $1,041.51 | $1,750.00 | $1,729.58 | $1,420.20 | $1,400.00 |
| 0610 | Culvert concrete extension (524B010) | CY | 61 | $2,634.68 | $1,289.45 | $2,000.00 | $1,964.21 | $1,782.00 | $1,400.00 |
| 0620 | 15" roadway pipe (class 3 R.C.) (530A000) | LF | 18 | $95.05 | $81.76 | $150.00 | $156.20 | $177.36 | $175.00 |
| 0630 | 18" roadway pipe (class 3 R.C.) (530A001) | LF | 160 | $99.82 | $54.16 | $125.00 | $161.37 | $77.50 | $225.00 |
| 0640 | 24" roadway pipe (class 3 R.C.) (530A002) | LF | 259 | $118.82 | $65.66 | $140.00 | $195.91 | $76.22 | $250.00 |
| 0650 | 36" roadway pipe (class 3 R.C.) (530A004) | LF | 320 | $175.14 | $112.34 | $200.00 | $235.64 | $130.34 | $265.00 |
| 0660 | 60" roadway pipe (class 3 R.C.) (530A008) | LF | 670 | $371.71 | $325.78 | $400.00 | $474.87 | $314.58 | $620.00 |
| 0670 | 15" storm sewer pipe (class 3 R.C.) (533A097) | LF | 8 | $131.61 | $81.27 | $200.00 | $123.98 | $282.36 | $175.00 |
| 0680 | 24" storm sewer pipe (class 3 R.C.) (533A099) | LF | 1,851 | $101.33 | $80.16 | $140.00 | $144.92 | $76.22 | $200.00 |
| 0690 | 18" side drain pipe (535A001) | LF | 60 | $136.40 | $67.74 | $125.00 | $129.21 | $89.54 | $190.00 |
| 0700 | 24" side drain pipe (535A002) | LF | 174 | $151.91 | $70.85 | $140.00 | $144.93 | $98.76 | $200.00 |
| 0710 | 29" span, 18" rise side drain pipe (535B012) | LF | 114 | $150.40 | $103.85 | $180.00 | $175.59 | $122.09 | $250.00 |
| 0720 | 44" span, 27" rise side drain pipe (535B013) | LF | 50 | $249.71 | $167.32 | $200.00 | $227.20 | $159.09 | $325.00 |
| 0730 | Mobilization (600A000) | LS | 1 | $731,577 | $2,609,347 | $1,630,911 | $641,768 | $2,482,646 | $2,341,000 |
| 0740 | Right of way markers (602A000) | EACH | 47 | $753.44 | $899.92 | $600.00 | $705.87 | $740.01 | $1,400.00 |
| 0750 | Separation geotextile (608A000) | SY | 143,953 | $2.14 | $0.89 | $0.10 | $4.80 | $2.92 | $6.00 |
| 0760 | Loose riprap, class 2 (610C001) | TON | 914 | $78.16 | $53.05 | $85.00 | $104.29 | $68.72 | $105.00 |
| 0770 | Filter blanket, geotextile (610D003) | SY | 1,985 | $3.50 | $5.67 | $6.00 | $7.44 | $3.02 | $8.00 |
| 0780 | Slope paving (614A000) | CY | 7 | $1,061.78 | $994.13 | $3,000.00 | $1,327.35 | $1,026.00 | $1,200.00 |
| 0790 | Concrete driveway, 6" thick (includes wire mesh) (618B003) | SY | 404 | $162.06 | $107.55 | $150.00 | $154.19 | $156.60 | $130.00 |
| 0800 | Concrete driveway, 10" thick (includes wire mesh) (618B005) | SY | 78 | $257.06 | $154.13 | $300.00 | $185.02 | $248.40 | $250.00 |
| 0810 | 15" roadway pipe end treatment, class 1 (619A001) | EACH | 2 | $1,939.15 | $833.96 | $2,250.00 | $2,078.18 | $1,873.80 | $1,900.00 |
| 0820 | 18" roadway pipe end treatment, class 1 (619A002) | EACH | 2 | $1,995.03 | $947.57 | $2,500.00 | $2,212.26 | $1,927.80 | $2,000.00 |
| 0830 | 24" roadway pipe end treatment, class 1 (619A003) | EACH | 4 | $2,179.44 | $1,014.90 | $2,850.00 | $2,654.71 | $2,106.00 | $2,200.00 |
