ARDOT contract C71004 bid tabulation

THE PURPOSE OF THIS PROJECT IS TO OVERLAY AND SURFACE APPROXIMATELY 1.14 MILES OF VARIOUS CITY STREETS IN THE CITY OF CLINTON IN VAN BUREN COUNTY. THIS PROJECT CONSISTS OF TRENCHING AND SHOULDER PREPARATION, AGGREGATE SURFACE COURSE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS. Let by Arkansas DOT on May 21, 2025, Van Buren. 2 bids received; low bid $241,661 by Rogers Group, Inc..

Owner
Arkansas DOT
Letting
21 MAY 2025
Pay items
12
Data through
04 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rogers Group, Inc.$241,661Low
2CK Asphalt, LLC$255,910+6.0%
ARDOT contract C71004: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rogers Group, Inc.2. CK Asphalt, LLC
0001Trenching and shoulder preparation (215001)STA5$500.00$280.00
0003Aggregate surface course (class D-8) (303308)TON141$60.00$24.00
0004Tack coat (401011)GAL1,867$1.00$1.00
0005Mineral aggregate in achm surface course (3/8") (407161)TON1,991$21.00$25.00
0006Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431)TON129$1,050.00$1,200.00
0007Cold milling asphalt pavement (412001)SY3,641$5.00$4.75
0008Achm patching of existing roadway (415011)TON30$250.00$240.00
0009Mobilization (unit bid amount may not exceed 5% of subtotal) (601001)LS1$10,000$8,600.00
0010Maintenance of traffic (603009)LS1$10,000$7,500.00
0011Signs (604003)SF72$6.00$12.00
0012Reflectorized paint pavement marking white (4") (718001)LF8,870$0.26$0.16
0014Reflectorized paint pavement marking yellow (4") (718101)LF12,038$0.26$0.15
ARDOT contract C71004: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.

Every contract let that day: ARDOT letting of May 21, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy