ALDOT letting results, September 30, 2022
19 contracts let by Alabama DOT on September 30, 2022, $119,114,913 in low bids, a median of 2 bidders per contract.
- Owner
- Alabama DOT
- Contracts
- 19
- Low bids, total
- $119,114,913
- Data through
- 28 AUG 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 20220930057 | CONNECTOR ROAD (GRADE, DRAIN, PAVE, BRIDGE, LIGHTS) ON SR-161 FROM THE JUNCTION SR-180 TO A POINT NORTH OF THE JUNCTION OF CR-4 (COTTON CREEK DRIVE) IN GULF SHO | 0902 | 4 | Scott Bridge Company, Inc. | $51,855,705 | $53,797,104 | +4.0% | ALDOT |
| 20220930025 | BRIDGE REPLACEMENTS (GRADE, DRAIN, PAVE, AND BRIDGE) ON I-65 OVER THE SEPULGA RIVER AND RELIEF NORTHEAST OF EVERGREEN | 0903 | 2 | McInnis Construction, LLC | $40,870,428 | $47,150,931 | +15% | ALDOT |
| 20220930005 | INSTALLATION OF ITS INFRASTRUCTURE TO SURPORT ADVANCED CORRIDOR MANAGEMENT ON I-65/SR-3 (US-31) | 0301, 0305 | 2 | Inline, LLC | $3,650,859 | $3,715,556 | +2.0% | ALDOT |
| 20220930019 | ROUNDABOUT (GRADING, DRAINAGE, PAVEMENT, LIGHTING, & STRIPE) ON SR-167 AT SR-87 (MP 52.194 TO MP 54.207) SOUTH OF TROY | 0705 | 2 | S. A. Graham Company, Inc. | $3,435,415 | $3,474,953 | +1.0% | ALDOT |
| 20220930038 | STPSU-3521(254), STPSU-3521(255) RESURFACING AND TRAFFIC STRIPE ON VARIOUS ROUTES AT VARIOUS LOCATIONS AS INDICATED IN THE PLANS | 0701 | 2 | Midsouth Paving, Inc. | $2,603,042 | $2,708,502 | +4.0% | ALDOT |
| 20220930001 | BRIDGE DECK REPAIR (HYDROBLASTING AND DECK REHABILITATION) ON SR-12 (US-84) OVER THE CHATTAHOOCHEE RIVER (MP 231.490 TO MP 231.670) SOUTHWEST OF GORDON | 0701 | 5 | Gibson & Associates, Inc. | $2,498,613 | $2,753,507 | +10% | ALDOT |
| 20220930060 | RESURFACING (MICRO-SURFACING SEAL COAT) AND TRAFFIC STRIPE ON SR-110 FROM THE MONTGOMERY COUNTY LINE TO A POINT 0.400 MILE EAST OF THE JUNCTION OF CR-7 | 0602 | 1 | Whitaker Contracting Corporation | $1,799,776 | ALDOT | ||
| 20220930039 | RECONSTRUCTION (GRADING, PAVEMENT, AND TRAFFIC STRIPE) ON CR-684 (CHURCH STREET) FROM THE JUNCTION OF SOMERVILLE ROAD TO THE JUNCTION OF RIVERVIEW AVENUE IN DEC | 0204 | 2 | Rogers Group, Inc. | $1,782,543 | $2,111,012 | +18% | ALDOT |
| 20220930051 | ROADWAY IMPROVEMENTS (CONCRETE PAVING & TRAFFIC STRIPE) ON SR-14 AT THE QUARRY ENTRANCE AT APPROXIMATELY MP 210.29 NORTHEAST OF NOTASULGA | 0606 | 3 | Abramson, LLC | $1,566,021 | $1,683,329 | +7.0% | ALDOT |
| 20220930018 | INTERSECTION IMPROVEMENTS, ACCEL LANE, SIGNALS, AND STRIPE ON SR-1 (US-431) AT SR-79 NORTHEAST OF GUNTERSVILLE | 0104 | 2 | Wiregrass Construction Company, Inc. | $1,345,208 | $1,388,778 | +3.0% | ALDOT |
| 20220930031 | RESURFACING AND TRAFFIC STRIPE ON WADSEN ROAD FROM THE LOWNDES COUNTY LINE TO LAMAR ROAD AND ON LAMAR ROAD FROM WADSEN ROAD TO SR-8 (US-80) | 0603 | 3 | Midsouth Paving, Inc. | $1,212,974 | $1,320,251 | +9.0% | ALDOT |
| 20220930040 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON CR-84 (CHARLIE SHIRLEY ROAD) FROM THE JUNCTION OF SR-69 TO THE JUNCTION OF SR-13 (US-43) NORTHEAST OF NORTHPORT | 0502 | 2 | S. T. Bunn Construction Company, Inc. | $1,169,979 | $1,307,449 | +12% | ALDOT |
| 20220930011 | DOCK REPAIRS AT THE MOBILE FERRY DOCK (EAST DOCK) IN DAUPHIN ISLAND. | 0901 | 1 | McElhenney Construction Co., LLC | $1,138,133 | ALDOT | ||
| 20220930004 | UPGRADE ROADWAY LIGHTING LUMINAIRES ON SR-42 (US-98) IN THE BANKHEAD TUNNEL IN MOBILE | Mobile Area | 2 | Bill Smith Electric, Inc. | $1,126,937 | $1,274,439 | +13% | ALDOT |
| 20220930037 | RESURFACING AND TRAFFIC STRIPE ON COUNTRY CLUB DRIVE SOUTHWEST AND HENRY ROAD FROM THE JUNCTION OF FAIRWAY DRIVE TO THE JUNCTION OF SR-21 | 0402 | 3 | Vulcan Materials Asphalt and Construction, | $982,864 | $1,070,722 | +9.0% | ALDOT |
| 20220930034 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-17 FROM THE JUNCTION OF CR-9 TO THE JUNCTION OF CR-29 IN VERNON | 1001 | 1 | S. T. Bunn Construction Company, Inc. | $662,139 | ALDOT | ||
| 20220930054 | DEMOLITION AND STRUCTURE REMOVAL ON SR-52 FROM EAST OF COX STREET (MP 48.856) IN SLOCOMB TO EAST OF FIRECRACKER ROAD (MP 51.943) IN MALVERN | 0704 | 2 | Grady Ralls & Sons, Inc. | $499,804 | $583,613 | +17% | ALDOT |
| 20220930044 | INTERSECTION IMPROVEMENTS; TURN LANE INSTALL AND SIGNALS ON CR-248 (SUMMERVILLE ROAD) AT SR-1 (US-280) IN SMITHS STATION | 0606 | 1 | McElhenney Construction Co., LLC | $486,516 | ALDOT | ||
| 20220930014 | SAFETY IMPROVEMENTS (SAFETY WIDENING, RESURFACING, & STRIPE) ON CR-40 FROM THE JUNCTION OF CR-69 TO THE JUNCTION OF CR-21 NORTHWEST OF BOOTH | 0601 | 3 | Midsouth Paving, Inc. | $427,958 | $447,979 | +5.0% | ALDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ALDOT received, the others did not match their published totals and are left out.