ALDOT contract 20251205002 bid tabulation
BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, LIGHTING, & BRIDGE) ON SR-2 (US-72) OVER SR-20 IN FLORENCE. Let by Alabama DOT on December 5, 2025, Lauderdale, 0201. 3 bids received; low bid $7,247,268 by Miller & Miller, Inc..
- Owner
- Alabama DOT
- Letting
- 05 DEC 2025
- Pay items
- 161
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Miller & Miller, Inc. | $7,247,268 | Low |
| 2 | Carcel & G. Construction, LLC | $7,788,353 | +7.0% |
| 3 | Rogers Group, Inc. | $8,033,559 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Miller & Miller, Inc. | 2. Carcel & G. Construction, LLC | 3. Rogers Group, Inc. |
|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (maximum allowable bid $ 8,000.00 per acre) (approximately 2 acres) (201A002) | LS | 1 | $16,000 | $13,847 | $16,000 |
| 0020 | Removal of structures, structure no. 1 (205A001) | EACH | 1 | $9,500.00 | $7,541.40 | $6,046.72 |
| 0030 | Removal of structures, structure no. 2 (205A002) | EACH | 1 | $8,500.00 | $10,710 | $6,046.72 |
| 0040 | Removal of old bridge, station 73+16.08 (206A000) | LS | 1 | $150,000 | $142,165 | $139,075 |
| 0050 | Removing concrete slope paving (206C002) | SY | 136 | $28.17 | $36.15 | $11.29 |
| 0060 | Removing concrete median (206C008) | SY | 169 | $28.17 | $113.44 | $9.08 |
| 0070 | Removing pipe (206D000) | LF | 541 | $28.17 | $23.23 | $34.60 |
| 0080 | Removing guardrail (206D001) | LF | 538 | $4.51 | $8.89 | $4.84 |
| 0090 | Removing curb (206D002) | LF | 2,237 | $16.90 | $13.52 | $5.49 |
| 0100 | Removing curb and gutter (206D003) | LF | 1,198 | $16.90 | $17.72 | $6.58 |
| 0110 | Removing new jersey barrier rail (206D009) | LF | 2,528 | $25.32 | $53.55 | $44.49 |
| 0120 | Removing headwalls (206E000) | EACH | 2 | $845.07 | $522.83 | $589.95 |
| 0130 | Removing inlets (206E001) | EACH | 7 | $1,070.42 | $1,617.36 | $614.13 |
| 0140 | Removing junction boxes (206E002) | EACH | 1 | $1,070.42 | $1,817.01 | $614.13 |
| 0150 | Removing guardrail end anchor (all type) (206E008) | EACH | 8 | $400.00 | $273.11 | $362.80 |
| 0160 | Removing inlets (partial) (206E042) | EACH | 1 | $1,690.14 | $2,503.92 | $1,688.84 |
| 0170 | Removing slope paved headwall (206E050) | EACH | 1 | $619.72 | $1,045.65 | $589.94 |
| 0180 | Unclassified excavation (210A000) | CY | 6,678 | $31.55 | $37.86 | $25.76 |
| 0190 | Borrow excavation (210D000) | CY | 21,149 | $23.66 | $21.65 | $26.32 |
| 0200 | Structure excavation (214A000) | CY | 2,603 | $10.14 | $16.30 | $11.09 |
| 0210 | Foundation backfill, commercial (214B001) | CY | 354 | $67.61 | $71.67 | $43.76 |
| 0220 | Roadbed processing (230A000) | RBST | 21 | $845.07 | $1,412.03 | $1,160.12 |
| 0230 | Crushed aggregate base course, type B, plant mixed, 6" compacted thickness (301A012) | SY | 10,398 | $13.52 | $18.82 | $12.56 |
| 0240 | Plant mix bituminous base, mix 2 (327A021) | TON | 92 | $152.11 | $137.64 | $169.60 |
| 0250 | Bituminous treatment A (401A000) | SY | 10,398 | $1.69 | $1.55 | $1.07 |
| 0260 | Tack coat (405A000) | GAL | 3,873 | $5.63 | $4.87 | $3.39 |
| 0270 | Micro-milling existing pavement (approximately 1.10" thru 2.00" thick) (408B001) | SY | 25,015 | $4.51 | $3.27 | $1.63 |
| 0280 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D (424A360) | TON | 2,520 | $127.32 | $115.26 | $100.84 |
| 0290 | Superpave bituminous concrete upper binder layer, 3/4" maximum aggregate size mix, esal range C/D (424B650) | TON | 1,180 | $125.07 | $112.12 | $112.14 |
| 0300 | Superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range C/D (424B655) | TON | 100 | $185.92 | $169.30 | $162.63 |
| 0310 | Superpave bituminous concrete upper binder layer, leveling, 1/2" maximum aggregate size mix, esal range C/D (424B657) | TON | 50 | $166.76 | $151.24 | $161.71 |
| 0320 | Superpave bituminous concrete upper binder layer, leveling, 3/4" maximum aggregate size mix, esal range C/D (424B658) | TON | 50 | $163.38 | $147.09 | $159.53 |
| 0330 | Superpave bituminous concrete upper binder layer, leveling, 1" maximum aggregate size mix, esal range C/D (424B659) | TON | 50 | $154.37 | $140.22 | $155.41 |
| 0340 | Superpave bituminous concrete lower binder layer, 1" maximum aggregate size mix, esal range C/D (424B681) | TON | 2,466 | $105.92 | $95.87 | $96.09 |
| 0350 | Aggregate surfacing (aldot #410 modified) (430B014) | TON | 100 | $39.44 | $61.07 | $39.39 |
| 0360 | Aggregate surfacing (aldot #2) (430B046) | TON | 526 | $43.83 | $50.57 | $43.72 |
| 0370 | Reinforced cement concrete bridge end slab (450B000) | SY | 372 | $200.00 | $208.85 | $235.82 |
| 0380 | Steel reinforcement (502A000) | LB | 15,400 | $1.50 | $1.45 | $1.63 |
| 0390 | Steel reinforcement for bridge superstructure, station 73+05.81, approximately 68,800 pounds (502B000) | LS | 1 | $103,887 | $98,532 | $111,260 |
| 0400 | Pile points (type A, 12") (505G003) | EACH | 48 | $225.00 | $240.98 | $272.10 |
| 0410 | Temporary steel sheet piling (505I000) | SF | 16,621 | $23.00 | $24.63 | $27.81 |
| 0420 | Steel piling furnished and driven (HP 12X53) (505M002) | LF | 1,780 | $70.00 | $74.97 | $84.65 |
| 0430 | Structural steel (508A000) | LB | 7,190 | $4.75 | $5.09 | $5.74 |
| 0440 | Bridge substructure concrete (510A007) | CY | 108 | $1,013.00 | $1,044.23 | $1,179.11 |
| 0450 | Bridge concrete superstructure, station 73+05.81, approximately 271 cubic yards (510C051) | LS | 1 | $285,991 | $267,750 | $302,336 |
| 0460 | Grooving concrete bridge decks (510E000) | SY | 951 | $9.25 | $9.64 | $10.88 |
| 0470 | Bridge barrier rail, type 36” single slope (510J000) | LF | 276 | $175.00 | $187.43 | $211.64 |
| 0480 | Bridge barrier rail, type 42" CSF median (510J002) | LF | 187 | $195.00 | $208.85 | $235.82 |
| 0490 | Elastomeric bearing type 4 (mark VB5) (511A074) | EACH | 22 | $1,500.00 | $1,606.50 | $1,814.02 |
| 0500 | Pretensioned-prestressed concrete girders, type BT-56 modified (speciality item) (513B036) | LF | 1,509 | $505.00 | $540.86 | $610.72 |
| 0510 | 18" roadway pipe (class 3 R.C.) (530A001) | LF | 1,157 | $95.77 | $105.52 | $113.48 |
| 0520 | 24" roadway pipe (class 3 R.C.) (530A002) | LF | 560 | $140.85 | $124.96 | $154.24 |
| 0530 | 36" roadway pipe (class 3 R.C.) (530A004) | LF | 11 | $366.20 | $224.78 | $259.53 |
| 0540 | 48" roadway pipe (class 3 R.C.) (530A006) | LF | 504 | $298.59 | $383.48 | $519.37 |
| 0550 | 15" roadway pipe (14 gauge C.C.S.) (stack pipe)(no bedding required) (530A800) | LF | 5 | $1,408.45 | $829.85 | $397.12 |
| 0560 | 24" roadway pipe, jacked installation (smooth steel) (530C002) | LF | 33 | $905.90 | $675.44 | $1,047.22 |
| 0570 | Mobilization (600A000) | LS | 1 | $469,813 | $902,515 | $948,346 |
