ALDOT contract 20250530034 bid tabulation
INTERSECTION IMPROVEMENTS ON VAUGHN BRIDGE ROAD AT SR-3 (US-31) IN HARTSELLE. Let by Alabama DOT on May 30, 2025, Morgan, 0204. 5 bids received; low bid $1,234,568 by Rogers Group, Inc..
- Owner
- Alabama DOT
- Letting
- 30 MAY 2025
- Pay items
- 109
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rogers Group, Inc. | $1,234,568 | Low |
| 2 | Grayson Carter & Son Contracting, Inc. | $1,394,694 | +13% |
| 3 | Wiregrass Construction Company, Inc. | $1,421,778 | +15% |
| 4 | Gillespie Construction, LLC | $1,897,753 | +54% |
| 5 | Carcel & G. Construction, LLC | $2,115,814 | +71% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rogers Group, Inc. | 2. Grayson Carter & Son Contracting, Inc. | 3. Wiregrass Construction Company, Inc. | 4. Gillespie Construction, LLC | 5. Carcel & G. Construction, LLC |
|---|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (maximum allowable bid $ 8,000.00 per acre) (approximately 1 acre) (201A002) | LS | 1 | $500.00 | $8,000.00 | $3,722.18 | $8,000.00 | $7,477.10 |
| 0020 | Removing concrete sidewalk (206C000) | SY | 5 | $115.00 | $115.71 | $40.00 | $100.00 | $84.12 |
| 0030 | Removing concrete driveway (206C010) | SY | 263 | $18.00 | $22.00 | $25.00 | $30.00 | $14.94 |
| 0040 | Removing riprap (206C023) | SY | 55 | $12.00 | $26.25 | $16.00 | $25.00 | $50.04 |
| 0050 | Removing pipe (206D000) | LF | 238 | $29.00 | $49.74 | $11.00 | $50.00 | $36.82 |
| 0060 | Removing curb and gutter (206D003) | LF | 571 | $12.35 | $13.12 | $6.00 | $20.00 | $20.63 |
| 0070 | Removing gutter (206D005) | LF | 217 | $13.00 | $16.63 | $10.00 | $20.00 | $18.11 |
| 0080 | Removing headwalls (206E000) | EACH | 16 | $330.00 | $453.77 | $220.00 | $700.00 | $643.48 |
| 0090 | Removing inlets (206E001) | EACH | 1 | $650.00 | $578.53 | $900.00 | $850.00 | $4,380.17 |
| 0100 | Removing inlets (partial) (206E042) | EACH | 2 | $1,225.00 | $1,531.45 | $2,000.00 | $750.00 | $3,450.57 |
| 0110 | Unclassified excavation (210A000) | CY | 1,675 | $20.50 | $24.31 | $38.00 | $25.00 | $36.78 |
| 0120 | Borrow excavation (loose truckbed measurement) (210D001) | CY | 2,149 | $40.00 | $26.45 | $38.00 | $45.00 | $48.44 |
| 0130 | Structure excavation (214A000) | CY | 311 | $12.00 | $27.67 | $0.11 | $50.00 | $22.53 |
| 0140 | Foundation backfill, commercial (214B001) | CY | 147 | $40.00 | $30.51 | $38.00 | $85.00 | $73.03 |
| 0150 | Crushed aggregate base course, type B, plant mixed, 4" compacted thickness (301A004) | SY | 331 | $17.00 | $16.42 | $30.00 | $18.00 | $20.98 |
| 0160 | Coarse aggregate, section 801, for miscellaneous use (305B071) | TON | 245 | $46.00 | $58.37 | $35.00 | $60.00 | $53.15 |
| 0170 | Crushed aggregate, section 825, type B, for miscellaneous use (305B078) | TON | 178 | $41.00 | $45.77 | $45.00 | $60.00 | $50.30 |
