ARDOT contract A50040 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO MICROSURFACE APPROXIMATELY 7.627 MILES OF HIGHWAY 106 IN INDEPENDENCE COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEMS, MICROSURFACING, APPROACH GUTTERS, MAINTENANCE OF TRAFFIC, GUARDRAIL, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on February 26, 2025, Independence. 2 bids received; low bid $822,412 by Vance Brothers, Inc..

Owner
Arkansas DOT
Letting
26 FEB 2025
Pay items
17
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Vance Brothers, Inc.$822,412Low
2Atlas Asphalt, Inc.$1,134,348+38%
ARDOT contract A50040: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Vance Brothers, Inc.2. Atlas Asphalt, Inc.
0001Removal and disposal of approach gutters (202052)EACH4$3,967.51$3,707.95
0002Removal and disposal of guardrail (202132)LF1,468$6.42$10.00
0003Microsurfacing (418301)SY109,284$3.76$6.59
0004Approach gutters (504264)CY39.04$2,064.81$1,929.73
0005Maintenance of traffic (603009)LS1$22,882$38,581
0006Signs (604003)SF633$6.42$5.00
0007Construction pavement markings (604041)LF81,640$0.32$0.16
0008Guardrail (type A) (617005)LF1,000$32.10$35.00
0009Guardrail terminal (type 2) (617312)EACH7$3,103.00$3,300.00
0010Thrie beam guardrail terminal (617332)EACH7$2,033.00$2,300.00
0011Thermoplastic pavement marking white (6") (719002)LF82,040$0.75$0.65
0012Thermoplastic pavement marking white (12") (719005)LF14$7.49$6.00
0013Thermoplastic pavement marking yellow (6") (719102)LF81,740$0.75$0.65
0014Raised pavement markers (type II) (721002)EACH510$3.75$4.00
0015Bridge end terminal (734011)EACH1$28,890$32,000
0016Reinforcing steel-roadway (grade 60) (804003)LB3,908$3.21$3.00
0017Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$18,190$28,005
ARDOT contract A50040: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of February 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy