ALDOT contract 20250725029 bid tabulation
INTERSECTION IMPROVEMENTS AND ADDITIONAL THRU LANES ON I-20/I-59 AT THE DAIMLER BENZ BOULEVARD INTERCHANGE (EXIT 89) IN VANCE. Let by Alabama DOT on July 25, 2025, Tuscaloosa, 0502. 4 bids received; low bid $2,300,000 by Ikaros, LLC.
- Owner
- Alabama DOT
- Letting
- 25 JUL 2025
- Pay items
- 114
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ikaros, LLC | $2,300,000 | Low |
| 2 | Apac-Alabama, Inc. | $2,589,202 | +13% |
| 3 | Cornerstone Civil Contractors, LLC | $2,772,644 | +21% |
| 4 | Bulls Construction Group, LLC | $2,913,419 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ikaros, LLC | 2. Apac-Alabama, Inc. | 3. Cornerstone Civil Contractors, LLC | 4. Bulls Construction Group, LLC |
|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (maximum allowable bid $ 8,000.00 per acre) (approximately 1 acre) (201A002) | LS | 1 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 |
| 0020 | Removing concrete slope paving (206C002) | SY | 351 | $50.00 | $63.62 | $60.00 | $40.00 |
| 0030 | Removing concrete flumes (206C003) | SY | 730 | $50.00 | $44.53 | $35.00 | $50.00 |
| 0040 | Removing curb and gutter (206D003) | LF | 587 | $35.00 | $31.81 | $35.00 | $25.00 |
| 0050 | Unclassified excavation (210A000) | CY | 2,278 | $5.00 | $44.53 | $84.50 | $75.00 |
| 0060 | Borrow excavation (A4 or better) (210D011) | CY | 2,008 | $5.00 | $57.26 | $100.00 | $100.00 |
| 0070 | Crushed aggregate, section 825, type B, for miscellaneous use (305B078) | TON | 100 | $75.00 | $82.71 | $142.00 | $100.00 |
| 0080 | Plant mix bituminous base, widening, mix 2 (327D021) | TON | 1,231 | $138.00 | $120.27 | $140.45 | $146.00 |
| 0090 | Tack coat (405A000) | GAL | 4,430 | $5.62 | $5.03 | $6.00 | $7.00 |
| 0100 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D (424A360) | TON | 620 | $212.29 | $191.33 | $223.00 | $230.00 |
| 0110 | Superpave bituminous concrete upper binder layer, 1" maximum aggregate size mix, esal range C/D (424B651) | TON | 977 | $140.40 | $126.45 | $147.50 | $153.00 |
| 0120 | Superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range C/D (424B655) | TON | 100 | $438.06 | $396.26 | $460.00 | $600.00 |
| 0130 | Superpave bituminous concrete upper binder layer, leveling, 1" maximum aggregate size mix, esal range C/D (424B659) | TON | 50 | $252.72 | $226.20 | $264.00 | $275.00 |
| 0140 | Superpave bituminous concrete lower binder layer, 1" maximum aggregate size mix, esal range C/D (424B681) | TON | 1,636 | $139.84 | $126.20 | $146.90 | $152.00 |
| 0150 | Mobilization (600A000) | LS | 1 | $224,106 | $305,783 | $310,000 | $200,000 |
| 0160 | Loose riprap,class 2 (remove & relocate) (610A015) | SY | 410 | $60.00 | $76.34 | $61.50 | $155.00 |
| 0170 | Filter blanket, geotextile (610D003) | SY | 1,100 | $6.00 | $9.78 | $3.60 | $6.00 |
| 0180 | Slope paving (614A000) | CY | 201 | $650.00 | $1,272.38 | $1,196.50 | $850.00 |
| 0190 | Combination curb & gutter, type C (623C000) | LF | 452 | $55.00 | $63.62 | $40.80 | $70.00 |
| 0200 | Combination curb & gutter, type C (special) (623C004) | LF | 78 | $125.00 | $82.70 | $50.20 | $340.00 |
| 0210 | Steel beam guardrail, class A, type 2 relocated (631F001) | LF | 50 | $44.92 | $48.35 | $67.45 | $83.00 |
| 0220 | Guardrail end anchor, type 20 series relocated (631G015) | EACH | 2 | $2,955.26 | $3,180.96 | $4,045.00 | $5,000.00 |
| 0230 | Topsoil from stockpiles (650B000) | CY | 424 | $50.00 | $38.17 | $65.50 | $100.00 |
| 0240 | Seeding (652A100) | ACRE | 2 | $2,068.68 | $1,526.86 | $1,966.00 | $3,000.00 |
| 0250 | Solid sodding (bermuda) (654A001) | SY | 1,200 | $10.64 | $12.09 | $10.00 | $25.00 |
| 0260 | Mulching (656A010) | ACRE | 2 | $1,950.47 | $1,781.35 | $1,855.00 | $3,000.00 |
| 0270 | Erosion control product, type S3 (659C001) | SY | 3,400 | $1.93 | $4.61 | $1.85 | $5.00 |
| 0280 | Temporary seeding (665A000) | ACRE | 4 | $1,920.92 | $731.62 | $1,825.00 | $3,000.00 |
| 0290 | Temporary mulching (665B001) | TON | 12 | $1,714.05 | $795.24 | $1,630.00 | $2,000.00 |
| 0300 | Polyethylene (665E000) | SY | 1,200 | $4.24 | $15.46 | $4.00 | $5.00 |
| 0310 | Sand bags (665G000) | EACH | 500 | $9.16 | $6.12 | $8.70 | $20.00 |
| 0320 | Temporary riprap, class 2 (665I000) | TON | 81 | $75.00 | $133.60 | $119.00 | $100.00 |
| 0330 | Silt fence (665J002) | LF | 5,900 | $3.06 | $6.30 | $2.90 | $8.00 |
| 0340 | Temporary coarse aggregate,aldot number 1 (665N000) | TON | 200 | $75.00 | $82.71 | $105.00 | $103.00 |
| 0350 | Temporary coarse aggregate,aldot number 4 (665N001) | TON | 36 | $100.00 | $82.71 | $95.00 | $103.00 |
| 0360 | Silt fence removal (665O001) | LF | 5,900 | $1.24 | $2.54 | $1.20 | $2.00 |
| 0370 | Inlet protection, stage 3 or 4 (665P005) | EACH | 3 | $196.23 | $95.43 | $186.00 | $1,000.00 |
| 0380 | Wattle (665Q002) | LF | 700 | $9.52 | $11.45 | $9.00 | $20.00 |
| 0390 | Geometric controls (680A001) | LS | 1 | $115,000 | $68,709 | $129,800 | $35,000 |
| 0400 | Construction fuel (maximum bid limited to $ 87,000.00) (698A000) | LS | 1 | $87,000 | $0.00 | $25,000 | $0.00 |
| 0410 | Dotted, class 2, type A traffic stripe(lane drop 10" wide) (701B063) | LF | 2,320 | $3.55 | $3.82 | $3.37 | $4.00 |
| 0420 | Dotted, class 2, type A traffic stripe (5" wide) (701B207) | LF | 1,791 | $1.18 | $1.27 | $1.12 | $2.00 |
| 0430 | Broken temporary traffic stripe (701C000) | MI | 1 | $1,418.52 | $1,526.86 | $1,348.00 | $1,500.00 |
| 0440 | Solid temporary traffic stripe (701C001) | MI | 2 | $1,418.52 | $1,526.86 | $1,348.00 | $1,500.00 |
| 0450 | Dotted temporary traffic stripe (701F000) | LF | 1,591 | $0.27 | $0.29 | $0.26 | $1.00 |
| 0460 | Dotted temporary traffic stripe (lane drop) (701F010) | LF | 2,320 | $0.27 | $0.29 | $0.26 | $1.00 |
| 0470 | Broken white, class 2, type A traffic stripe (5" wide) (701G242) | LF | 3,520 | $1.18 | $1.27 | $1.12 | $2.00 |
| 0480 | Solid white, class 2, type A traffic stripe (5" wide) (701G253) | LF | 7,497 | $1.18 | $1.27 | $1.12 | $2.00 |
| 0490 | Solid yellow, class 2, type A traffic stripe (5" wide) (701G265) | LF | 4,904 | $1.18 | $1.27 | $1.12 | $2.00 |
| 0500 | Solid traffic stripe removed (plastic) (701H001) | LF | 11,055 | $1.48 | $1.59 | $1.40 | $2.25 |
| 0510 | Broken traffic stripe removed (plastic) (701H006) | LF | 1,065 | $1.18 | $1.27 | $1.12 | $2.00 |
| 0520 | Dotted traffic stripe removed (plastic) (701H011) | LF | 1,085 | $1.18 | $1.27 | $1.12 | $2.00 |
| 0530 | Traffic control markings, class 2, type A (703A002) | SF | 2,886 | $5.91 | $6.36 | $5.62 | $6.00 |
| 0540 | Traffic control legends, class 2, type A (703B002) | SF | 269 | $6.50 | $7.00 | $6.18 | $7.00 |
| 0550 | Removal of existing traffic control markings or legends (plastic) (703C001) | SF | 3,190 | $4.14 | $4.45 | $3.93 | $4.50 |
| 0560 | Temporary traffic control markings (703D001) | SF | 2,886 | $3.25 | $3.50 | $3.09 | $5.00 |
| 0570 | Temporary traffic control legends (703E001) | SF | 269 | $3.55 | $3.82 | $3.37 | $5.00 |
| 0580 | Pavement markers, class A-H, type 2-C (705A030) | EACH | 427 | $5.91 | $6.36 | $5.62 | $6.50 |
| 0590 | Pavement markers, class A-H, type 1-B (705A032) | EACH | 29 | $5.91 | $6.36 | $5.62 | $6.50 |
| 0600 | Pavement markers, class A-H, type 2-D (705A037) | EACH | 43 | $5.91 | $6.36 | $5.62 | $6.50 |
| 0610 | Pavement markers, class A-H, type 2-E (705A038) | EACH | 22 | $5.91 | $6.36 | $5.62 | $6.50 |
| 0620 | Class 4, aluminum flat sign panels (type IV background) (710A171) | SF | 45 | $33.10 | $31.81 | $26.40 | $25.00 |
| 0630 | Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel) (710B021) | LF | 70 | $23.64 | $22.27 | $20.22 | $25.00 |
| 0640 | Removal of existing roadway signs (710C000) | LS | 1 | $295.53 | $3,817.17 | $112.00 | $1,500.00 |
| 0650 | Roadway sign relocation (711A000) | LS | 1 | $10,639 | $9,542.88 | $2,247.00 | $11,000 |
| 0660 | Fiber optic drop cable, 12F (729A101) | LF | 310 | $6.74 | $7.25 | $4.33 | $7.00 |
| 0670 | Fiber distribution unit, secondary (729B010) | EACH | 1 | $1,684.83 | $1,812.18 | $1,355.00 | $1,900.00 |
| 0680 | Fan-out kit (729B020) | EACH | 1 | $1,123.22 | $1,208.13 | $111.00 | $1,300.00 |
| 0690 | FO patch cable, simplex, LC-LC, 2 meter (729B131) | EACH | 2 | $280.81 | $302.03 | $21.63 | $300.00 |
| 0700 | Network device, type C (fmes) (729C020) | EACH | 1 | $2,808.05 | $3,020.27 | $3,857.00 | $3,100.00 |
| 0710 | Camera, positioner (729D102) | EACH | 1 | $11,232 | $12,081 | $11,922 | $12,250 |
| 0720 | Conduit, underground, non-metallic, 2 inch (729I101) | LF | 80 | $13.48 | $14.50 | $17.42 | $15.00 |
| 0730 | Locate tone wire (729I800) | LF | 60 | $1.68 | $1.81 | $0.93 | $2.50 |
| 0740 | Warning tape (729I810) | LF | 60 | $2.53 | $5.44 | $1.19 | $3.50 |
| 0750 | Miscellaneous infrastructure, fusion splicing (729N000) | EACH | 12 | $168.48 | $181.22 | $93.30 | $200.00 |
| 0760 | Miscellaneous infrastructure, splice closure, underground, 12 fiber (729N111) | EACH | 1 | $4,492.88 | $4,832.44 | $983.00 | $5,000.00 |
| 0770 | Miscellaneous infrastructure, commbox, type F1 (729N301) | EACH | 1 | $3,931.27 | $4,228.40 | $3,556.00 | $4,300.00 |
| 0780 | Miscellaneous infrastructure, fiber marker post (729N500) | EACH | 1 | $280.81 | $302.05 | $235.00 | $305.00 |
| 0790 | Removal of existing traffic control unit (partial) ( I-20/I-59 eastbound ramp) (730A012) | LS | 1 | $5,616.11 | $6,040.58 | $6,623.00 | $7,200.00 |
| 0800 | Removal of existing traffic control unit (partial) ( I-20/I-59 westbound ramp) (730A013) | LS | 1 | $5,616.11 | $6,040.58 | $8,188.00 | $8,900.00 |
| 0810 | Furnishing and installing traffic control unit ( I-20/I-59 eastbound ramp) (730C000) | LS | 1 | $13,479 | $14,497 | $41,348 | $42,456 |
| 0820 | Furnishing and installing traffic control unit ( I-20/I-59 westbound ramp) (730C001) | LS | 1 | $13,479 | $14,497 | $38,631 | $39,506 |
| 0830 | Furnishing and installing traffic control unit (temporary)( I-20/I-59 westbound ramp) (730C030) | LS | 1 | $20,218 | $21,746 | $16,226 | $22,000 |
| 0840 | Metal traffic signal pole foundation (730E000) | EACH | 4 | $13,479 | $14,497 | $12,996 | $15,000 |
| 0850 | Metal traffic signal strain pole (730G001) | EACH | 4 | $15,725 | $16,914 | $14,378 | $17,000 |
| 0860 | Wood traffic signal strain pole (730G005) | EACH | 4 | $5,391.46 | $5,798.94 | $3,757.00 | $6,000.00 |
| 0870 | Loop wire (730H001) | LF | 6,475 | $5.62 | $6.04 | $0.87 | $6.00 |
| 0880 | Loop detector lead-in-cable (730I001) | LF | 5,300 | $8.42 | $9.06 | $2.11 | $9.25 |
| 0890 | Vehicle loop detector (730J010) | EACH | 17 | $280.81 | $302.03 | $367.70 | $305.00 |
| 0900 | Traffic signal junction box type S1 (730K001) | EACH | 6 | $842.42 | $906.08 | $777.50 | $915.00 |
| 0910 | Traffic signal junction box type S2 (730K002) | EACH | 1 | $1,684.83 | $1,812.18 | $1,560.70 | $1,900.00 |
| 0920 | 1", non-metallic, conduit (730L003) | LF | 150 | $11.23 | $12.08 | $12.90 | $13.00 |
| 0930 | 2", non-metallic, conduit (730L005) | LF | 525 | $13.48 | $14.50 | $14.48 | $15.00 |
| 0940 | Luminaire extension assembly, 12' (730N000) | EACH | 4 | $3,931.27 | $4,228.39 | $2,691.00 | $4,300.00 |
| 0950 | Vehicular signal head, 12 inch, 3 (730P022) | EACH | 18 | $1,347.87 | $1,449.73 | $1,501.00 | $1,500.00 |
| 0960 | Vehicular signal head, 12 inch, 4 (730P023) | EACH | 4 | $1,797.15 | $1,932.98 | $1,628.00 | $2,000.00 |
| 0970 | Controller assembly, type NEMA, 16 channels (730R041) | EACH | 1 | $31,450 | $33,827 | $48,315 | $35,000 |
| 0980 | Controller cabinet, type NEMA, 16 channels (730R162) | EACH | 1 | $31,450 | $33,827 | $31,655 | $35,000 |
| 0990 | Electrical power service assembly with wood pole (730T010) | EACH | 1 | $6,514.68 | $7,007.06 | $3,320.00 | $7,100.00 |
| 1000 | Relocation of ITS infrastructure ( I- 20/I-59 eastbound ramp) (734W000) | LS | 1 | $5,616.11 | $6,040.58 | $1,168.00 | $6,100.00 |
| 1010 | Construction signs (740B000) | SF | 916 | $8.27 | $7.00 | $6.74 | $8.00 |
| 1020 | Channelizing drums (740D000) | EACH | 400 | $47.28 | $71.25 | $16.30 | $75.00 |
| 1030 | Cones (36 inches high) (740E000) | EACH | 100 | $28.37 | $71.25 | $27.00 | $50.00 |
| 1040 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 2 | $2,364.21 | $2,613.50 | $786.50 | $5,000.00 |
| 1050 | Portable changeable message sign, type 2 (742A001) | EACH | 2 | $5,910.52 | $2,290.29 | $1,460.00 | $4,000.00 |
| 1060 | Uniformed police officer (745A000) | HR | 16 | $100.00 | $83.72 | $140.00 | $98.00 |
| 1070 | Electrical junction box,type 1 (750D200) | EACH | 11 | $842.42 | $906.09 | $774.00 | $915.00 |
| 1080 | Combined duct and cable,2 #6 AWG/ 1 #6 AWG GND (750G010) | LF | 150 | $17.97 | $19.33 | $19.70 | $20.00 |
| 1090 | Combined duct and cable,2 #4 AWG/ 1 #4 AWG GND (750G100) | LF | 300 | $17.97 | $19.33 | $22.10 | $20.00 |
| 1100 | Remove luminaire pole foundation, concrete (751J006) | EACH | 5 | $1,684.83 | $1,812.17 | $1,283.00 | $1,850.00 |
| 1110 | Remove roadway luminaire assembly (751L025) | EACH | 4 | $1,684.83 | $1,812.17 | $642.00 | $1,850.00 |
| 1120 | Remove electrical junction box (751L052) | EACH | 8 | $561.61 | $604.06 | $125.00 | $615.00 |
| 1130 | Remove conductors in the project limits (751M000) | LS | 1 | $561.61 | $604.05 | $1,003.00 | $615.00 |
| 1140 | 6" electrical conduit, 1 line, type 5 installation (756A028) | LF | 110 | $140.40 | $151.01 | $58.20 | $155.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of July 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.