| 0180 | Tack coat (405A000) | GAL | 1,087 | $3.00 | $4.56 | $3.70 | $15.00 | $4.41 |
| 0190 | Micro-milling existing pavement (approximately 1.10" thru 2.00" thick) (408B001) | SY | 3,030 | $3.00 | $3.75 | $7.00 | $8.00 | $7.71 |
| 0200 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D (424A360) | TON | 340 | $120.00 | $177.49 | $210.00 | $250.00 | $247.86 |
| 0210 | Superpave bituminous concrete upper binder layer, 3/4" maximum aggregate size mix, esal range C/D (424B650) | TON | 83 | $182.00 | $256.90 | $340.00 | $500.00 | $495.72 |
| 0220 | Superpave bituminous concrete upper binder layer, 1" maximum aggregate size mix, esal range C/D (424B651) | TON | 105 | $154.00 | $217.60 | $200.00 | $300.00 | $264.38 |
| 0230 | Superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range C/D (424B655) | TON | 407 | $150.00 | $194.42 | $280.00 | $350.00 | $347.00 |
| 0240 | Superpave bituminous concrete lower binder layer, 1" maximum aggregate size mix, esal range C/D (424B681) | TON | 240 | $143.00 | $144.18 | $230.00 | $310.00 | $308.45 |
| 0250 | Superpave bituminous concrete base layer, 1" maximum aggregate size mix, esal range C/D (424C360) | TON | 316 | $124.00 | $130.45 | $195.00 | $250.00 | $253.37 |
| 0260 | 18" roadway pipe (class 3 R.C.) (530A001) | LF | 6 | $182.00 | $369.36 | $250.00 | $300.00 | $225.06 |
| 0270 | 44" span, 27" rise roadway pipe (class 3 R.C.) (530B004) | LF | 11 | $310.00 | $388.89 | $320.00 | $340.00 | $289.64 |
| 0280 | 18" storm sewer pipe (class 3 R.C.) (533A098) | LF | 328 | $75.00 | $113.22 | $80.00 | $225.00 | $170.03 |
| 0290 | 22" span, 14" rise storm sewer pipe (class 3 R.C.) (533B098) | LF | 226 | $100.00 | $123.35 | $100.00 | $250.00 | $183.09 |
| 0300 | 29" span, 18" rise storm sewer pipe (class 3 R.C.) (533B099) | LF | 56 | $117.00 | $149.70 | $105.00 | $275.00 | $186.77 |
| 0310 | 44" span, 27" rise storm sewer pipe (class 3 R.C.) (533B101) | LF | 50 | $196.00 | $243.61 | $165.00 | $325.00 | $284.69 |
| 0320 | Mobilization (600A000) | LS | 1 | $145,474 | $149,533 | $160,704 | $185,000 | $481,330 |
| 0330 | Loose riprap, class 1 (610C000) | TON | 2 | $200.00 | $443.11 | $200.00 | $500.00 | $84.00 |
| 0340 | Filter blanket, geotextile (610D003) | SY | 124 | $9.00 | $10.44 | $6.00 | $5.00 | $11.75 |
| 0350 | Slope paving (614A000) | CY | 70 | $450.00 | $746.06 | $565.00 | $900.00 | $1,438.99 |
| 0360 | Concrete driveway, 6" thick (includes wire mesh) (618B003) | SY | 265 | $90.00 | $99.48 | $95.00 | $130.00 | $183.57 |
| 0370 | 18" side drain pipe end treatment, class 1 (619A101) | EACH | 2 | $1,715.00 | $1,989.48 | $1,900.00 | $2,000.00 | $2,176.11 |
| 0380 | 22" span, 14" rise side drain pipe end treatment, class 1 (619B116) | EACH | 1 | $1,700.00 | $1,989.48 | $1,900.00 | $2,000.00 | $2,412.16 |
| 0390 | 29" span, 18" rise side drain pipe end treatment, class 1 (619B117) | EACH | 1 | $1,700.00 | $2,652.64 | $1,900.00 | $2,200.00 | $3,088.42 |
| 0400 | Junction boxes, type 1 or 1P (621A011) | EACH | 1 | $4,850.00 | $7,251.00 | $2,800.00 | $8,500.00 | $5,437.89 |
| 0410 | Junction boxes, type 1 or 2P (621A019) | EACH | 2 | $4,850.00 | $7,251.01 | $3,400.00 | $8,500.00 | $7,011.92 |
| 0420 | Junction boxes, type partial (621A057) | EACH | 2 | $3,000.00 | $3,935.22 | $6,100.00 | $7,000.00 | $3,101.34 |
| 0430 | Junction box units, type 1 or 2P (621B014) | EACH | 2 | $4,850.00 | $1,326.32 | $1,600.00 | $1,500.00 | $973.67 |
| 0440 | Inlets, type E (621C008) | EACH | 1 | $6,200.00 | $12,937 | $7,997.00 | $12,000 | $7,437.15 |
| 0450 | Inlets, type S1 or S3 (1 wing) (modified) (621C036) | EACH | 1 | $6,400.00 | $6,872.83 | $6,500.00 | $8,000.00 | $4,648.60 |
| 0460 | Inlets, type S3 (1 wing) (modified) (621C071) | EACH | 2 | $6,700.00 | $6,872.83 | $6,500.00 | $8,000.00 | $5,491.57 |
| 0470 | Inlets, type PD-6 (621C110) | EACH | 1 | $6,500.00 | $13,901 | $8,500.00 | $17,000 | $8,668.95 |
| 0480 | Concrete gutter (valley) (623A001) | LF | 52 | $45.00 | $110.52 | $95.00 | $50.00 | $88.13 |
| 0490 | Concrete curb, type N (623B000) | LF | 74 | $29.00 | $27.64 | $100.00 | $70.00 | $44.06 |
| 0500 | Combination curb & gutter, type C (modified) (623C003) | LF | 1,320 | $27.00 | $22.10 | $33.00 | $45.00 | $44.06 |
| 0510 | 3/4 inch pex water service line laid (641A412) | LF | 100 | $35.50 | $101.47 | $10.70 | $25.00 | $11.02 |
| 0520 | 2 inch P.E. water service line laid (641A538) | LF | 130 | $41.00 | $93.78 | $13.91 | $32.00 | $22.03 |
| 0530 | 8 inch ductile iron water main laid (641A614) | LF | 620 | $90.00 | $114.64 | $73.83 | $110.00 | $76.01 |
| 0540 | 6 inch P.V.C. water main laid (641A746) | LF | 180 | $48.00 | $84.79 | $27.82 | $50.00 | $28.64 |
| 0550 | Ductile iron fittings (641C500) | LB | 1,200 | $4.50 | $11.35 | $21.40 | $16.00 | $22.03 |
| 0560 | 8 inch gate valve with box (641J518) | EACH | 1 | $3,600.00 | $2,927.15 | $3,254.88 | $2,650.00 | $3,351.07 |
| 0570 | Concrete for water mains (thrust blocks) (641L500) | CY | 19 | $450.00 | $362.04 | $1,390.97 | $200.00 | $1,432.08 |
| 0580 | 6 inch X 6 inch tapping valve and sleeve (641O514) | EACH | 1 | $6,000.00 | $5,855.18 | $5,249.32 | $6,400.00 | $5,404.45 |
| 0590 | 8 inch X 6 inch tapping valve and sleeve (641O518) | EACH | 1 | $6,000.00 | $5,906.69 | $5,294.26 | $7,500.00 | $5,450.72 |
| 0600 | 8 inch X 8 inch tapping valve and sleeve (641O520) | EACH | 2 | $8,000.00 | $7,001.67 | $4,016.70 | $8,000.00 | $4,135.41 |
| 0610 | 12 inch X 6 inch tapping valve and sleeve (641O548) | EACH | 1 | $4,150.00 | $6,082.50 | $5,555.33 | $11,000 | $5,719.51 |
