| 0010 | Removing guardrail (206D001) | LF | 5,825 | $3.20 | $3.31 | $3.16 | $3.27 |
| 0020 | Removing guardrail end anchor (all type) (206E008) | EACH | 59 | $380.00 | $386.70 | $368.42 | $380.98 |
| 0030 | Tack coat (405A000) | GAL | 22,719 | $3.00 | $4.52 | $3.71 | $3.77 |
| 0040 | Micro-milling existing pavement (approximately 1.10" thru 2.00" thick) (408B001) | SY | 227,189 | $0.50 | $1.32 | $0.55 | $1.36 |
| 0050 | Material remixing device (410H000) | EACH | 1 | $40,000 | $40,999 | $48,430 | $20,000 |
| 0060 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range E (424A280) | TON | 14,730 | $75.00 | $83.27 | $85.36 | $103.59 |
| 0070 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D (424A360) | TON | 4,015 | $73.00 | $80.07 | $92.00 | $121.98 |
| 0080 | Superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range E (424B285) | TON | 1,000 | $85.00 | $115.28 | $89.24 | $159.24 |
| 0090 | Scoring bituminous pavement surface (428A001) | MI | 17 | $620.00 | $572.99 | $542.21 | $300.21 |
| 0100 | Aggregate surfacing (1" down, crusher run) (430B043) | TON | 1,339 | $30.00 | $49.64 | $33.98 | $49.29 |
| 0110 | Mobilization (600A000) | LS | 1 | $93,129 | $44,921 | $23,983 | $123,000 |
| 0120 | Bridge guardrail retrofit, type SC (629D003) | EACH | 3 | $5,650.00 | $6,242.40 | $110,020 | $6,057.87 |
| 0130 | Steel beam guardrail, class A, type 2 (630A001) | LF | 6,413 | $20.00 | $20.99 | $20.00 | $20.68 |
| 0140 | Guardrail end anchor, type 8 (MASH) (630C077) | EACH | 19 | $1,250.00 | $1,325.82 | $1,263.16 | $1,306.22 |
| 0150 | Guardrail end anchor, type 13 (MASH) (630C079) | EACH | 12 | $3,600.00 | $3,756.49 | $3,578.95 | $3,700.96 |
| 0160 | Guardrail end anchor, type 20 series (MASH) (630C080) | EACH | 28 | $3,200.00 | $3,314.55 | $3,157.89 | $3,265.55 |
| 0170 | Sand bags (665G000) | EACH | 200 | $4.00 | $6.63 | $16.81 | $7.77 |
| 0180 | Wattle (665Q002) | LF | 500 | $4.00 | $10.84 | $13.09 | $8.63 |
| 0190 | Construction fuel (maximum bid limited to $ 173,000.00) (698A000) | LS | 1 | $0.00 | $0.01 | $0.01 | $0.00 |
| 0200 | Solid white, class 2, type A traffic stripe (5" wide) (701A227) | MI | 11 | $4,300.00 | $4,640.37 | $4,421.05 | $4,503.20 |
| 0210 | Solid yellow, class 2, type A traffic stripe (5" wide) (701A230) | MI | 9 | $4,300.00 | $4,640.37 | $4,421.05 | $4,503.20 |
| 0220 | Broken white, class 2, type A traffic stripe (5" wide) (701A239) | MI | 9 | $2,700.00 | $2,927.85 | $2,789.47 | $2,841.30 |
| 0230 | Dotted, class W, type A traffic stripe(lane drop 10" wide) (701B059) | LF | 808 | $5.60 | $6.08 | $5.79 | $5.90 |
| 0240 | Dotted, class 2, type A traffic stripe(lane drop 10" wide) (701B063) | LF | 1,160 | $4.10 | $4.42 | $4.21 | $4.29 |
| 0250 | Dotted, class 2, type A traffic stripe (5" wide) (701B207) | LF | 12,435 | $2.10 | $2.21 | $2.11 | $2.14 |
| 0260 | Broken temporary traffic stripe (701C000) | MI | 18 | $1,200.00 | $1,270.58 | $1,210.53 | $1,233.02 |
| 0270 | Solid temporary traffic stripe (701C001) | MI | 40 | $1,190.00 | $1,298.20 | $1,236.84 | $1,259.82 |
| 0280 | Broken white, class W, type A traffic stripe (5" wide) (701G142) | LF | 3,097 | $3.30 | $3.59 | $3.42 | $3.48 |
| 0290 | Solid white, class W, type A traffic stripe (5"wide) (701G146) | LF | 3,577 | $5.60 | $6.08 | $5.79 | $5.90 |
| 0300 | Solid yellow, class W, type A traffic stripe (5" wide) (701G154) | LF | 2,934 | $5.60 | $6.08 | $5.79 | $5.90 |
| 0310 | Solid traffic stripe removed (tape) (701H002) | LF | 6,511 | $0.80 | $0.83 | $0.79 | $0.80 |
| 0320 | Broken traffic stripe removed (tape) (701H007) | LF | 3,097 | $0.80 | $0.83 | $0.79 | $0.80 |
| 0330 | Traffic control markings, class 2, type A (703A002) | SF | 17,689 | $5.60 | $6.08 | $5.79 | $5.90 |
| 0340 | Traffic control legends, class 2, type A (703B002) | SF | 157 | $6.50 | $6.91 | $6.58 | $6.70 |
| 0350 | Pavement markers, class A-H, type 2-C (705A030) | EACH | 951 | $5.60 | $6.08 | $5.79 | $5.90 |
| 0360 | Pavement markers, class A-H, type 1-A (705A031) | EACH | 102 | $5.60 | $6.08 | $5.79 | $5.90 |
| 0370 | Pavement markers, class A-H, type 1-B (705A032) | EACH | 728 | $5.60 | $6.08 | $5.79 | $5.90 |
| 0380 | Pavement markers, class A-H, type 2-E (705A038) | EACH | 325 | $5.60 | $6.08 | $5.79 | $5.90 |
| 0390 | Construction signs (740B000) | SF | 2,905 | $6.00 | $7.18 | $6.84 | $6.43 |
| 0400 | Special construction signs (740C000) | SF | 125 | $6.00 | $7.73 | $7.37 | $6.43 |
| 0410 | Channelizing drums (740D000) | EACH | 200 | $12.00 | $27.62 | $26.32 | $11.79 |
| 0420 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 2 | $415.00 | $602.15 | $1,105.26 | $670.12 |