| 0580 | Right of way markers (602A000) | EACH | 4 | $1,690.15 | $1,724.01 | $591.44 |
| 0590 | Loose riprap, class 2 (610C001) | TON | 3,785 | $44.94 | $54.00 | $50.95 |
| 0600 | Filter blanket, geotextile (610D003) | SY | 3,009 | $2.15 | $3.93 | $4.05 |
| 0610 | Slope paving (614A000) | CY | 69 | $676.06 | $964.70 | $856.69 |
| 0620 | 24" roadway pipe end treatment, class 1 (619A003) | EACH | 4 | $1,577.47 | $1,274.01 | $1,730.69 |
| 0630 | 36" roadway pipe end treatment, class 1 (619A005) | EACH | 1 | $1,802.82 | $2,044.85 | $2,453.94 |
| 0640 | 48" roadway pipe end treatment, class 1 (619A007) | EACH | 1 | $2,140.85 | $4,396.72 | $4,230.60 |
| 0650 | Junction boxes, type 4 (621A004) | EACH | 1 | $7,887.34 | $6,257.31 | $6,409.98 |
| 0660 | Junction boxes, type 1 (621A005) | EACH | 3 | $8,450.72 | $5,538.18 | $5,374.64 |
| 0670 | Junction box units, type 4 (621B004) | EACH | 1 | $1,577.47 | $577.71 | $1,047.33 |
| 0680 | Junction box units, type 1 (621B005) | EACH | 3 | $1,577.47 | $476.96 | $1,107.80 |
| 0690 | Inlets, type E (621C008) | EACH | 1 | $13,521 | $9,920.59 | $8,722.27 |
| 0700 | Inlets, type S1 or S3 (1 wing) (621C015) | EACH | 29 | $5,633.81 | $4,631.98 | $5,276.68 |
| 0710 | Inlets, type S2 or S4 (1 wing) (621C016) | EACH | 7 | $11,549 | $7,486.23 | $5,627.39 |
| 0720 | Inlets, type S1 or S3 (2 wing) (621C017) | EACH | 3 | $5,859.17 | $5,212.78 | $5,429.87 |
| 0730 | Inlets, type C (621C027) | EACH | 1 | $7,887.34 | $6,430.00 | $5,820.89 |
| 0740 | Inlets, type S special (1 wing) (621C046) | EACH | 1 | $11,549 | $8,951.61 | $6,171.60 |
| 0750 | Inlets, type S (modified) (1 wing) (621C065) | EACH | 1 | $11,831 | $9,352.16 | $6,631.15 |
| 0760 | Inlets, type E3 (621C069) | EACH | 2 | $13,803 | $13,666 | $8,693.08 |
| 0770 | Inlet units, type E (621D008) | EACH | 2 | $1,859.16 | $1,000.71 | $878.03 |
| 0780 | Inlet units, type S1 or S3 (621D015) | EACH | 42 | $1,577.47 | $697.19 | $817.56 |
| 0790 | Inlet units, type S2 or S4 (621D016) | EACH | 20 | $3,154.94 | $1,172.26 | $992.91 |
| 0800 | Inlet units, type E3 (621D046) | EACH | 3 | $1,802.82 | $1,219.84 | $1,031.20 |
| 0810 | Concrete curb, type N (623B000) | LF | 655 | $36.06 | $32.28 | $30.34 |
| 0820 | Concrete curb, type A (623B002) | LF | 111 | $39.44 | $36.63 | $69.28 |
| 0830 | Combination curb & gutter, type C (623C000) | LF | 2,222 | $34.93 | $33.48 | $35.27 |
| 0840 | Concrete median or safety barrier, type CSF-42 (629A095) | LF | 2,525 | $148.92 | $125.84 | $143.17 |
| 0850 | Steel beam guardrail, class A, type 2 (630A001) | LF | 1,150 | $24.79 | $29.99 | $26.61 |
| 0860 | Guardrail end anchor, type 8 (MASH) (630C077) | EACH | 2 | $1,690.15 | $1,445.85 | $1,814.02 |
| 0870 | Guardrail end anchor, type 13 (MASH) (630C079) | EACH | 4 | $3,943.67 | $2,382.98 | $4,232.71 |
| 0880 | Guardrail end anchor, type 20 series (MASH) (630C080) | EACH | 2 | $4,056.35 | $3,671.39 | $4,353.64 |
| 0890 | Abandon existing manhole (645N500) | EACH | 4 | $1,352.12 | $5,805.66 | $2,632.78 |
| 0900 | Topsoil (650A000) | CY | 328 | $39.44 | $48.00 | $60.85 |
| 0910 | Solid sodding (bermuda) (654A001) | SY | 778 | $10.64 | $10.00 | $8.07 |
| 0920 | Solid sodding (myers zoysia) (654A006) | SY | 1,470 | $12.93 | $13.80 | $11.84 |
| 0930 | Erosion control product, type S3 (659C001) | SY | 4,143 | $1.87 | $2.15 | $2.77 |
| 0940 | Temporary seeding (665A000) | ACRE | 5 | $1,868.36 | $734.66 | $1,004.23 |
| 0950 | Temporary mulching (665B001) | TON | 30 | $1,667.15 | $613.40 | $167.37 |
| 0960 | Temporary pipe (665C010) | LF | 30 | $123.94 | $59.22 | $102.60 |
| 0970 | Temporary pipe end treatment (665D001) | EACH | 2 | $1,352.12 | $552.73 | $1,730.67 |
| 0980 | Polyethylene (665E000) | SY | 500 | $4.13 | $3.51 | $1.66 |
| 0990 | Hay bales (665F000) | EACH | 500 | $9.49 | $16.00 | $16.24 |
| 1000 | Sand bags (665G000) | EACH | 500 | $9.20 | $15.00 | $7.98 |
| 1010 | Temporary riprap, class 2 (665I000) | TON | 500 | $45.07 | $53.23 | $50.95 |
| 1020 | Silt fence (665J002) | LF | 2,420 | $2.98 | $4.75 | $5.93 |
| 1030 | Temporary coarse aggregate,aldot number 1 (665N000) | TON | 200 | $38.31 | $65.30 | $41.80 |
| 1040 | Temporary coarse aggregate,aldot number 4 (665N001) | TON | 35 | $38.31 | $71.80 | $46.30 |
| 1050 | Silt fence removal (665O001) | LF | 2,420 | $1.21 | $1.25 | $2.74 |
| 1060 | Inlet protection, stage 3 or 4 (665P005) | EACH | 44 | $190.86 | $553.16 | $293.69 |
| 1070 | Wattle (665Q002) | LF | 625 | $12.70 | $10.05 | $7.71 |
| 1080 | Pest control treatment (666A001) | ACRE | 5 | $11.50 | $100.00 | $466.44 |
| 1090 | Construction safety fence (674A000) | LF | 330 | $8.16 | $6.00 | $4.61 |
| 1100 | Geometric controls (680A001) | LS | 1 | $91,461 | $163,335 | $220,377 |
| 1110 | Construction fuel (maximum bid limited to $ 543,754.00) (698A000) | LS | 1 | $0.00 | $0.00 | $0.00 |
| 1120 | Solid white, class 2, type A traffic stripe (5" wide) (701A227) | MI | 2 | $4,563.39 | $4,337.55 | $4,897.85 |
| 1130 | Solid yellow, class 2, type A traffic stripe (5" wide) (701A230) | MI | 2 | $4,563.39 | $4,337.55 | $4,897.85 |
| 1140 | Broken white, class 2, type A traffic stripe (5" wide) (701A239) | MI | 2 | $2,535.22 | $2,409.75 | $2,721.03 |
| 1150 | Dotted, class 2, type A traffic stripe (5" wide) (701B207) | LF | 720 | $1.69 | $1.61 | $1.81 |
| 1160 | Broken temporary traffic stripe (701C000) | MI | 1 | $1,183.10 | $1,124.55 | $1,269.81 |
| 1170 | Solid temporary traffic stripe (701C001) | MI | 4 | $1,183.10 | $1,124.55 | $1,269.81 |
| 1180 | Solid traffic stripe removed (701D005) | MI | 1 | $2,816.91 | $2,677.50 | $3,023.36 |
| 1190 | Broken traffic stripe removed (701D013) | MI | 1 | $2,816.91 | $2,677.50 | $3,023.36 |
| 1200 | Broken white, class W, type A traffic stripe (5" wide) (701G142) | LF | 280 | $3.38 | $3.21 | $3.63 |
| 1210 | Solid white, class W, type A traffic stripe (5"wide) (701G146) | LF | 280 | $5.63 | $5.36 | $6.05 |
| 1220 | Solid yellow, class W, type A traffic stripe (5" wide) (701G154) | LF | 280 | $5.63 | $5.36 | $6.05 |
| 1230 | Traffic control markings, class 2, type A (703A002) | SF | 2,009 | $5.63 | $5.36 | $6.05 |
| 1240 | Traffic control legends, class 2, type A (703B002) | SF | 113 | $6.20 | $5.89 | $6.65 |
| 1250 | Removal of existing traffic control markings or legends (paint) (703C000) | SF | 701 | $3.38 | $3.21 | $3.63 |
| 1260 | Temporary traffic control markings (703D001) | SF | 627 | $2.25 | $2.14 | $2.42 |
| 1270 | Pavement markers, class C, type 1- A (705A011) | EACH | 51 | $11.27 | $10.71 | $12.09 |
| 1280 | Pavement markers, class C, type 1- B (705A012) | EACH | 341 | $11.27 | $10.71 | $12.09 |
