ARDOT contract A60042 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 8.625 MILES OF HIGHWAY 183 IN SALINE COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, SCARIFYING CONCRETE PAVEMENT, MAINTENANCE OF TRAFFIC, RUMBLE STRIPS, LOOP WIRING, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on January 15, 2025, Saline. 2 bids received; low bid $3,616,617 by Cranford Construction Co..

Owner
Arkansas DOT
Letting
15 JAN 2025
Pay items
21
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Cranford Construction Co.$3,616,617Low
2Redstone Construction Group, Inc.$4,160,485+15%
ARDOT contract A60042: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Cranford Construction Co.2. Redstone Construction Group, Inc.
0001Tack coat (401011)GAL36,076$0.01$0.10
0002Mineral aggregate in achm surface course (1/2") (407162)TON22,272$109.77$122.21
0003Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00) (407442)TON1,321$120.00$120.00
0004Cold milling asphalt pavement (412002)SY197,682$2.53$3.44
0005Achm patching of existing roadway (415011)TON500$150.72$275.00
0006Scarifying concrete pavement (510012)SY1,516$13.14$16.01
0007Maintenance of traffic (603010)LS1$194,076$132,846
0008Signs (604003)SF1,716$4.00$6.30
0009Construction pavement markings (604041)LF93,245$0.15$0.16
0010Construction pavement markings (words) (604045)EACH23$95.00$99.75
0011Construction pavement markings (arrows) (604046)EACH26$85.00$89.25
0012Rumble strips in asphalt shoulders (642001)LF65,483$0.28$0.20
0013Loop wiring class III (1C/16 A.W.G.) (704036)LF2,000$12.50$13.13
0014Thermoplastic pavement marking white (6") (719002)LF93,245$0.65$0.68
0015Thermoplastic pavement marking white (12") (719005)LF1,844$5.85$6.14
0016Thermoplastic pavement marking yellow (6") (719102)LF94,927$0.63$0.66
0017Thermoplastic pavement marking yellow (10") (719104)LF280$7.00$7.35
0018Thermoplastic pavement marking (words) (719201)EACH23$240.00$252.00
0019Thermoplastic pavement marking (arrows) (719202)EACH26$220.00$231.00
0020Raised pavement markers (type II) (721002)EACH1,198$4.50$4.73
0021Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$5,073.95$75,245
ARDOT contract A60042: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of January 15, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy