ALDOT contract 20250829025 bid tabulation

MAINTENANCE BRIDGE PAINTING ON SR-53 (US-231) AT MP 315.314 IN HUNTSVILLE AND ON I-759 (MP 1.005) AT THE EASTSIDE DRIVE OVERPASS IN GADSDEN. Let by Alabama DOT on August 29, 2025, Etowah, Madison, 0102, 0105. 7 bids received; low bid $420,000 by Cekra, Inc.

Owner
Alabama DOT
Letting
29 AUG 2025
Pay items
9
Data through
28 AUG 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Cekra, Inc$420,000Low
2Omega Coatings & Construction, LLC$567,464+35%
3Gulf Coast Contracting, LLC$626,556+49%
4Olympus Painting Contractors, Inc.$869,590+107%
5International Rigging Group, LLC$876,797+109%
6Elite Industrial Painting, Inc.$937,643+123%
7M & J Construction Company of Pinellas$1,142,059+172%
ALDOT contract 20250829025: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Cekra, Inc2. Omega Coatings & Construction, LLC3. Gulf Coast Contracting, LLC4. Olympus Painting Contractors, Inc.5. International Rigging Group, LLC6. Elite Industrial Painting, Inc.
0010Coating existing bridge at MP 315.314 (521B001)LS1$197,000$366,000$260,000$472,500$604,152$490,209
0020Coating existing bridge at MP 1.005 (521B002)LS1$116,220$130,000$330,000$282,500$209,955$382,000
0030Mobilization (600A000)LS1$42,000$50,000$20,000$50,000$50,000$60,000
0040Construction fuel (maximum bid limited to $ 18,000.00) (698A000)LS1$18,000$100.00$10,000$18,000$0.00$5,000.00
0050Construction signs (740B000)SF2,278$10.00$8.00$2.00$15.00$5.00$0.10
0060Channelizing drums (740D000)EACH100$10.00$0.25$5.00$30.00$1.00$1.00
0070Cones (36 inches high) (740E000)EACH100$10.00$0.15$1.00$24.00$1.00$1.00
0080Portable sequential arrow and chevron sign unit (741C010)EACH2$4,000.00$550.00$200.00$1,170.00$50.00$1.50
0090Portable changeable message sign, type 2 (742A001)EACH2$7,000.00$1,000.00$500.00$2,340.00$500.00$1.50
ALDOT contract 20250829025: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

Every contract let that day: ALDOT letting of August 29, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy