ALDOT contract 20250725001 bid tabulation
INTERCHANGE MODIFICATIONS ON SR-149 (LAKESHORE PARKWAY) AT THE I-65 INTERCHANGE IN HOMEWOOD. Let by Alabama DOT on July 25, 2025, Jefferson, 0301. 7 bids received; low bid $23,381,185 by Gillespie Construction, LLC.
- Owner
- Alabama DOT
- Letting
- 25 JUL 2025
- Pay items
- 254
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gillespie Construction, LLC | $23,381,185 | Low |
| 2 | Carcel & G. Construction, LLC | $25,109,472 | +7.0% |
| 3 | Wright Brothers Construction Company, Inc. | $25,278,002 | +8.0% |
| 4 | Russo Corporation | $25,321,038 | +8.0% |
| 5 | Dunn Construction Company, Inc. | $25,373,630 | +9.0% |
| 6 | Apac-Alabama, Inc. | $27,044,395 | +16% |
| 7 | Wiregrass Construction Company, Inc. | $27,445,938 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gillespie Construction, LLC | 2. Carcel & G. Construction, LLC | 3. Wright Brothers Construction Company, Inc. | 4. Russo Corporation | 5. Dunn Construction Company, Inc. | 6. Apac-Alabama, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (maximum allowable bid $ 8,000.00 per acre) (approximately 11 acres) (201A002) | LS | 1 | $88,000 | $87,000 | $88,000 | $88,000 | $88,000 | $88,000 |
| 0020 | Removing concrete pavement (206C001) | SY | 8,080 | $45.00 | $39.40 | $12.30 | $17.16 | $21.42 | $49.31 |
| 0030 | Removing concrete slope paving (206C002) | SY | 1,777 | $50.00 | $15.77 | $36.70 | $25.29 | $31.58 | $49.31 |
| 0040 | Removing concrete flumes (206C003) | SY | 1,052 | $55.00 | $9.42 | $36.20 | $17.26 | $21.55 | $54.79 |
| 0050 | Removing pipe (206D000) | LF | 140 | $75.00 | $43.53 | $32.80 | $64.12 | $80.08 | $82.18 |
| 0060 | Removing guardrail (206D001) | LF | 400 | $10.00 | $5.88 | $5.95 | $6.56 | $6.50 | $5.48 |
| 0070 | Removing curb (206D002) | LF | 4,938 | $25.00 | $28.47 | $19.70 | $14.33 | $17.90 | $27.39 |
| 0080 | Removing curb and gutter (206D003) | LF | 1,902 | $25.00 | $25.75 | $21.10 | $16.66 | $20.80 | $27.39 |
| 0090 | Removing safety barrier (206D010) | LF | 50 | $400.00 | $267.25 | $108.00 | $127.31 | $83.26 | $438.30 |
| 0100 | Removing fence (206D011) | LF | 290 | $20.00 | $26.55 | $28.90 | $10.54 | $13.16 | $21.92 |
| 0110 | Removing headwalls (206E000) | EACH | 1 | $1,250.00 | $1,523.27 | $880.00 | $937.69 | $1,487.58 | $931.39 |
| 0120 | Removing inlets (206E001) | EACH | 4 | $1,500.00 | $3,719.29 | $1,800.00 | $1,752.18 | $2,188.24 | $1,643.63 |
| 0130 | Removing guardrail end anchor (all type) (206E008) | EACH | 7 | $350.00 | $352.80 | $356.00 | $393.78 | $390.23 | $328.73 |
| 0140 | Removing inlets (partial) (206E042) | EACH | 2 | $5,500.00 | $5,533.11 | $1,800.00 | $910.83 | $1,137.49 | $6,026.65 |
| 0150 | Unclassified excavation (210A000) | CY | 23,370 | $36.00 | $30.63 | $43.00 | $41.05 | $51.26 | $38.35 |
| 0160 | Borrow excavation (210D000) | CY | 42,592 | $42.00 | $38.71 | $45.30 | $50.01 | $62.45 | $43.83 |
| 0170 | Structure excavation (214A000) | CY | 1,390 | $75.00 | $19.83 | $20.00 | $56.98 | $71.17 | $136.97 |
| 0180 | Foundation backfill, commercial (214B001) | CY | 445 | $100.00 | $82.12 | $118.00 | $94.28 | $117.75 | $109.58 |
| 0190 | Roadbed processing (230A000) | RBST | 110 | $1,500.00 | $1,726.66 | $1,040.00 | $1,439.75 | $1,798.05 | $1,643.63 |
| 0200 | Crushed aggregate, section 825, for miscellaneous use (305B077) | TON | 428 | $70.00 | $65.14 | $58.75 | $76.43 | $95.45 | $76.70 |
| 0210 | Tack coat (405A000) | GAL | 21,411 | $3.85 | $4.12 | $4.15 | $4.62 | $3.71 | $5.63 |
| 0220 | Planing existing pavement (approximately 1.10" thru 2.0" thick) (408A052) | SY | 48,737 | $2.35 | $3.11 | $3.15 | $3.50 | $2.51 | $3.23 |
| 0230 | Material remixing device (410H000) | EACH | 1 | $58,300 | $62,328 | $63,100 | $69,917 | $56,454 | $300,000 |
| 0240 | Smoothness testing, certified inertial profiler (410I000) | EACH | 1 | $6,600.00 | $7,056.00 | $7,100.00 | $7,915.15 | $6,264.52 | $10,220 |
| 0250 | Stone matrix asphalt wearing layer, 1/2" maximum aggregate size (423A003) | TON | 4,409 | $152.00 | $162.29 | $165.00 | $182.05 | $147.84 | $175.23 |
| 0260 | Stone matrix asphalt binder layer, 3/4" maximum aggregate size (423B002) | TON | 8,339 | $157.00 | $166.99 | $169.00 | $187.33 | $152.42 | $156.42 |
| 0270 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D (424A360) | TON | 580 | $165.00 | $176.40 | $179.00 | $197.88 | $160.29 | $172.74 |
| 0280 | Superpave bituminous concrete lower binder layer, 1" maximum aggregate size mix, esal range E (424B581) | TON | 16,674 | $105.00 | $110.54 | $137.00 | $124.00 | $100.36 | $127.10 |
| 0290 | Superpave bituminous concrete lower binder layer, patching, 1" maximum aggregate size mix, esal range E (424B585) | TON | 350 | $220.00 | $235.20 | $238.00 | $263.84 | $216.74 | $235.83 |
| 0300 | Superpave bituminous concrete lower binder layer, leveling, 1/2" maximum aggregate size mix, esal E (424B587) | TON | 1,812 | $119.00 | $127.01 | $129.00 | $142.47 | $116.12 | $161.77 |
| 0310 | Superpave bituminous concrete lower binder layer, leveling, 1" maximum aggregate size mix, esal range E (424B589) | TON | 2,717 | $112.00 | $118.78 | $120.00 | $133.24 | $108.62 | $152.26 |
| 0320 | Superpave bituminous concrete lower binder layer, widening, 1" maximum aggregate size mix, esal range E (424B592) | TON | 429 | $154.00 | $164.64 | $167.00 | $184.69 | $148.86 | $166.89 |
| 0330 | Superpave bituminous concrete upper binder layer, 3/4" maximum aggregate size mix, esal range C/D (424B650) | TON | 791 | $136.00 | $144.65 | $147.00 | $162.26 | $132.62 | $138.97 |
| 0340 | Aggregate surfacing (aldot #467) (430B002) | TON | 100 | $65.00 | $75.37 | $61.75 | $73.40 | $89.90 | $123.65 |
| 0350 | Steel reinforcement for bridge superstructure, eastbound station 310+75.89, westbound station 211+31.41, approx 11,470 pounds (502B000) | LS | 1 | $120,000 | $117,100 | $139,000 | $131,689 | $129,525 | $109,110 |
| 0360 | Bridge barrier rail, type 42" CSF median (510J002) | LF | 576 | $500.00 | $511.56 | $520.00 | $575.29 | $565.84 | $476.65 |
| 0370 | Retaining wall, number 1 (529A020) | SF | 339 | $500.00 | $466.04 | $294.00 | $134.90 | $168.46 | $288.81 |
| 0380 | Retaining wall, number 2 (529A021) | SF | 2,717 | $135.00 | $170.75 | $141.00 | $115.02 | $138.71 | $170.72 |
| 0390 | 18" roadway pipe (class 3 R.C.) (530A001) | LF | 1,023 | $250.00 | $202.22 | $117.00 | $83.87 | $104.75 | $312.37 |
| 0400 | 24" roadway pipe (class 3 R.C.) (530A002) | LF | 486 | $275.00 | $263.99 | $130.00 | $107.97 | $134.84 | $359.93 |
| 0410 | 18" roadway pipe, jacked installation (smooth steel) (530C001) | LF | 123 | $1,500.00 | $809.29 | $1,400.00 | $1,467.11 | $1,833.79 | $1,643.63 |
| 0420 | 18" roadway pipe rehabilitation (538A003) | LF | 55 | $490.00 | $523.32 | $750.00 | $656.97 | $578.84 | $536.37 |
| 0430 | 36" roadway pipe rehabilitation (538A006) | LF | 125 | $611.00 | $652.68 | $780.00 | $801.35 | $721.93 | $668.96 |
| 0440 | Hydroblasting (544A000) | SY | 128 | $625.00 | $676.01 | $780.00 | $336.14 | $886.89 | $739.63 |
| 0450 | Placing and finishing concrete overlay (544C000) | SY | 128 | $400.00 | $298.70 | $213.00 | $925.38 | $926.31 | $772.51 |
| 0460 | Concrete for overlay (544D000) | CY | 20 | $1,250.00 | $938.45 | $950.00 | $1,837.63 | $1,839.48 | $1,534.05 |
| 0470 | Mobilization (600A000) | LS | 1 | $2,050,000 | $3,849,246 | $3,025,000 | $2,115,666 | $1,750,000 | $3,213,224 |
| 0480 | Right of way markers (602A000) | EACH | 2 | $1,000.00 | $1,713.96 | $620.00 | $1,279.07 | $1,066.64 | $1,095.76 |
| 0490 | Loose riprap, class 2 (610C001) | TON | 31 | $100.00 | $97.54 | $91.50 | $84.41 | $105.41 | $109.58 |
| 0500 | Filter blanket, geotextile (610D003) | SY | 2,244 | $3.50 | $6.46 | $6.05 | $8.43 | $10.54 | $5.48 |
| 0510 | Slope paving (614A000) | CY | 675 | $1,050.00 | $877.65 | $945.00 | $860.00 | $1,074.02 | $1,095.75 |
| 0520 | Concrete sidewalk, 4" thick (618A000) | SY | 2,796 | $110.00 | $110.95 | $110.00 | $112.98 | $141.09 | $115.05 |
| 0530 | Detectable warning surface (618C001) | SF | 228 | $60.00 | $67.53 | $87.00 | $65.13 | $81.34 | $54.79 |
| 0540 | Curb ramp (618D000) | SY | 85 | $390.00 | $352.80 | $345.00 | $228.09 | $284.86 | $427.34 |
| 0550 | 18" roadway pipe end treatment, class 1 (619A002) | EACH | 4 | $2,500.00 | $3,578.42 | $1,200.00 | $2,193.20 | $2,739.00 | $2,739.38 |
| 0560 | 24" roadway pipe end treatment, class 1 (619A003) | EACH | 2 | $2,800.00 | $4,246.09 | $1,600.00 | $2,631.84 | $3,286.80 | $3,068.12 |
| 0570 | 24" roadway pipe end treatment, class 2 (619A053) | EACH | 1 | $3,800.00 | $5,284.32 | $2,000.00 | $2,631.83 | $3,286.79 | $4,163.87 |
| 0580 | Minor structure concrete (620A000) | CY | 2 | $3,500.00 | $5,785.63 | $2,600.00 | $3,655.33 | $4,565.00 | $3,835.14 |
| 0590 | Junction boxes, type 1 or 1P (621A011) | EACH | 6 | $8,800.00 | $7,495.71 | $5,900.00 | $6,946.54 | $8,675.26 | $9,642.63 |
| 0600 | Junction boxes, type partial (621A057) | EACH | 2 | $7,000.00 | $5,260.09 | $8,700.00 | $4,386.39 | $5,478.00 | $7,341.55 |
| 0610 | Inlets, type B (621C001) | EACH | 4 | $8,800.00 | $8,653.12 | $5,400.00 | $7,304.58 | $9,122.40 | $9,642.63 |
| 0620 | Inlets, type S1 or S3 (1 wing) (621C015) | EACH | 2 | $8,500.00 | $5,325.31 | $5,600.00 | $5,823.36 | $7,272.56 | $8,546.88 |
| 0630 | Inlets, type C or P1 (621C024) | EACH | 7 | $9,000.00 | $8,032.35 | $6,800.00 | $4,825.03 | $6,025.79 | $9,861.78 |
| 0640 | Inlet units, type B (621D001) | EACH | 3 | $2,500.00 | $655.18 | $1,800.00 | $2,771.99 | $3,461.83 | $2,739.38 |
| 0650 | Inlet units, type C or P1 (621D033) | EACH | 5 | $2,500.00 | $789.61 | $1,600.00 | $2,552.66 | $3,187.92 | $2,739.38 |
| 0660 | Concrete curb, type N (623B000) | LF | 912 | $60.00 | $37.63 | $54.25 | $58.49 | $73.04 | $54.79 |
| 0670 | Combination curb & gutter, type C (623C000) | LF | 2,537 | $55.00 | $41.16 | $54.25 | $55.83 | $73.62 | $49.31 |
| 0680 | Concrete median or safety barrier, type CSF-42 (629A095) | LF | 1,139 | $585.00 | $623.28 | $635.00 | $700.93 | $689.41 | $580.75 |
| 0690 | Concrete median or safety barrier, type CSF-42 (FO) (629A097) | LF | 50 | $882.00 | $943.15 | $960.00 | $1,060.66 | $1,043.22 | $878.79 |
| 0695 | Concrete median or safety barrier, type CSF-4A (629A107) | LF | 50 | $633.00 | $676.20 | $690.00 | $760.45 | $747.94 | $630.06 |
| 0700 | Steel beam guardrail, class A, type 2 (630A001) | LF | 913 | $30.00 | $29.40 | $29.60 | $32.81 | $32.52 | $27.39 |
| 0710 | Steel beam guardrail, class A, type 2 (double faced median barrier) (630A018) | LF | 400 | $50.00 | $52.92 | $53.25 | $59.07 | $58.53 | $49.31 |
| 0720 | Steel beam guardrail, class A, type 2 (8'-0" post) (630A034) | LF | 238 | $33.00 | $32.93 | $33.20 | $36.75 | $36.42 | $30.68 |
| 0730 | Guardrail end anchor, type 22 (630C041) | EACH | 1 | $12,000 | $11,172 | $11,300 | $12,470 | $12,357 | $10,410 |
| 0740 | Guardrail end anchor, type 8 (MASH) (630C077) | EACH | 8 | $1,500.00 | $1,411.20 | $1,400.00 | $1,575.11 | $1,560.93 | $1,314.91 |
| 0750 | Guardrail end anchor, type 13 (MASH) (630C079) | EACH | 6 | $3,850.00 | $4,116.00 | $4,100.00 | $4,594.08 | $4,552.71 | $3,835.14 |
| 0760 | Guardrail end anchor, type 20 series (MASH) (630C080) | EACH | 6 | $3,300.00 | $3,528.00 | $3,600.00 | $3,937.79 | $3,902.32 | $3,287.26 |
| 0770 | Industrial fence, 6 feet high (634A002) | LF | 550 | $75.00 | $56.45 | $56.50 | $56.44 | $58.53 | $49.31 |
| 0780 | Topsoil (650A000) | CY | 4,986 | $35.00 | $23.50 | $33.40 | $59.39 | $74.17 | $38.35 |
| 0790 | Solid sodding (bermuda) (654A001) | SY | 50,440 | $10.00 | $10.07 | $9.95 | $13.13 | $10.89 | $10.96 |
| 0800 | Temporary seeding (665A000) | ACRE | 21 | $1,500.00 | $1,679.73 | $1,100.00 | $525.04 | $1,188.52 | $1,643.63 |
| 0810 | Temporary mulching (665B001) | TON | 96 | $400.00 | $1,040.01 | $840.00 | $590.67 | $924.41 | $438.30 |
| 0820 | Polyethylene (665E000) | SY | 500 | $2.00 | $5.41 | $3.60 | $6.56 | $3.96 | $2.19 |
| 0830 | Sand bags (665G000) | EACH | 2,750 | $5.00 | $10.88 | $7.80 | $13.13 | $8.58 | $5.48 |
| 0840 | Silt fence (665J002) | LF | 4,935 | $6.00 | $6.18 | $5.10 | $6.56 | $5.61 | $6.57 |
| 0850 | Temporary coarse aggregate,aldot number 1 (665N000) | TON | 800 | $70.00 | $71.78 | $75.50 | $75.40 | $94.16 | $76.70 |
| 0860 | Silt fence removal (665O001) | LF | 4,935 | $1.00 | $2.56 | $1.50 | $0.66 | $1.65 | $1.10 |
| 0870 | Inlet protection, stage 3 or 4 (665P005) | EACH | 44 | $350.00 | $905.62 | $690.00 | $525.04 | $759.33 | $301.33 |
| 0880 | Wattle (665Q002) | LF | 4,600 | $10.00 | $10.14 | $8.75 | $13.13 | $9.57 | $10.96 |
| 0890 | Pest control treatment (666A001) | ACRE | 21 | $200.00 | $278.37 | $301.00 | $131.26 | $330.15 | $5.48 |
| 0900 | Construction safety fence (674A000) | LF | 1,000 | $5.00 | $4.65 | $3.25 | $12.03 | $4.09 | $5.48 |
| 0910 | Geometric controls (680A001) | LS | 1 | $275,000 | $199,137 | $208,000 | $272,195 | $445,307 | $954,611 |
| 0920 | Construction fuel (maximum bid limited to $ 1,276,959.00) (698A000) | LS | 1 | $0.00 | $0.00 | $0.01 | $0.01 | $0.00 | $0.00 |
| 0930 | Solid white, class 2, type A traffic stripe (5" wide) (701A227) | MI | 3 | $4,620.00 | $4,939.20 | $5,100.00 | $5,512.90 | $5,463.25 | $4,602.16 |
| 0940 | Solid yellow, class 2, type A traffic stripe (5" wide) (701A230) | MI | 2 | $4,620.00 | $4,939.20 | $5,100.00 | $5,512.90 | $5,463.25 | $4,602.17 |
| 0950 | Broken white, class 2, type A traffic stripe (5" wide) (701A239) | MI | 3 | $2,775.00 | $2,963.52 | $3,000.00 | $3,307.74 | $3,277.95 | $2,761.30 |
| 0960 | Dotted, class W, type A traffic stripe (5" wide) (701B027) | LF | 1,542 | $3.50 | $3.53 | $3.60 | $3.94 | $3.90 | $3.29 |
| 0970 | Dotted class W,type B traffic stripe,black(5" wide) (701B036) | LF | 1,542 | $5.50 | $5.88 | $6.00 | $6.56 | $6.50 | $5.48 |
| 0980 | Dotted, class W, type A traffic stripe(lane drop 10" wide) (701B059) | LF | 547 | $6.60 | $7.06 | $7.20 | $7.88 | $7.80 | $6.57 |
| 0990 | Dotted, class 2, type A traffic stripe(lane drop 10" wide) (701B063) | LF | 2,926 | $3.60 | $3.82 | $3.90 | $4.27 | $4.23 | $3.56 |
| 1000 | Dotted, class 2, type A traffic stripe (5" wide) (701B207) | LF | 5,870 | $2.50 | $2.06 | $2.10 | $2.30 | $2.28 | $1.92 |
| 1010 | Broken temporary traffic stripe (paint) (701C002) | MI | 9 | $1,500.00 | $1,411.20 | $1,400.00 | $1,575.11 | $1,560.93 | $1,314.90 |
| 1020 | Solid temporary traffic stripe (paint) (701C003) | MI | 14 | $1,500.00 | $1,411.20 | $1,400.00 | $1,575.11 | $1,560.93 | $1,314.90 |
| 1030 | Solid temporary traffic stripe (tape) (701C005) | MI | 2 | $11,000 | $11,172 | $11,400 | $12,470 | $12,357 | $10,410 |
| 1040 | Dotted temporary traffic stripe (paint) (701F001) | LF | 11,740 | $0.40 | $0.27 | $0.30 | $0.30 | $0.30 | $0.25 |
| 1050 | Broken white, class W, type A traffic stripe (5" wide) (701G142) | LF | 577 | $3.30 | $3.53 | $3.60 | $3.94 | $3.90 | $3.29 |
| 1060 | Solid white, class W, type A traffic stripe (5"wide) (701G146) | LF | 2,394 | $6.00 | $5.88 | $6.00 | $6.56 | $6.50 | $5.48 |
| 1070 | Solid yellow, class W, type A traffic stripe (5" wide) (701G154) | LF | 577 | $6.00 | $5.88 | $6.00 | $6.56 | $6.50 | $5.48 |
| 1080 | Solid traffic stripe removed (paint) (701H000) | LF | 73,785 | $0.61 | $0.65 | $0.65 | $0.72 | $0.72 | $0.60 |
| 1090 | Broken traffic stripe removed (paint) (701H005) | LF | 45,135 | $0.60 | $0.59 | $0.60 | $0.66 | $0.65 | $0.55 |
| 1100 | Broken traffic stripe removed (tape) (701H007) | LF | 5,942 | $1.20 | $1.18 | $1.20 | $1.31 | $1.30 | $1.10 |
| 1110 | Dotted traffic stripe removed (paint) (701H010) | LF | 11,740 | $0.55 | $0.59 | $0.60 | $0.66 | $0.65 | $0.55 |
| 1120 | Traffic control markings, class 2, type A (703A002) | SF | 13,614 | $0.55 | $6.47 | $6.60 | $7.22 | $7.15 | $6.03 |
| 1130 | Traffic control markings, class W, type A (703A011) | SF | 2,528 | $16.00 | $17.06 | $17.45 | $19.03 | $18.86 | $15.89 |
| 1140 | Traffic control legends, class 2, type A (703B002) | SF | 863 | $7.00 | $7.06 | $7.20 | $7.88 | $7.80 | $6.57 |
| 1150 | Traffic control legends, class W, type A (703B011) | SF | 113 | $22.00 | $23.52 | $24.10 | $26.25 | $26.02 | $21.92 |
| 1160 | Removal of existing traffic control markings or legends (paint) (703C000) | SF | 28,954 | $3.30 | $3.53 | $3.60 | $3.94 | $3.90 | $3.29 |
| 1170 | Temporary traffic control markings (paint) (703D002) | SF | 27,228 | $3.00 | $2.95 | $3.00 | $3.28 | $3.25 | $2.74 |
| 1180 | Temporary traffic control legends (paint) (703E002) | SF | 1,726 | $3.30 | $3.53 | $3.60 | $3.94 | $3.90 | $3.29 |
| 1190 | Specialty traffic control markings (703H000) | SF | 720 | $39.00 | $40.87 | $41.80 | $45.61 | $45.20 | $38.08 |
| 1200 | Pavement markers, class C, type 1- A (705A011) | EACH | 222 | $8.25 | $8.83 | $9.05 | $9.84 | $9.76 | $8.22 |
| 1210 | Pavement markers, class C, type 2- C (705A022) | EACH | 471 | $8.25 | $8.83 | $6.00 | $9.84 | $9.76 | $8.22 |
| 1220 | Pavement markers, class A-H, type 2-C (705A030) | EACH | 381 | $6.00 | $5.88 | $6.00 | $6.56 | $6.50 | $5.48 |
| 1230 | Pavement markers, class A-H, type 1-A (705A031) | EACH | 98 | $6.00 | $5.88 | $6.00 | $6.56 | $6.50 | $5.48 |
| 1240 | Pavement markers, class A-H, type 1-B (705A032) | EACH | 27 | $6.00 | $5.88 | $6.00 | $6.56 | $6.50 | $5.48 |
| 1250 | Pavement markers, class A-H, type 2-E (705A038) | EACH | 33 | $6.00 | $5.88 | $6.00 | $6.56 | $6.50 | $5.48 |
| 1260 | Milepost, type A (709A000) | EACH | 1 | $330.00 | $352.80 | $361.00 | $525.04 | $231.11 | $328.72 |
| 1270 | Class 9, aluminum flat sign panels (type XI background) (710A153) | SF | 285 | $32.00 | $34.10 | $34.90 | $34.13 | $31.69 | $31.78 |
| 1280 | Class 9, aluminum flat sign panels (type XI background, fluorescent) (710A154) | SF | 79 | $32.00 | $34.10 | $34.90 | $36.75 | $33.01 | $31.78 |
| 1290 | Class 4, aluminum flat sign panels (type IV background) (710A171) | SF | 612 | $29.00 | $30.58 | $31.30 | $31.50 | $26.41 | $28.49 |
| 1300 | Class 2A aluminum flat sign panels (type IV background) (710A181) | SF | 99 | $46.50 | $49.39 | $50.50 | $55.69 | $27.73 | $46.02 |
| 1310 | Class 6 aluminum flat sign panels (type IV or XI background) (710A186) | SF | 198 | $46.50 | $49.39 | $50.50 | $55.69 | $40.94 | $46.02 |
| 1320 | Class 6 aluminum multiple flat sign panels (type IV or XI background) (710A188) | SF | 483 | $46.50 | $49.39 | $50.50 | $55.69 | $40.94 | $46.02 |
| 1330 | Roadway sign post (W8 X 18 steel beam) (710B008) | LF | 57 | $192.00 | $205.80 | $211.00 | $232.02 | $217.90 | $191.76 |
| 1340 | Roadway sign post (W6 X 9 steel beam) (710B010) | LF | 89 | $138.00 | $147.00 | $150.00 | $165.73 | $231.10 | $136.97 |
| 1350 | Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel) (710B021) | LF | 1,372 | $19.00 | $19.41 | $19.85 | $23.63 | $26.41 | $18.08 |
| 1360 | Removal of existing roadway signs (710C000) | LS | 1 | $20,000 | $20,580 | $21,100 | $13,782 | $23,770 | $19,176 |
| 1370 | Roadway sign relocation (711A000) | LS | 1 | $5,000.00 | $2,940.00 | $3,000.00 | $3,314.63 | $15,847 | $2,739.39 |
| 1380 | Overhead roadway sign structure ohs-1 (715A001) | LS | 1 | $170,000 | $182,280 | $186,500 | $205,507 | $226,786 | $169,842 |
| 1390 | Overhead roadway sign structure ohs-2 (715A002) | LS | 1 | $81,400 | $87,024 | $89,100 | $98,113 | $154,705 | $81,086 |
| 1400 | Overhead roadway sign structure ohs-3 (715A003) | LS | 1 | $107,800 | $115,248 | $117,900 | $129,934 | $106,967 | $107,384 |
| 1410 | Overhead roadway sign structure ohs-4 (715A004) | LS | 1 | $105,600 | $112,896 | $115,500 | $127,282 | $76,594 | $105,192 |
| 1420 | Portable concrete safety barriers, type 6 (726A000) | LF | 2,310 | $77.00 | $64.68 | $66.25 | $72.19 | $67.25 | $56.65 |
| 1430 | Portable concrete safety barriers, type 6-A (726A001) | LF | 40 | $75.00 | $29.40 | $30.10 | $32.81 | $30.57 | $25.75 |
| 1440 | Portable impact attenuator assembly (unidirectional,TL-3) (726D025) | EACH | 4 | $15,000 | $14,700 | $15,000 | $14,110 | $15,284 | $12,875 |
| 1450 | Truck mounted impact attenuator unit (728A000) | EACH | 1 | $32,000 | $47,018 | $58,100 | $51,848 | $13,008 | $75,000 |
| 1460 | Fiber optic trunk cable, 48F (729A002) | LF | 14,415 | $3.55 | $1.92 | $1.95 | $4.26 | $4.22 | $1.79 |
| 1470 | Fiber optic drop cable, 12F (729A101) | LF | 367 | $10.95 | $2.77 | $2.85 | $13.21 | $13.09 | $2.58 |
| 1480 | Fiber distribution unit, secondary (729B010) | EACH | 4 | $1,750.00 | $1,616.06 | $1,700.00 | $2,100.15 | $2,081.24 | $1,505.79 |
| 1490 | Fan-out kit (729B020) | EACH | 9 | $145.00 | $81.01 | $83.00 | $172.36 | $170.81 | $75.49 |
| 1500 | FO patch cable, duplex, ST-LC, 2 meter (729B271) | EACH | 18 | $75.00 | $202.36 | $207.00 | $90.16 | $89.35 | $188.56 |
| 1510 | Network device, type C (fmes) (729C020) | EACH | 5 | $2,950.00 | $3,283.86 | $3,400.00 | $3,536.05 | $3,504.21 | $3,059.78 |
| 1520 | Camera, positioner (729D102) | EACH | 4 | $10,850 | $11,560 | $11,800 | $13,077 | $12,959 | $10,771 |
| 1530 | Conduit, underground, non-metallic, 2 inch (729I101) | LF | 24,232 | $10.40 | $17.40 | $17.80 | $10.54 | $12.43 | $16.22 |
| 1540 | Conduit, rigid metallic, 2 inch (729I201) | LF | 964 | $53.00 | $39.51 | $40.40 | $63.64 | $63.07 | $36.82 |
| 1550 | Conductor, 6 AWG (729I701) | LF | 1,260 | $4.15 | $4.03 | $4.15 | $4.99 | $4.94 | $3.76 |
| 1560 | Locate tone wire (729I800) | LF | 14,415 | $0.92 | $0.84 | $0.85 | $1.10 | $1.09 | $0.78 |
| 1570 | ITS cabinet, pole mount, type 336S (729J024) | EACH | 1 | $10,775 | $7,187.00 | $7,400.00 | $12,975 | $12,858 | $6,696.58 |
| 1580 | Electrical power service (ITS cabinet) (site 1) (729K050) | EACH | 1 | $7,625.00 | $17,002 | $17,400 | $9,178.88 | $9,096.22 | $15,842 |
| 1590 | Pole, concrete (50 FT agl) (729L005) | EACH | 1 | $22,000 | $44,163 | $45,200 | $25,674 | $25,443 | $41,149 |
| 1600 | Miscellaneous infrastructure, fusion splicing (729N000) | EACH | 268 | $48.00 | $56.15 | $57.50 | $57.01 | $56.50 | $52.31 |
| 1610 | Miscellaneous infrastructure, splice closure, underground, 12 fiber (729N111) | EACH | 2 | $950.00 | $1,030.62 | $1,100.00 | $1,144.21 | $1,133.90 | $960.29 |
| 1620 | Miscellaneous infrastructure, splice closure, underground, 48 fiber (729N114) | EACH | 6 | $1,150.00 | $1,030.60 | $1,100.00 | $1,366.96 | $1,354.64 | $960.27 |
| 1630 | Miscellaneous infrastructure, splice closure, underground, 144 fiber (729N118) | EACH | 1 | $1,400.00 | $1,671.84 | $1,700.00 | $1,674.56 | $1,659.48 | $1,557.75 |
| 1640 | Miscellaneous infrastructure, commbox, type F1 (729N301) | EACH | 4 | $2,555.00 | $2,010.68 | $2,100.00 | $3,079.96 | $3,052.22 | $1,873.48 |
| 1650 | Miscellaneous infrastructure, commbox, type F2 (729N302) | EACH | 19 | $3,500.00 | $3,186.33 | $3,300.00 | $4,152.15 | $4,114.75 | $2,968.91 |
| 1660 | Miscellaneous infrastructure, pull box (24 in X 24 in X 12 in) (729N400) | EACH | 3 | $3,800.00 | $5,019.78 | $5,100.00 | $4,534.42 | $4,493.58 | $4,677.25 |
| 1670 | Miscellaneous infrastructure, fiber marker post (729N500) | EACH | 29 | $180.00 | $74.77 | $76.50 | $216.11 | $214.17 | $69.67 |
| 1680 | Removal of existing traffic control unit ( lakeshore parkway at I-65 southbound) (730A000) | LS | 1 | $6,000.00 | $5,844.72 | $6,000.00 | $6,599.49 | $6,464.85 | $5,445.90 |
| 1690 | Removal of existing traffic control unit ( lakeshore parkway at I-65 northbound) (730A001) | LS | 1 | $3,950.00 | $3,998.40 | $4,100.00 | $4,514.74 | $4,422.63 | $3,725.56 |
| 1700 | Removal of existing traffic control unit ( lakeshore parkway at wildwood parkway) (730A002) | LS | 1 | $4,200.00 | $4,351.20 | $4,500.00 | $4,913.11 | $4,812.86 | $4,054.29 |
| 1710 | Removal of existing traffic control unit ( lakeshore parkway at green springs highway) (730A003) | LS | 1 | $4,000.00 | $3,957.24 | $4,000.00 | $4,468.27 | $4,377.10 | $3,687.21 |
| 1720 | Removal of existing traffic control unit (temporary) ( lakeshore parkway at southbound ramps) (730A053) | LS | 1 | $8,500.00 | $8,914.08 | $9,100.00 | $10,065 | $9,859.86 | $8,305.81 |
| 1730 | Removal of existing traffic control unit (temporary) ( lakeshore parkway at northbound ramps) (730A054) | LS | 1 | $7,200.00 | $7,514.64 | $7,700.00 | $8,485.06 | $8,311.95 | $7,001.87 |
| 1740 | Furnishing and installing traffic control unit ( lakeshore parkway at I-65 southbound) (730C000) | LS | 1 | $54,000 | $56,489 | $57,800 | $63,784 | $62,483 | $52,635 |
| 1750 | Furnishing and installing traffic control unit ( lakeshore parkway at wildwood parkway) (730C001) | LS | 1 | $19,500 | $20,445 | $20,900 | $23,085 | $22,614 | $19,050 |
| 1760 | Furnishing and installing traffic control unit ( lakeshore parkway at green springs highway) (730C002) | LS | 1 | $21,500 | $21,397 | $21,900 | $24,161 | $23,668 | $19,937 |
| 1770 | Furnishing and installing traffic control unit (temporary)( lakeshore parkway at southbound ramps) (730C030) | LS | 1 | $47,750 | $50,051 | $51,200 | $56,514 | $55,361 | $46,635 |
| 1780 | Furnishing and installing traffic control unit (temporary) ( lakeshore parkway at northbound ramps) (730C031) | LS | 1 | $17,700 | $18,845 | $19,300 | $21,279 | $20,845 | $17,559 |
| 1790 | Metal traffic signal pole foundation (730E000) | EACH | 6 | $6,670.00 | $6,820.80 | $7,000.00 | $7,701.62 | $7,544.49 | $6,355.37 |
| 1800 | Metal traffic signal pole with 60' mast arm assembly (730F000) | EACH | 3 | $33,500 | $34,245 | $35,000 | $38,667 | $37,879 | $31,908 |
| 1810 | Metal traffic signal pole with 45' mast arm assembly (730F001) | EACH | 1 | $21,750 | $22,838 | $23,400 | $25,787 | $25,261 | $21,280 |
| 1820 | Metal traffic signal pole with 35' mast arm assembly (730F002) | EACH | 1 | $19,500 | $19,968 | $20,400 | $22,547 | $22,087 | $18,606 |
| 1830 | Metal traffic signal strain pole (730G001) | EACH | 1 | $15,350 | $16,129 | $16,500 | $18,212 | $17,840 | $15,028 |
| 1840 | Wood traffic signal strain pole (730G005) | EACH | 9 | $4,000.00 | $3,551.52 | $3,600.00 | $4,010.15 | $3,928.34 | $3,309.18 |
| 1850 | Traffic signal junction box type S1 (730K001) | EACH | 16 | $1,850.00 | $1,893.36 | $1,900.00 | $2,137.86 | $2,094.25 | $1,764.16 |
| 1860 | Traffic signal junction box type S2 (730K002) | EACH | 4 | $1,800.00 | $1,852.20 | $1,900.00 | $2,091.39 | $2,048.72 | $1,725.81 |
| 1870 | 1", non-metallic, conduit (730L003) | LF | 200 | $21.50 | $21.76 | $22.30 | $24.57 | $24.06 | $20.27 |
| 1880 | 2", metallic, conduit (730L004) | LF | 321 | $35.00 | $35.87 | $36.70 | $40.50 | $39.67 | $33.42 |
| 1890 | 2", non-metallic, conduit (730L005) | LF | 2,944 | $8.00 | $7.76 | $7.95 | $8.76 | $8.59 | $7.23 |
| 1900 | 3", non-metallic, conduit (730L007) | LF | 200 | $11.00 | $11.11 | $11.35 | $12.55 | $12.29 | $10.35 |
| 1910 | Luminaire extension assembly, 12 feet (730N010) | EACH | 5 | $2,590.00 | $2,648.35 | $2,700.00 | $2,990.35 | $2,929.34 | $2,467.64 |
| 1920 | Luminaire extension assembly, 15 feet (730N011) | EACH | 2 | $3,500.00 | $3,580.92 | $3,700.00 | $4,043.35 | $3,960.86 | $3,336.57 |
| 1930 | Vehicular signal head, 12 inch, 3 (730P022) | EACH | 68 | $2,100.00 | $2,034.48 | $2,100.00 | $2,297.21 | $2,250.34 | $1,895.65 |
| 1940 | Pedestrian signal head, type LED (730P100) | EACH | 6 | $1,600.00 | $1,634.64 | $1,700.00 | $1,845.73 | $1,808.08 | $1,523.10 |
| 1950 | Miscellaneous equipment, pedestrian push button (730Q001) | EACH | 6 | $1,325.00 | $1,346.52 | $1,400.00 | $1,520.41 | $1,489.39 | $1,254.64 |
| 1960 | Miscellaneous equipment, pedestal pole and foundation (730Q005) | EACH | 4 | $4,950.00 | $5,062.68 | $5,200.00 | $5,716.46 | $5,599.83 | $4,717.22 |
| 1970 | Controller assembly, type NEMA, 16 channels (730R041) | EACH | 5 | $27,375 | $27,989 | $28,600 | $31,603 | $30,958 | $26,079 |
| 1980 | Controller unit, type NEMA (730R151) | EACH | 5 | $6,450.00 | $6,585.60 | $6,700.00 | $7,436.05 | $7,284.33 | $6,136.22 |
| 1990 | Electrical power service assembly with wood pole (730T010) | EACH | 1 | $6,000.00 | $5,838.84 | $6,000.00 | $6,592.85 | $6,458.34 | $5,440.42 |
| 2000 | Uninterruptable power supply system, managed (730T022) | EACH | 1 | $16,000 | $16,282 | $16,700 | $18,384 | $18,009 | $15,171 |
| 2010 | Radar detection system ( lakeshore parkway at I-65 southbound) (730U400) | LS | 1 | $64,500 | $65,474 | $67,000 | $73,929 | $72,421 | $61,006 |
| 2020 | Radar detection system ( lakeshore parkway at I-65 northbound) (730U401) | LS | 1 | $52,550 | $53,708 | $55,000 | $60,644 | $59,406 | $50,043 |
| 2030 | Radar detection system ( lakeshore parkway at wildwood parkway) (730U402) | LS | 1 | $75,000 | $75,088 | $76,800 | $84,784 | $83,054 | $69,964 |
| 2040 | Radar detection system ( lakeshore parkway at green springs highway) (730U403) | LS | 1 | $75,000 | $75,088 | $76,800 | $84,784 | $83,054 | $69,964 |
| 2050 | Removal of fiber optic cable ( I-65 trunk) (734X000) | LS | 1 | $21,500 | $21,656 | $22,200 | $16,215 | $16,069 | $20,178 |
| 2060 | Removal of ITS infrastructure ( I-65 at lakeshore parkway) (734X010) | LS | 1 | $22,500 | $22,844 | $23,400 | $12,330 | $12,219 | $21,285 |
| 2070 | Construction signs (740B000) | SF | 2,317 | $12.00 | $7.06 | $7.20 | $7.88 | $7.80 | $10.96 |
| 2080 | Special construction signs (740C000) | SF | 308 | $12.00 | $7.06 | $7.20 | $7.88 | $7.80 | $27.39 |
| 2090 | Channelizing drums (740D000) | EACH | 1,100 | $50.00 | $42.34 | $43.30 | $47.25 | $46.83 | $82.18 |
| 2100 | Cones (36 inches high) (740E000) | EACH | 100 | $38.00 | $23.52 | $24.10 | $26.25 | $26.02 | $27.39 |
| 2110 | Barricades, type III (740F002) | EACH | 30 | $250.00 | $176.40 | $181.00 | $196.89 | $195.12 | $542.40 |
| 2120 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 2 | $7,500.00 | $2,822.40 | $2,900.00 | $3,150.23 | $3,121.86 | $10,228 |
| 2130 | Portable changeable message sign, type 2 (742A001) | EACH | 8 | $12,500 | $7,526.40 | $7,700.00 | $8,400.61 | $8,324.95 | $33,411 |
| 2140 | Uniformed police officer (745A000) | HR | 7,500 | $75.00 | $74.26 | $77.00 | $85.32 | $84.55 | $88.64 |
| 2150 | High mast luminaire assembly with three, LED, 400 watt equivalent luminaires (750A261) | EACH | 2 | $52,750 | $53,908 | $55,200 | $60,869 | $59,627 | $50,229 |
| 2160 | High mast luminaire assembly with four, LED, 400 watt equivalent luminaires (750A262) | EACH | 7 | $56,500 | $57,471 | $58,800 | $64,893 | $63,569 | $53,549 |
| 2170 | Roadway luminaire assembly with one, LED low profile underpass pendant, 150 watt luminaire (750B571) | EACH | 4 | $2,600.00 | $2,628.36 | $2,700.00 | $2,967.78 | $2,907.23 | $2,449.01 |
| 2180 | Roadway luminaire assembly with one, LED, 250 watt equivalent luminaire (750B601) | EACH | 10 | $8,225.00 | $8,408.40 | $8,600.00 | $9,494.24 | $9,300.53 | $7,834.64 |
| 2190 | Roadway luminaire assembly with one, LED, 400 watt equivalent luminaire (750B602) | EACH | 48 | $8,750.00 | $8,902.32 | $9,200.00 | $10,052 | $9,846.85 | $8,294.85 |
