ARDOT contract A50036 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 13.384 MILES OF HIGHWAY 16 IN CLEBURNE AND WHITE COUNTIES. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL OF GUARDRAIL, AGGREGATE BASE COURSE, ACHM BINDER AND SURFACE COURSES, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, APPROACH GUTTERS, MAINTENANCE OF TRAFFIC, GUARDRAIL, EROSION CONTROL, RUMBLE STRIPS AND STRIPES, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on January 15, 2025, Cleburne, White. 3 bids received; low bid $4,388,823 by Rogers Group, Inc..
- Owner
- Arkansas DOT
- Letting
- 15 JAN 2025
- Pay items
- 33
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rogers Group, Inc. | $4,388,823 | Low |
| 2 | CK Asphalt, LLC | $4,996,282 | +14% |
| 3 | Delta Asphalt of Arkansas, Inc. | $5,119,625 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rogers Group, Inc. | 2. CK Asphalt, LLC | 3. Delta Asphalt of Arkansas, Inc. |
|---|---|---|---|---|---|---|
| 0001 | Removal and disposal of guardrail (202132) | LF | 600 | $10.00 | $10.00 | $10.00 |
| 0002 | Aggregate base course (class 7) (303117) | TON | 500 | $45.00 | $32.80 | $66.49 |
| 0003 | Tack coat (401011) | GAL | 49,206 | $0.01 | $3.00 | $0.01 |
| 0004 | Mineral aggregate in achm binder course (1") (406161) | TON | 723 | $60.00 | $88.00 | $183.25 |
| 0005 | Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) (406402) | TON | 39 | $590.00 | $120.00 | $120.00 |
| 0006 | Mineral aggregate in achm surface course (1/2") (407162) | TON | 30,056 | $31.00 | $25.50 | $59.63 |
| 0007 | Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432) | TON | 1,783 | $900.00 | $1,300.00 | $600.00 |
| 0008 | Cold milling asphalt pavement (412002) | SY | 289,446 | $1.60 | $2.20 | $2.00 |
| 0009 | Achm patching of existing roadway (415011) | TON | 1,500 | $150.00 | $145.00 | $327.13 |
| 0010 | Approach gutters (504264) | CY | 66.76 | $3,100.00 | $1,800.00 | $3,085.40 |
| 0011 | Maintenance of traffic (603010) | LS | 1 | $217,500 | $125,000 | $115,000 |
| 0012 | Signs (604003) | SF | 2,020 | $8.00 | $8.00 | $4.25 |
| 0013 | Construction pavement markings (604041) | LF | 291,530 | $0.15 | $0.15 | $0.15 |
| 0014 | Concrete ditch paving (type A ) (605011) | SY | 317 | $167.00 | $96.00 | $165.66 |
| 0015 | Guardrail (type A) (617005) | LF | 1,350 | $29.00 | $39.00 | $37.00 |
| 0016 | Guardrail terminal (type 2) (617312) | EACH | 12 | $2,900.00 | $3,400.00 | $3,400.00 |
| 0017 | Thrie beam guardrail terminal (617332) | EACH | 8 | $2,000.00 | $2,500.00 | $2,500.00 |
| 0018 | Water (620030) | MGAL | 2.70 | $10.00 | $10.00 | $10.00 |
| 0019 | Solid sodding (624001) | SY | 211 | $10.00 | $10.00 | $25.00 |
| 0020 | Rumble strips in asphalt shoulders (642001) | LF | 49,030 | $0.14 | $0.25 | $0.14 |
| 0021 | Centerline rumble stripes in asphalt roadways (642102) | LF | 18,956 | $0.14 | $0.25 | $0.14 |
| 0022 | Reflectorized paint pavement marking white (10") (718004) | LF | 488 | $2.75 | $2.75 | $2.75 |
| 0023 | Thermoplastic pavement marking white (6") (719002) | LF | 149,076 | $0.65 | $0.63 | $0.63 |
| 0024 | Thermoplastic pavement marking white (8") (719003) | LF | 1,265 | $3.00 | $3.00 | $3.00 |
| 0025 | Thermoplastic pavement marking white (12") (719005) | LF | 1,005 | $5.80 | $5.75 | $5.75 |
| 0026 | Thermoplastic pavement marking yellow (6") (719102) | LF | 142,454 | $0.60 | $0.62 | $0.62 |
| 0027 | Thermoplastic pavement marking (words) (719201) | EACH | 11 | $225.00 | $220.00 | $220.00 |
| 0028 | Thermoplastic pavement marking (arrows) (719202) | EACH | 15 | $175.00 | $175.00 | $175.00 |
| 0029 | Thermoplastic pavement markings (wheelchair) (719204) | EACH | 1 | $500.00 | $500.00 | $500.00 |
| 0030 | Thermoplastic pavement marking (yield line) (719210) | LF | 31 | $20.00 | $20.50 | $20.50 |
| 0031 | Raised pavement markers (type II) (721002) | EACH | 1,363 | $4.70 | $4.65 | $4.65 |
| 0032 | Reinforcing steel-roadway (grade 60) (804003) | LB | 6,868 | $3.50 | $3.00 | $3.50 |
| 0033 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $200,000 | $125,000 | $230,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of January 15, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.