ARDOT contract C76087 bid tabulation
THE PURPOSE OF THIS PROJECT IS TO OVERLAY APPROXIMATELY 1.05 MILES OF VARIOUS CITY STREETS IN THE CITY OF DAMASCUS IN VAN BUREN COUNTY, APPROXIMATELY 2.38 MILES OF VARIOUS CITY STREETS IN THE CITY OF GUY IN FAULKNER COUNTY, AND APPROXIMATELY 2.02 MILES IN THE CITY OF ROSE BUD IN WHITE COUNTY. THIS PROJECT CONSISTS OF AGGREGATE SURFACE COURSE, RECONSTRUCTED BASE COURSE, ACHM SURFACE AND BINDER COURSES, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, AND MISC. ITEMS. Let by Arkansas DOT on January 15, 2025, Faulkner, Van Buren, White. 2 bids received; low bid $764,580 by Rogers Group, Inc..
- Owner
- Arkansas DOT
- Letting
- 15 JAN 2025
- Pay items
- 15
- Data through
- 04 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rogers Group, Inc. | $764,580 | Low |
| 2 | CK Asphalt, LLC | $884,585 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rogers Group, Inc. | 2. CK Asphalt, LLC |
|---|---|---|---|---|---|
| 0001 | Removal and disposal of pipe culverts (202096) | EACH | 2 | $1,500.00 | $450.00 |
| 0002 | Trenching and shoulder preparation (215001) | STA | 19 | $160.00 | $225.00 |
| 0003 | Aggregate surface course (class D-8) (303308) | TON | 386 | $45.00 | $28.65 |
| 0004 | Reconstructed base course (305011) | STA | 17 | $275.00 | $275.00 |
| 0005 | Tack coat (401011) | GAL | 5,369 | $1.00 | $3.00 |
| 0006 | Mineral aggregate in achm binder course (1") (406161) | TON | 254 | $75.00 | $89.62 |
| 0007 | Asphalt binder (PG 64-22) in achm binder course (1") (minimum bid $120.00) (406402) | TON | 12 | $590.00 | $120.00 |
| 0008 | Mineral aggregate in achm surface course (3/8") (407161) | TON | 5,940 | $55.00 | $28.00 |
| 0009 | Asphalt binder (PG 64-22) in achm surface course (3/8") (minimum bid $120.00) (407431) | TON | 406 | $590.00 | $1,400.00 |
| 0010 | Cold milling asphalt pavement (412001) | SY | 385 | $10.00 | $6.40 |
| 0011 | Achm patching of existing roadway (415011) | TON | 225 | $170.00 | $155.00 |
| 0012 | Mobilization (unit bid amount may not exceed 5% of subtotal) (601001) | LS | 1 | $34,000 | $32,000 |
| 0013 | Maintenance of traffic (603009) | LS | 1 | $50,000 | $11,500 |
| 0014 | Signs (604003) | SF | 600 | $12.00 | $8.00 |
| 0015 | 12" side drain (606701) | LF | 62 | $88.00 | $48.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ARDOT's tabulation for this contract. ARDOT monthly bid tab PDFs (morning and afternoon sessions), January 2022 to November 2026. Base bids are printed in whole dollars; on A+B and A+C jobs the base bid is kept, and the published rank follows the award amount.
Every contract let that day: ARDOT letting of January 15, 2025. Compiled by Mirage Metrics.