ARDOT contract A80038 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 15.801 MILES OF HIGHWAY 64 IN CONWAY COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL ITEMS, EARTHWORK, AGGREGATE BASE COURSE, AGGREGATE SURFACE COURSE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, APPROACH GUTTERS, MAINTENANCE OF TRAFFIC, GUARDRAIL, EROSION CONTROL, RUMBLE STRIPES, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on January 15, 2025, Conway. 3 bids received; low bid $6,887,228 by Rogers Group, Inc..

Owner
Arkansas DOT
Letting
15 JAN 2025
Pay items
36
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rogers Group, Inc.$6,887,228Low
2Blackstone Construction, LLC$7,482,805+9.0%
3CK Asphalt, LLC$7,935,930+15%
ARDOT contract A80038: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rogers Group, Inc.2. Blackstone Construction, LLC3. CK Asphalt, LLC
0001Removal and disposal of approach gutters (202052)EACH8$3,500.00$1,625.00$3,500.00
0002Removal and disposal of guardrail (202132)LF560$9.00$10.00$10.00
0003Unclassified excavation (210213)CY54$135.00$150.00$98.00
0004Compacted embankment (210611)CY54$350.00$365.00$28.50
0005Aggregate base course (class 7) (303117)TON230$55.00$100.00$42.00
0006Aggregate surface course (class D-8) (303308)TON3,950$40.00$51.31$38.60
0007Tack coat (401011)GAL78,483$1.00$0.01$3.00
0008Mineral aggregate in achm surface course (1/2") (407162)TON51,905$58.50$103.63$113.32
0009Asphalt binder (PG 64-22) in achm surface course (1/2") (minimum bid $120.00) (407432)TON64$590.00$120.00$120.00
0010Asphalt binder (PG 70-22) in achm surface course (1/2") (minimum bid $120.00) (407442)TON3,308$650.00$120.00$120.00
0011Cold milling asphalt pavement (412002)SY9,530$2.50$7.12$4.50
0012Asphalt concrete patching for maintenance of traffic (414011)TON397$200.00$150.00$165.00
0013Achm patching of existing roadway (415011)TON700$160.00$173.42$145.00
0014Approach gutters (504264)CY75.20$1,200.00$1,918.00$1,950.00
0015Maintenance of traffic (603009)LS1$255,000$180,000$78,000
0016Signs (604003)SF2,112$5.00$7.00$5.00
0017Traffic drums (604023)EACH40$28.00$28.00$30.00
0018Construction pavement markings (604041)LF537,626$0.25$0.25$0.25
0019Guardrail (type A) (617005)LF550$30.00$30.00$30.00
0020Guardrail terminal (type 2) (617312)EACH8$3,000.00$3,000.00$3,000.00
0021Thrie beam guardrail terminal (617332)EACH8$2,000.00$2,500.00$2,000.00
0022Lime (620001)TON1$400.00$300.00$400.00
0023Seeding (620011)ACRE0.50$5,000.00$4,000.00$5,000.00
0024Mulch cover (620022)ACRE0.50$5,000.00$3,000.00$5,000.00
0025Water (620030)MGAL11.80$10.00$10.00$10.00
0026Filter sock (12") (621168)LF400$9.50$12.50$9.50
0027Rumble stripes in asphalt shoulders (642011)LF125,521$0.13$0.18$0.22
0028Centerline rumble stripes in asphalt roadways (642102)LF78,451$0.13$0.18$0.22
0029Portable traffic signal system - actuated (701603)WEEK6$1,100.00$1,100.00$1,900.00
0030Thermoplastic pavement marking white (6") (719002)LF168,029$0.75$0.80$0.75
0031Thermoplastic pavement marking white (8") (719003)LF90$3.60$1.50$3.50
0032Thermoplastic pavement marking yellow (6") (719102)LF100,784$0.80$0.80$0.75
0033Thermoplastic pavement marking (railroad emblems) (719203)EACH1$750.00$800.00$700.00
0034Raised pavement markers (type II) (721002)EACH1,100$4.20$7.00$4.00
0035Reinforcing steel-roadway (grade 60) (804003)LB6,648$1.75$2.50$4.00
0036Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$325,000$350,000$275,000
ARDOT contract A80038: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of January 15, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy