ALDOT contract 20250725015 bid tabulation
MICRO-FINE MILLING, RESURFACING, AND TRAFFIC STRIPE ON I-22 FROM THE MARION COUNTY LINE TO THE CR-1 OVERPASS (MP 40.300) NORTH OF ELDRIDGE. Let by Alabama DOT on July 25, 2025, Walker, 1008. 1 bid received; low bid $1,527,267 by Wiregrass Construction Company, Inc..
- Owner
- Alabama DOT
- Letting
- 25 JUL 2025
- Pay items
- 34
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Wiregrass Construction Company, Inc. | $1,527,267 | Low |
Bid tabulation
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of July 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.