| 1290 | Pavement markers, class C, type 2- C (705A022) | EACH | 18 | $11.27 | $10.71 | $12.09 |
| 1300 | Pavement markers, class C, type 2- D (705A023) | EACH | 29 | $11.27 | $10.71 | $12.09 |
| 1310 | Pavement markers, class C, type 2- E (705A024) | EACH | 34 | $11.27 | $10.71 | $12.09 |
| 1320 | Pavement markers, class A-H, type 2-C (705A030) | EACH | 68 | $11.27 | $10.71 | $12.09 |
| 1330 | Pavement markers, class A-H, type 1-B (705A032) | EACH | 34 | $11.27 | $10.71 | $12.09 |
| 1340 | Pavement markers, class A-H, type 2-D (705A037) | EACH | 10 | $11.27 | $10.71 | $12.09 |
| 1350 | Pavement markers, class A-H, type 2-E (705A038) | EACH | 155 | $11.27 | $10.71 | $12.09 |
| 1360 | Type A object marker installation (707B013) | EACH | 1 | $845.07 | $230.27 | $907.01 |
| 1370 | Milepost, type A (709A000) | EACH | 3 | $563.38 | $187.43 | $604.67 |
| 1380 | Class 10 aluminum flat sign panels (type XI background) (710A163) | SF | 130 | $28.17 | $25.70 | $30.23 |
| 1390 | Class 4, aluminum flat sign panels (type IV background) (710A171) | SF | 63 | $22.54 | $21.42 | $24.19 |
| 1400 | Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel) (710B021) | LF | 280 | $18.03 | $20.35 | $19.35 |
| 1410 | Vehicular impact attenuator assembly (MASH) (BI-directional,TL- 2) (720A072) | EACH | 1 | $25,762 | $22,491 | $29,629 |
| 1420 | Portable concrete safety barriers, type 6 (726A000) | LF | 1,576 | $45.00 | $75.00 | $63.16 |
| 1430 | Portable concrete safety barriers, type 6-A (726A001) | LF | 40 | $45.00 | $115.00 | $83.15 |
| 1440 | Portable impact attenuator assembly (BI-directional,TL-2) (726D021) | EACH | 4 | $15,000 | $14,200 | $15,285 |
| 1450 | Construction signs (740B000) | SF | 1,398 | $5.92 | $6.96 | $6.35 |
| 1460 | Channelizing drums (740D000) | EACH | 250 | $56.34 | $27.85 | $60.47 |
| 1470 | Cones (36 inches high) (740E000) | EACH | 50 | $28.17 | $22.49 | $6.05 |
| 1480 | Barricades, type III (740F002) | EACH | 45 | $281.69 | $230.27 | $302.34 |
| 1490 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 1 | $2,140.85 | $3,373.65 | $2,297.75 |
| 1500 | Portable changeable message sign, type 2 (742A001) | EACH | 6 | $6,379.04 | $8,514.45 | $8,223.54 |
| 1510 | Roadway luminaire assembly with one, LED, 250 watt equivalent luminaire (750B601) | EACH | 10 | $10,704 | $9,639.00 | $10,340 |
| 1520 | Pole foundation,roadway (750C010) | EACH | 10 | $3,661.98 | $3,213.00 | $3,446.63 |
| 1530 | Electrical junction box,type 1 (750D200) | EACH | 8 | $563.38 | $535.50 | $574.44 |
| 1540 | Conduit,2 inch,rigid nonmetallic (750E115) | LF | 50 | $22.54 | $16.07 | $17.23 |
| 1550 | Conductor, #6 AWG (750F024) | LF | 50 | $11.27 | $8.57 | $9.19 |
| 1560 | Conductor, #2 AWG (750F026) | LF | 100 | $13.52 | $10.71 | $11.49 |
| 1570 | Combined duct and cable,2 #6 AWG/ 1 #6 AWG GND (750G010) | LF | 2,525 | $11.27 | $8.57 | $9.19 |
| 1580 | Service pole (750H005) | EACH | 1 | $3,380.29 | $3,213.00 | $3,446.64 |
| 1590 | Lighting control center (750I015) | EACH | 1 | $38,310 | $36,414 | $39,062 |
| 1600 | 6" electrical conduit, 1 line, type 5 installation (756A028) | LF | 325 | $56.34 | $53.55 | $57.44 |
| 1605 | Trainee hours at 80 cents per hour (999 000) | HR | 1,240 | $0.80 | $0.80 | $0.80 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of December 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.