| 0840 | 36" roadway pipe end treatment, class 1 (619A005) | EACH | 4 | $3,883.88 | $3,177.39 | $3,000.00 | $2,949.67 | $3,753.00 | $2,800.00 |
| 0850 | 18" side drain pipe end treatment, class 1 (619A101) | EACH | 2 | $2,682.39 | $1,125.53 | $2,500.00 | $2,346.33 | $2,592.00 | $2,000.00 |
| 0860 | 24" side drain pipe end treatment, class 1 (619A102) | EACH | 6 | $2,402.98 | $1,479.19 | $2,850.00 | $2,788.78 | $2,322.00 | $2,500.00 |
| 0870 | 60" roadway pipe end treatment, class 1 (double line) (619A209) | EACH | 4 | $5,588.32 | $7,086.34 | $10,500 | $11,262 | $5,400.00 | $7,500.00 |
| 0880 | 29" span, 18" rise side drain pipe end treatment, class 1 (619B117) | EACH | 4 | $2,402.98 | $1,390.39 | $2,500.00 | $3,056.94 | $2,322.00 | $2,000.00 |
| 0890 | Minor structure concrete (620A000) | CY | 32 | $1,927.97 | $1,319.33 | $3,000.00 | $3,683.39 | $1,863.00 | $1,500.00 |
| 0900 | Junction boxes, type 1 or 1P (621A011) | EACH | 2 | $5,085.37 | $4,672.27 | $6,500.00 | $7,819.79 | $5,599.65 | $7,500.00 |
| 0910 | Junction box units, type 1 or 2P (621B014) | EACH | 2 | $1,100.90 | $659.95 | $1,750.00 | $2,369.60 | $2,052.75 | $2,000.00 |
| 0920 | Inlets, type S1 or S3 (1 wing) (621C015) | EACH | 18 | $5,644.20 | $3,392.92 | $7,500.00 | $5,456.89 | $6,620.85 | $7,500.00 |
| 0930 | Inlets, type S1 or S3 (2 wing) (621C017) | EACH | 6 | $5,867.73 | $4,855.66 | $8,500.00 | $9,470.33 | $7,309.80 | $8,500.00 |
| 0940 | Inlets, type Y (621C020) | EACH | 2 | $3,828.00 | $5,214.98 | $6,500.00 | $6,167.50 | $3,597.00 | $9,500.00 |
| 0950 | Inlet units, type S1 or S3 (621D015) | EACH | 26 | $1,100.90 | $672.61 | $1,850.00 | $1,139.65 | $742.35 | $1,500.00 |
| 0960 | Inlet units, type Y (621D019) | EACH | 1 | $1,005.90 | $877.93 | $1,500.00 | $1,139.64 | $972.00 | $1,800.00 |
| 0970 | Concrete curb, type N (623B000) | LF | 982 | $50.29 | $27.56 | $32.00 | $33.52 | $48.60 | $50.00 |
| 0980 | Concrete curb, type N special (623B001) | LF | 268 | $156.47 | $121.28 | $128.00 | $147.48 | $151.20 | $200.00 |
| 0990 | Combination curb & gutter, type C (623C000) | LF | 6,483 | $62.59 | $29.22 | $35.00 | $35.53 | $60.48 | $38.00 |
| 1000 | Steel beam guardrail, class A, type 2 (630A001) | LF | 300 | $27.73 | $27.56 | $29.55 | $33.52 | $27.00 | $30.00 |
| 1010 | Guardrail end anchor, type 20 series (MASH) (630C080) | EACH | 2 | $3,549.70 | $3,528.00 | $3,782.73 | $4,290.44 | $3,456.00 | $3,800.00 |
| 1020 | 8 inch ductile iron sanitary sewer gravity pipe laid (645A510) | LF | 786 | $278.79 | $441.00 | $263.33 | $1,526.46 | $2,227.14 | $550.00 |
| 1030 | 8 inch P.V.C. sanitary sewer gravity pipe laid (645A548) | LF | 2,977 | $184.63 | $363.83 | $193.62 | $168.31 | $1,059.43 | $425.00 |
| 1035 | 4 inch P.V.C. stacks and laterals (645E522) | LF | 20 | $85.89 | $441.00 | $90.07 | $67.24 | $203.56 | $250.00 |
| 1040 | 8 inch abandon existing sanitary sewer (645F510) | LF | 3,455 | $8.91 | $17.64 | $9.34 | $22.60 | $16.85 | $32.00 |
| 1045 | 4 inch sanitary sewer lateral cleanout (645G510) | EACH | 1 | $1,717.79 | $1,102.50 | $1,801.49 | $7,021.76 | $3,153.05 | $3,500.00 |
| 1050 | 48 inch manhole (645H510) | EACH | 17 | $11,495 | $8,820.00 | $12,055 | $5,555.96 | $11,774 | $12,000 |
| 1060 | 60 inch manhole (645H540) | EACH | 4 | $13,556 | $13,230 | $14,216 | $6,920.54 | $13,770 | $14,500 |
| 1070 | 48 inch manhole unit (645I500) | EACH | 44 | $2,176.02 | $882.00 | $2,282.05 | $874.12 | $2,155.28 | $2,000.00 |
| 1080 | 60 inch manhole unit (645I505) | EACH | 34 | $2,645.55 | $1,102.50 | $2,774.46 | $1,114.67 | $2,354.83 | $2,500.00 |
| 1090 | Abandon existing manhole (645N500) | EACH | 13 | $7,620.68 | $5,512.50 | $7,991.99 | $1,976.38 | $3,402.59 | $3,800.00 |
| 1100 | 16 inch steel encasement pipe, type 1 installation (649A545) | LF | 587 | $662.80 | $496.13 | $695.10 | $258.92 | $1,292.13 | $375.00 |
| 1110 | Topsoil (650A000) | CY | 1,580 | $30.18 | $18.62 | $25.00 | $55.14 | $34.56 | $38.00 |
| 1120 | Topsoil from stockpiles (650B000) | CY | 10,791 | $11.74 | $4.69 | $15.00 | $18.79 | $20.31 | $20.00 |
| 1130 | Seeding (652A100) | ACRE | 24 | $1,442.07 | $1,211.67 | $2,127.79 | $2,475.25 | $1,575.00 | $1,500.00 |
| 1140 | Mowing (652C000) | ACRE | 121 | $205.22 | $210.70 | $250.00 | $123.76 | $420.00 | $125.00 |
| 1150 | Solid sodding (654A000) | SY | 33,916 | $9.43 | $7.28 | $16.55 | $19.25 | $9.72 | $6.26 |
| 1160 | Solid sodding (bermuda) (654A001) | SY | 2,796 | $9.43 | $7.36 | $14.54 | $16.91 | $9.72 | $6.15 |
| 1170 | Mulching (656A010) | ACRE | 21 | $1,220.21 | $498.31 | $2,246.00 | $2,612.76 | $1,155.00 | $1,000.00 |
| 1180 | Erosion control product, type S4 (659C000) | SY | 25,048 | $2.11 | $1.92 | $2.07 | $2.41 | $2.34 | $3.00 |
| 1190 | Erosion control product, type S3 (659C001) | SY | 4,158 | $2.11 | $1.92 | $4.73 | $5.50 | $2.34 | $3.00 |
| 1200 | Erosion control product, type S2 (659C002) | SY | 12,052 | $2.11 | $2.64 | $4.73 | $5.50 | $2.39 | $3.25 |
| 1210 | Temporary seeding (665A000) | ACRE | 42 | $665.57 | $400.00 | $472.84 | $550.06 | $630.00 | $750.00 |
| 1220 | Temporary mulching (665B001) | TON | 348 | $776.50 | $487.16 | $461.02 | $536.30 | $26.25 | $175.00 |
| 1230 | Temporary pipe (665C010) | LF | 500 | $70.49 | $31.89 | $30.00 | $45.60 | $21.00 | $200.00 |
| 1240 | Temporary pipe end treatment (665D001) | EACH | 8 | $248.03 | $326.61 | $500.00 | $1,393.96 | $1,575.00 | $2,500.00 |
| 1250 | Polyethylene (665E000) | SY | 700 | $4.44 | $2.28 | $4.73 | $5.50 | $7.51 | $3.00 |
| 1260 | Hay bales (665F000) | EACH | 500 | $13.31 | $14.21 | $11.82 | $13.75 | $9.98 | $15.00 |
| 1270 | Sand bags (665G000) | EACH | 700 | $6.66 | $18.59 | $11.82 | $13.75 | $7.59 | $7.00 |
| 1280 | Temporary riprap, class 2 (665I000) | TON | 51 | $70.26 | $63.64 | $100.00 | $64.36 | $96.08 | $95.00 |
| 1290 | Silt fence (665J002) | LF | 5,741 | $4.71 | $4.85 | $5.91 | $6.88 | $3.92 | $6.00 |
| 1300 | Temporary coarse aggregate,aldot number 1 (665N000) | TON | 800 | $68.01 | $56.53 | $70.00 | $74.70 | $58.54 | $68.00 |
| 1310 | Silt fence removal (665O001) | LF | 5,741 | $1.39 | $1.88 | $1.18 | $1.38 | $1.58 | $1.50 |
| 1320 | Inlet protection, stage 3 or 4 (665P005) | EACH | 3 | $610.10 | $549.89 | $500.00 | $550.05 | $656.25 | $450.00 |
| 1330 | Wattle (665Q002) | LF | 2,600 | $7.49 | $11.53 | $12.00 | $13.75 | $7.14 | $12.00 |
| 1340 | Pest control treatment (666A001) | ACRE | 35 | $221.86 | $130.69 | $60.00 | $68.76 | $54.00 | $200.00 |
| 1350 | Flocculant application, ditch check (672C100) | EACH | 126 | $22.19 | $248.92 | $21.50 | $24.75 | $27.00 | $100.00 |
| 1360 | Geometric controls (680A001) | LS | 1 | $520,841 | $292,927 | $250,000 | $350,986 | $264,684 | $475,000 |
| 1370 | Construction fuel (maximum bid limited to $ 1,551,200.00) (698A000) | LS | 1 | $337,000 | $0.00 | $1,551,200 | $0.01 | $0.00 | $0.00 |
| 1380 | Solid white, class 2, type A traffic stripe (5" wide) (701A227) | MI | 8 | $4,762.06 | $4,685.63 | $5,023.94 | $5,698.23 | $4,590.00 | $4,900.00 |
| 1390 | Solid yellow, class 2, type A traffic stripe (5" wide) (701A230) | MI | 6 | $4,762.07 | $4,685.63 | $5,023.94 | $5,698.23 | $4,590.00 | $4,900.00 |
| 1400 | Broken white, class 2, type A traffic stripe (5" wide) (701A239) | MI | 5 | $2,952.48 | $2,905.09 | $3,114.84 | $3,532.90 | $2,845.80 | $3,000.00 |
| 1410 | Broken yellow, class 2, type A traffic stripe (5" wide) (701A244) | MI | 3 | $2,952.48 | $2,905.09 | $3,114.84 | $3,532.90 | $2,845.80 | $3,000.00 |
| 1420 | Dotted, class 2, type A traffic stripe(lane drop 10" wide) (701B063) | LF | 3,749 | $4.20 | $4.14 | $4.43 | $5.03 | $4.05 | $4.50 |
| 1430 | Dotted, class 2, type A traffic stripe (5" wide) (701B207) | LF | 4,386 | $1.96 | $1.93 | $2.07 | $2.35 | $1.89 | $2.50 |
| 1440 | Broken temporary traffic stripe (701C000) | MI | 1 | $1,288.56 | $1,267.88 | $1,359.42 | $1,541.87 | $1,242.00 | $1,500.00 |
| 1450 | Solid temporary traffic stripe (701C001) | MI | 5 | $1,316.57 | $1,295.44 | $1,388.97 | $1,575.39 | $1,269.00 | $1,500.00 |
| 1460 | Broken temporary traffic stripe (paint) (701C002) | MI | 7 | $1,288.56 | $1,267.88 | $1,359.42 | $1,541.87 | $1,242.00 | $1,500.00 |
| 1470 | Solid temporary traffic stripe (paint) (701C003) | MI | 23 | $1,316.57 | $1,295.44 | $1,388.97 | $1,575.39 | $1,269.00 | $1,500.00 |
| 1480 | Solid traffic stripe removed (701D005) | MI | 2 | $2,801.22 | $2,756.25 | $2,955.26 | $3,351.90 | $2,700.00 | $3,000.00 |
| 1490 | Solid traffic stripe removed (paint) (701D007) | MI | 23 | $2,801.21 | $2,756.25 | $2,955.26 | $3,351.90 | $2,700.00 | $3,000.00 |
| 1500 | Broken traffic stripe removed (paint) (701D014) | MI | 7 | $2,801.21 | $2,756.25 | $2,955.26 | $3,351.90 | $2,700.00 | $3,000.00 |