| 0620 | 3/4 inch service tap (641P515) | EACH | 2 | $800.00 | $1,435.68 | $650.55 | $1,750.00 | $1,339.55 |
| 0630 | 2 inch service tap (641P530) | EACH | 2 | $1,850.00 | $2,274.11 | $2,015.84 | $2,700.00 | $4,150.83 |
| 0640 | Manhole frame and cover reset (645K500) | EACH | 2 | $3,000.00 | $2,339.30 | $973.68 | $1,000.00 | $1,002.46 |
| 0650 | Topsoil (650A000) | CY | 260 | $53.00 | $69.99 | $55.00 | $45.00 | $75.78 |
| 0660 | Solid sodding (bermuda) (654A001) | SY | 2,355 | $10.00 | $11.76 | $8.00 | $12.00 | $9.86 |
| 0670 | Erosion control product, type C6 (659C006) | SY | 554 | $6.00 | $7.23 | $6.50 | $6.00 | $8.93 |
| 0680 | Temporary seeding (665A000) | ACRE | 1 | $1,500.00 | $2,601.58 | $1,100.00 | $450.00 | $413.10 |
| 0690 | Temporary mulching (665B001) | TON | 9 | $175.00 | $448.45 | $250.00 | $600.00 | $550.80 |
| 0700 | Polyethylene (665E000) | SY | 500 | $2.00 | $8.53 | $5.00 | $3.76 | $3.61 |
| 0710 | Sand bags (665G000) | EACH | 50 | $7.00 | $46.49 | $10.00 | $5.50 | $5.30 |
| 0720 | Temporary riprap, class 2 (665I000) | TON | 20 | $52.00 | $97.59 | $60.00 | $100.00 | $87.28 |
| 0730 | Inlet protection, stage 3 or 4 (665P005) | EACH | 9 | $525.00 | $709.62 | $775.73 | $300.00 | $82.62 |
| 0740 | Wattle (665Q002) | LF | 182 | $6.50 | $15.70 | $10.70 | $12.00 | $9.91 |
| 0750 | Geometric controls (680A001) | LS | 1 | $60,000 | $13,155 | $25,929 | $70,000 | $50,638 |
| 0760 | Construction fuel (maximum bid limited to $ 64,410.00) (698A000) | LS | 1 | $0.00 | $0.01 | $0.00 | $0.00 | $0.00 |
| 0770 | Solid white, class 2, type A traffic stripe (5" wide) (701A227) | MI | 1 | $6,175.00 | $6,825.00 | $4,814.91 | $5,175.00 | $4,957.20 |
| 0780 | Solid yellow, class 2, type A traffic stripe (5" wide) (701A230) | MI | 1 | $6,175.00 | $6,825.00 | $4,814.91 | $5,175.00 | $4,957.20 |
| 0790 | Dotted, class 2, type A traffic stripe (5" wide) (701B207) | LF | 709 | $2.85 | $3.15 | $2.14 | $3.00 | $2.20 |
| 0800 | Solid temporary traffic stripe (701C001) | MI | 2 | $1,567.50 | $1,732.50 | $1,604.97 | $1,725.00 | $1,652.40 |
| 0810 | Solid traffic stripe removed (paint) (701H000) | LF | 1,154 | $1.90 | $2.10 | $1.07 | $2.00 | $1.10 |
| 0820 | Traffic control markings, class 2, type A (703A002) | SF | 2,283 | $7.60 | $8.40 | $5.88 | $6.50 | $6.06 |
| 0830 | Traffic control legends, class 2, type A (703B002) | SF | 180 | $7.60 | $8.40 | $6.42 | $7.00 | $6.61 |
| 0840 | Temporary traffic control markings (703D001) | SF | 2,494 | $3.80 | $4.20 | $2.14 | $3.00 | $2.20 |
| 0850 | Pavement markers, class C, type 2- D (705A023) | EACH | 78 | $7.60 | $8.40 | $10.70 | $12.00 | $11.02 |
| 0860 | Pavement markers, class A-H, type 2-C (705A030) | EACH | 52 | $7.60 | $8.40 | $10.70 | $12.00 | $11.02 |
| 0870 | Pavement markers, class A-H, type 1-B (705A032) | EACH | 112 | $7.60 | $8.40 | $10.70 | $12.00 | $11.02 |
| 0880 | Pavement markers, class A-H, type 2-D (705A037) | EACH | 10 | $7.60 | $8.40 | $10.70 | $12.00 | $11.02 |
| 0890 | Pavement markers, class A-H, type 2-E (705A038) | EACH | 57 | $7.60 | $8.40 | $10.70 | $12.00 | $11.02 |
| 0900 | Class 10 aluminum flat sign panels (type XI background) (710A163) | SF | 14 | $26.50 | $30.95 | $28.35 | $35.00 | $30.85 |
| 0910 | Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel) (710B021) | LF | 28 | $18.50 | $21.00 | $19.79 | $35.00 | $20.93 |
| 0920 | Removal of existing traffic control unit ( vaughn bridge road at SR-3 (US-31)) (730A000) | LS | 1 | $5,000.00 | $5,250.00 | $5,349.90 | $5,175.00 | $5,508.00 |
| 0930 | Furnishing and installing traffic control unit ( vaughn bridge road at SR-3 (US-31)) (730C000) | LS | 1 | $10,000 | $10,500 | $10,700 | $11,500 | $11,016 |
| 0940 | Metal traffic signal pole foundation (730E000) | EACH | 2 | $5,000.00 | $5,250.00 | $5,349.90 | $5,750.00 | $5,508.00 |
| 0950 | Metal traffic signal strain pole (730G001) | EACH | 2 | $15,000 | $15,750 | $16,050 | $17,250 | $16,524 |
| 0960 | 1", metallic, conduit (730L002) | LF | 25 | $10.00 | $10.50 | $10.70 | $15.00 | $11.02 |
| 0970 | 1", non-metallic, conduit (730L003) | LF | 50 | $8.00 | $8.40 | $8.56 | $15.00 | $8.81 |
| 0980 | Luminaire extension assembly, 12' (730N000) | EACH | 2 | $2,000.00 | $2,100.00 | $2,139.96 | $2,300.00 | $2,203.20 |
| 0990 | Vehicular signal head, 12 inch, 3 (730P022) | EACH | 8 | $1,100.00 | $1,155.00 | $1,176.98 | $1,265.00 | $1,211.76 |
| 1000 | Vehicular signal head, 12 inch, 4 (730P023) | EACH | 4 | $1,400.00 | $1,470.00 | $1,497.97 | $1,610.00 | $1,542.24 |
| 1010 | Controller assembly, type NEMA, 16 channels (730R041) | EACH | 1 | $25,000 | $26,250 | $26,749 | $28,750 | $27,540 |
| 1020 | Electrical power service assembly with wood pole (730T010) | EACH | 1 | $3,000.00 | $3,150.00 | $3,209.94 | $3,500.00 | $3,304.80 |
| 1025 | Uninterruptable power supply system, managed (730T022) | EACH | 1 | $8,000.00 | $8,400.00 | $8,559.83 | $9,200.00 | $8,812.80 |
| 1030 | Video detection system ( vaughn bridge road at SR-3 (US-31)) (730U015) | LS | 1 | $27,000 | $28,350 | $28,889 | $31,050 | $29,743 |
| 1040 | Construction signs (740B000) | SF | 1,202 | $6.00 | $6.25 | $6.42 | $8.50 | $6.22 |
| 1050 | Channelizing drums (740D000) | EACH | 175 | $18.50 | $26.53 | $19.79 | $55.00 | $26.44 |
| 1060 | Cones (36 inches high) (740E000) | EACH | 100 | $25.00 | $24.32 | $10.16 | $40.00 | $24.24 |
| 1070 | Barricades, type III (740F002) | EACH | 4 | $95.00 | $232.11 | $101.65 | $300.00 | $231.34 |
| 1080 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 2 | $950.00 | $1,768.42 | $1,016.48 | $2,500.00 | $1,762.56 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of May 30, 2025. Compiled by Mirage Metrics.