| 2200 | Roadway luminaire assembly with two, LED, 400 watt equivalent luminaire (750B607) | EACH | 31 | $9,450.00 | $9,549.12 | $9,800.00 | $10,782 | $10,562 | $8,897.52 |
| 2210 | Pole foundation,roadway (750C010) | EACH | 89 | $3,450.00 | $3,492.72 | $3,600.00 | $3,943.76 | $3,863.30 | $3,254.39 |
| 2220 | Pole foundation, high mast (750C011) | EACH | 9 | $9,850.00 | $10,025 | $10,300 | $11,320 | $11,089 | $9,341.30 |
| 2230 | Electrical junction box,type 1 (750D200) | EACH | 25 | $2,100.00 | $2,146.20 | $2,200.00 | $2,423.35 | $2,373.91 | $1,999.75 |
| 2240 | Conduit,3/4 inch, rigid nonmetallic (750E111) | LF | 500 | $4.25 | $4.36 | $4.45 | $4.91 | $4.81 | $4.05 |
| 2245 | Conduit, 1 inch, rigid nonmetallic (750E112) | LF | 1,200 | $5.75 | $5.70 | $5.85 | $6.44 | $6.31 | $5.31 |
| 2260 | Conduit,2 inch,rigid nonmetallic (750E115) | LF | 50 | $24.00 | $24.52 | $25.10 | $27.69 | $27.12 | $22.85 |
| 2270 | Conduit, 3/4 inch, rigid metallic (750E123) | LF | 575 | $12.85 | $13.11 | $13.40 | $14.81 | $14.50 | $12.22 |
| 2280 | Conduit, 2 inch, rigid metallic (750E127) | LF | 1,150 | $23.50 | $23.76 | $24.30 | $26.82 | $26.28 | $22.13 |
| 2290 | Conduit, 3 inch, rigid metallic (750E129) | LF | 350 | $44.50 | $45.28 | $46.30 | $51.12 | $50.08 | $42.19 |
| 2300 | Conductor, #10 AWG (750F022) | LF | 5,350 | $2.00 | $1.88 | $1.95 | $2.12 | $2.08 | $1.75 |
| 2310 | Conductor, #2 AWG (750F026) | LF | 2,100 | $6.25 | $6.29 | $6.45 | $7.10 | $6.96 | $5.86 |
| 2320 | Conductor, #1/0 AWG (750F027) | LF | 5,500 | $7.60 | $7.71 | $7.90 | $8.70 | $8.52 | $7.18 |
| 2330 | Conductor, #3/0 AWG (750F029) | LF | 150 | $11.00 | $11.18 | $11.45 | $12.61 | $12.36 | $10.41 |
| 2340 | Combined duct and cable,2 #6 AWG/ 1 #6 AWG GND (750G010) | LF | 8,270 | $13.45 | $13.76 | $14.10 | $15.54 | $15.22 | $12.82 |
| 2350 | Combined duct and cable,2 #4 AWG/ 1 #4 AWG GND (750G100) | LF | 900 | $18.00 | $18.29 | $18.70 | $20.65 | $20.23 | $17.04 |
| 2360 | Combined duct and cable,2 #2 AWG/ 1 #2 AWG GND (750G110) | LF | 8,700 | $22.25 | $22.76 | $23.30 | $25.69 | $25.17 | $21.20 |
| 2370 | Combined duct and cable, 2 #1/0 AWG/ 1 #1/0 AWG GND (750G120) | LF | 6,950 | $37.50 | $38.34 | $39.20 | $43.29 | $42.41 | $35.72 |
| 2380 | Service pole (750H005) | EACH | 1 | $3,750.00 | $3,822.00 | $3,900.00 | $4,315.56 | $4,227.51 | $3,561.19 |
| 2390 | Lighting control center, special (750I016) | EACH | 1 | $61,000 | $61,675 | $63,100 | $69,640 | $68,219 | $57,467 |
| 2400 | Roadway lighting (barrier-mounted pedestrian lighting) (750Z310) | LS | 1 | $210,000 | $211,680 | $216,600 | $239,016 | $234,139 | $197,236 |
| 2410 | Remove luminaire pole foundation, high mast (751J005) | EACH | 7 | $4,625.00 | $4,715.76 | $7,500.00 | $3,279.36 | $4,095.46 | $4,393.97 |
| 2420 | Remove luminaire pole foundation, concrete (751J006) | EACH | 45 | $3,190.00 | $3,251.64 | $6,000.00 | $1,631.43 | $2,037.43 | $3,029.76 |
| 2430 | Remove lighting control center, 6 circuit (751L002) | EACH | 2 | $650.00 | $658.56 | $670.00 | $743.61 | $728.44 | $613.63 |
| 2440 | Remove service pole (751L015) | EACH | 2 | $350.00 | $341.04 | $349.00 | $385.08 | $377.23 | $317.77 |
| 2450 | Remove roadway luminaire assembly (751L025) | EACH | 47 | $230.00 | $235.20 | $241.00 | $265.57 | $260.15 | $219.15 |
| 2460 | Remove high mast luminaire assembly (751L037) | EACH | 7 | $4,250.00 | $4,339.44 | $4,400.00 | $4,899.82 | $4,799.85 | $4,043.33 |
| 2470 | Remove conductors (751M000) | LS | 1 | $2,600.00 | $2,646.00 | $2,700.00 | $2,987.70 | $2,926.74 | $2,465.45 |
| 2480 | Remove conductors and conduits (751M002) | LS | 1 | $4,500.00 | $4,598.16 | $4,700.00 | $5,191.96 | $5,086.02 | $4,284.40 |
| 2490 | 4" electrical conduit, 1 line, type 5 installation (756A022) | LF | 680 | $92.00 | $94.08 | $96.25 | $106.23 | $104.06 | $87.66 |
| 2500 | 6" electrical conduit, 1 line, type 5 installation (756A028) | LF | 1,447 | $110.00 | $129.61 | $133.00 | $123.03 | $123.51 | $107.65 |
| 2510 | 6 inch electrical conduit, 2 lines, type 5 installation (756A042) | LF | 300 | $250.00 | $256.04 | $262.00 | $289.10 | $198.40 | $238.57 |
| 2520 | 8" electrical conduit, 1 line, type 5 installation (756A057) | LF | 203 | $190.00 | $188.16 | $193.00 | $212.46 | $208.12 | $175.32 |
| 2530 | Trainee hours at 80 cents per hour (999 000) | HR | 1,760 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of July 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.