| 1510 | Dotted temporary traffic stripe (paint) (701F001) | LF | 3,736 | $0.56 | $0.56 | $0.59 | $0.67 | $0.54 | $1.00 |
| 1520 | Dotted temporary traffic stripe (lane drop) (701F010) | LF | 3,749 | $0.25 | $0.24 | $0.26 | $0.29 | $0.24 | $1.00 |
| 1530 | Traffic control markings, class 2, type A (703A002) | SF | 5,081 | $6.16 | $6.07 | $6.50 | $7.37 | $5.94 | $6.60 |
| 1540 | Traffic control legends, class 2, type A (703B002) | SF | 1,255 | $6.72 | $6.62 | $7.09 | $8.04 | $6.48 | $7.25 |
| 1550 | Removal of existing traffic control markings or legends (paint) (703C000) | SF | 2,222 | $3.36 | $3.31 | $3.55 | $4.02 | $3.24 | $3.52 |
| 1560 | Temporary traffic control markings (paint) (703D002) | SF | 2,859 | $2.24 | $2.21 | $2.36 | $2.68 | $2.16 | $2.50 |
| 1570 | Temporary traffic control legends (paint) (703E002) | SF | 986 | $3.36 | $3.31 | $3.55 | $4.02 | $3.24 | $3.50 |
| 1580 | Pavement markers, class C, type 1- A (705A011) | EACH | 2,044 | $6.16 | $6.07 | $6.50 | $7.37 | $5.94 | $6.25 |
| 1590 | Pavement markers, class C, type 1- B (705A012) | EACH | 1,231 | $6.16 | $6.07 | $6.50 | $7.37 | $5.94 | $6.25 |
| 1600 | Pavement markers, class C, type 2- C (705A022) | EACH | 203 | $6.16 | $6.07 | $6.50 | $7.37 | $5.94 | $7.00 |
| 1610 | Pavement markers, class C, type 2- D (705A023) | EACH | 490 | $6.16 | $6.07 | $6.50 | $7.37 | $5.94 | $7.00 |
| 1620 | Pavement markers, class C, type 2- E (705A024) | EACH | 802 | $6.16 | $6.07 | $6.50 | $7.37 | $5.94 | $7.00 |
| 1630 | Pavement markers, class A-H, type 2-C (705A030) | EACH | 757 | $5.88 | $5.79 | $6.21 | $7.04 | $5.67 | $7.00 |
| 1640 | Pavement markers, class A-H, type 1-A (705A031) | EACH | 90 | $5.88 | $5.79 | $6.21 | $7.04 | $5.67 | $7.00 |
| 1650 | Pavement markers, class A-H, type 1-B (705A032) | EACH | 446 | $5.88 | $5.79 | $6.21 | $7.04 | $5.67 | $6.00 |
| 1660 | Pavement markers, class A-H, type 2-D (705A037) | EACH | 265 | $5.88 | $5.79 | $6.21 | $7.04 | $5.67 | $6.00 |
| 1670 | Pavement markers, class A-H, type 2-E (705A038) | EACH | 817 | $5.88 | $5.79 | $6.21 | $7.04 | $5.67 | $6.00 |
| 1675 | Class 10 aluminum flat sign panels (type XI background) (710A163) | SF | 186 | $26.62 | $26.46 | $28.37 | $32.18 | $25.92 | $30.00 |
| 1680 | Class 4, aluminum flat sign panels (type IV background) (710A171) | SF | 232 | $24.40 | $24.26 | $26.01 | $29.50 | $23.76 | $29.00 |
| 1690 | Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel) (710B021) | LF | 520 | $19.97 | $19.85 | $21.28 | $24.13 | $19.44 | $22.00 |
| 1700 | Permanent barricades (713A000) | LF | 22 | $305.05 | $303.19 | $325.08 | $368.71 | $297.00 | $650.00 |
| 1710 | Removal of existing traffic control unit ( morgan road at dublin lane) (730A000) | LS | 1 | $1,832.00 | $1,802.59 | $6,533.78 | $2,192.14 | $5,969.43 | $2,000.00 |
| 1720 | Removal of existing traffic control unit ( SR-150 at morgan road) (730A001) | LS | 1 | $1,832.00 | $1,802.59 | $17,970 | $2,192.14 | $16,418 | $2,000.00 |
| 1730 | Removal of existing traffic control unit ( SR-150 at lakeshore parkway (existing)) (730A002) | LS | 1 | $1,832.00 | $1,802.59 | $15,613 | $2,192.14 | $14,264 | $2,000.00 |
| 1740 | Furnishing and installing traffic control unit ( morgan road at dublin lane) (730C000) | LS | 1 | $14,796 | $14,559 | $19,144 | $17,705 | $17,490 | $16,500 |
| 1750 | Furnishing and installing traffic control unit ( SR-150 at lakeshore parkway (realigned)) (730C001) | LS | 1 | $20,354 | $20,027 | $15,998 | $24,355 | $14,616 | $22,000 |
| 1760 | Metal traffic signal pole foundation (730E000) | EACH | 5 | $4,481.94 | $4,410.00 | $10,054 | $5,363.04 | $9,185.13 | $5,000.00 |
| 1770 | Metal traffic signal strain pole (730G001) | EACH | 5 | $17,777 | $17,491 | $15,509 | $21,271 | $14,169 | $19,000 |
| 1780 | 1", non-metallic, conduit (730L003) | LF | 75 | $22.41 | $22.05 | $11.88 | $26.82 | $10.85 | $24.00 |
| 1790 | 2", non-metallic, conduit (730L005) | LF | 100 | $28.01 | $27.56 | $12.92 | $33.52 | $11.80 | $30.00 |
| 1800 | Luminaire extension assembly, 12' (730N000) | EACH | 4 | $2,913.26 | $2,866.50 | $2,761.10 | $3,485.98 | $2,522.61 | $3,150.00 |
| 1810 | Vehicular signal head, 12 inch, 3 (730P022) | EACH | 21 | $1,792.78 | $1,764.00 | $1,379.52 | $2,145.22 | $1,260.36 | $2,000.00 |
| 1820 | Vehicular signal head, 12 inch, 4 (730P023) | EACH | 3 | $2,128.92 | $2,094.75 | $1,771.68 | $2,547.44 | $1,618.65 | $2,280.00 |
| 1830 | Controller assembly, type NEMA, 16 channels (730R041) | EACH | 1 | $35,968 | $35,390 | $33,793 | $43,038 | $30,875 | $38,500 |
| 1840 | Electrical power service assembly with wood pole (730T010) | EACH | 1 | $4,722.85 | $4,647.04 | $5,090.44 | $5,651.30 | $4,650.75 | $5,000.00 |
| 1850 | Radar detection system ( morgan road at dublin lane) (730U400) | LS | 1 | $49,660 | $48,863 | $51,700 | $59,422 | $47,234 | $54,000 |
| 1860 | Radar detection system ( SR-150 at lakeshore parkway) (730U401) | LS | 1 | $49,660 | $48,863 | $54,847 | $59,422 | $50,110 | $54,000 |
| 1870 | Construction signs (740B000) | SF | 1,284 | $6.66 | $6.62 | $7.09 | $8.04 | $6.48 | $20.00 |
| 1880 | Channelizing drums (740D000) | EACH | 248 | $44.37 | $44.10 | $47.28 | $53.63 | $43.20 | $65.00 |
| 1890 | Cones (36 inches high) (740E000) | EACH | 300 | $26.62 | $26.46 | $28.37 | $32.18 | $25.92 | $60.00 |
| 1900 | Barricades, type III (740F002) | EACH | 38 | $205.22 | $203.96 | $218.69 | $248.04 | $199.80 | $450.00 |
| 1920 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 4 | $2,218.56 | $2,205.00 | $2,364.21 | $2,681.52 | $2,160.00 | $3,500.00 |
| 1930 | Portable changeable message sign, type 2 (742A001) | EACH | 7 | $7,764.97 | $7,717.50 | $8,274.73 | $9,385.32 | $7,560.00 | $8,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of August 29, 2025. Compiled by Mirage Metrics.