ALDOT contract 20250131057 bid tabulation
ROADWAY IMPROVEMENTS (TURN LANE ADDITIONS) ON SR-9 AT THE PROPOSED ENTRANCE TO THE INDUSTRIAL PARK IN ASHLAND. Let by Alabama DOT on January 31, 2025, Clay, 0404. 4 bids received; low bid $340,827 by Gary Ingram Grading & Paving, Inc..
- Owner
- Alabama DOT
- Letting
- 31 JAN 2025
- Pay items
- 49
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gary Ingram Grading & Paving, Inc. | $340,827 | Low |
| 2 | Alabama Grading & Excavation, LLC. | $414,152 | +22% |
| 3 | Apac-Alabama, Inc. | $423,615 | +24% |
| 4 | McElhenney Construction Co., LLC | $494,377 | +45% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gary Ingram Grading & Paving, Inc. | 2. Alabama Grading & Excavation, LLC. | 3. Apac-Alabama, Inc. | 4. McElhenney Construction Co., LLC |
|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (maximum allowable bid $ 8,000.00 per acre) (approximately 1 acre) (201A002) | LS | 1 | $5,380.00 | $8,000.00 | $8,000.00 | $7,143.49 |
| 0020 | Removing pipe (206D000) | LF | 27 | $30.00 | $90.00 | $51.94 | $66.32 |
| 0030 | Removing fence (206D011) | LF | 175 | $7.50 | $15.00 | $13.85 | $15.33 |
| 0040 | Unclassified excavation (210A000) | CY | 1,475 | $29.75 | $32.50 | $28.86 | $34.81 |
| 0050 | Roadbed processing (230A000) | RBST | 5 | $650.00 | $1,150.00 | $923.45 | $1,119.15 |
| 0060 | Crushed aggregate base course, type B, plant mixed, 6" compacted thickness (301A012) | SY | 1,380 | $22.60 | $24.50 | $19.72 | $33.34 |
| 0070 | Bituminous treatment A (401A000) | SY | 1,380 | $2.60 | $1.90 | $3.04 | $1.28 |
| 0080 | Tack coat (405A000) | GAL | 390 | $10.00 | $9.00 | $6.44 | $8.94 |
| 0090 | Planing existing pavement (approximately 1.10" thru 2.0" thick) (408A052) | SY | 3,400 | $2.99 | $5.30 | $6.38 | $5.15 |
| 0100 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D (424A360) | TON | 360 | $134.00 | $141.00 | $153.67 | $189.41 |
| 0110 | Superpave bituminous concrete upper binder layer, 1" maximum aggregate size mix, esal range C/D (424B651) | TON | 230 | $114.80 | $127.00 | $166.23 | $202.35 |
| 0120 | Superpave bituminous concrete lower binder layer, 1" maximum aggregate size mix, esal range C/D (424B681) | TON | 235 | $114.30 | $127.00 | $161.72 | $202.35 |
| 0130 | Scoring bituminous pavement surface (428A001) | MI | 1 | $1,660.00 | $1,000.00 | $349.79 | $368.23 |
| 0140 | Mobilization (600A000) | LS | 1 | $33,730 | $87,500 | $80,781 | $87,282 |
| 0150 | Right of way markers (602A000) | EACH | 4 | $1,765.00 | $750.00 | $634.87 | $1,334.19 |
| 0160 | Filter blanket, geotextile (610D003) | SY | 40 | $2.00 | $14.00 | $3.30 | $10.28 |
| 0170 | Combination curb & gutter, type C (623C000) | LF | 179 | $57.50 | $58.00 | $92.10 | $46.68 |
| 0180 | Woven wire fence (metal posts) (635A001) | LF | 175 | $42.50 | $14.50 | $33.68 | $49.10 |
| 0190 | Topsoil (650A000) | CY | 300 | $69.60 | $58.00 | $34.63 | $45.67 |
| 0200 | Seeding (652A100) | ACRE | 1 | $1,925.00 | $2,250.00 | $890.30 | $2,305.88 |
| 0210 | Mulching (656A010) | ACRE | 1 | $1,815.00 | $2,400.00 | $1,473.60 | $1,034.00 |
| 0220 | Temporary seeding (665A000) | ACRE | 1 | $1,790.00 | $1,450.00 | $460.50 | $1,034.00 |
| 0230 | Temporary mulching (665B001) | TON | 3 | $1,595.00 | $1,500.00 | $614.00 | $344.67 |
| 0240 | Silt fence (665J002) | LF | 200 | $2.85 | $8.00 | $5.53 | $6.17 |
| 0250 | Silt fence removal (665O001) | LF | 200 | $1.38 | $2.00 | $1.84 | $4.98 |
| 0260 | Wattle (665Q002) | LF | 50 | $8.86 | $13.50 | $9.82 | $16.72 |
| 0270 | Geometric controls (680A001) | LS | 1 | $13,590 | $14,500 | $18,052 | $29,927 |
| 0280 | Construction fuel (maximum bid limited to $ 17,450.00) (698A000) | LS | 1 | $0.00 | $0.01 | $0.00 | $0.00 |
| 0290 | Dotted, class 2, type A traffic stripe (5" wide) (701B207) | LF | 180 | $2.10 | $3.00 | $2.46 | $2.45 |
| 0300 | Solid temporary traffic stripe (701C001) | MI | 2 | $1,150.00 | $1,250.00 | $1,289.40 | $1,288.80 |
| 0310 | Broken temporary traffic stripe (701E010) | LF | 1,320 | $0.25 | $0.55 | $0.25 | $0.25 |
| 0320 | Solid white, class 2, type A traffic stripe (5" wide) (701G253) | LF | 2,205 | $2.10 | $1.00 | $2.46 | $2.45 |
| 0330 | Broken yellow, class 2, type A traffic stripe (5" wide) (701G256) | LF | 660 | $1.60 | $0.75 | $1.84 | $1.84 |
| 0340 | Solid yellow, class 2, type A traffic stripe (5" wide) (701G265) | LF | 2,440 | $2.10 | $1.10 | $2.46 | $2.45 |
| 0350 | Traffic control markings, class 2, type A (703A002) | SF | 342 | $10.50 | $7.25 | $12.28 | $12.27 |
| 0360 | Traffic control legends, class 2, type A (703B002) | SF | 46 | $10.50 | $6.90 | $12.28 | $12.27 |
| 0370 | Temporary traffic control markings (703D001) | SF | 102 | $3.15 | $3.75 | $3.68 | $3.68 |
| 0380 | Pavement markers, class A-H, type 2-C (705A030) | EACH | 15 | $10.50 | $12.00 | $12.28 | $12.27 |
| 0390 | Pavement markers, class A-H, type 1-B (705A032) | EACH | 130 | $10.50 | $12.00 | $12.28 | $12.27 |
| 0400 | Pavement markers, class A-H, type 2-D (705A037) | EACH | 20 | $10.50 | $12.00 | $12.28 | $12.27 |
| 0410 | Pavement markers, class A-H, type 2-E (705A038) | EACH | 65 | $10.50 | $12.00 | $12.28 | $12.27 |
| 0420 | Class 10 aluminum flat sign panels (type XI background) (710A163) | SF | 12 | $26.25 | $28.00 | $30.73 | $30.69 |
| 0430 | Class 4, aluminum flat sign panels (type IV background) (710A171) | SF | 23 | $21.00 | $26.80 | $24.59 | $28.84 |
| 0440 | Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel) (710B021) | LF | 84 | $16.80 | $24.00 | $19.67 | $20.87 |
| 0450 | Roadway sign relocation (711A000) | LS | 1 | $1,100.00 | $2,500.00 | $1,229.27 | $613.71 |
| 0460 | Construction signs (740B000) | SF | 365 | $6.30 | $8.00 | $7.38 | $7.36 |
| 0470 | Channelizing drums (740D000) | EACH | 50 | $43.50 | $60.00 | $50.96 | $12.27 |
| 0480 | Cones (36 inches high) (740E000) | EACH | 50 | $10.00 | $30.00 | $50.96 | $30.69 |
| 0490 | Barricades, type III (740F002) | EACH | 2 | $300.00 | $750.00 | $307.32 | $92.06 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of January 31, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.