CDOT contract C26874 bid tabulation

REGION 3 STENCIL PROJECT ON HIGHWAYS 40, 394,13. This Project will consist of refreshing existing crosswalks, stop bars and pavement markings with inlaid preformed thermoplastic material on the following Highways: 040A 130.29, 394A . 24-.71, 013A 0 - 64.16. Project Engineer: Kaleb Baugh 970-683-7530. Let by Colorado DOT on July 3, 2025, Region 3. 2 bids received; low bid $448,563 by Roadsafe Traffic Systems, Inc, -10% against the engineer's estimate of $499,196.

Owner
Colorado DOT
Letting
03 JUL 2025
Pay items
10
Data through
10 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Roadsafe Traffic Systems, Inc$448,563Low-10%
2Branson Traffic Control Company, Inc$458,738+2.0%-8.0%
CDOT contract C26874: bids by rank

Engineer's estimate: $499,196.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Roadsafe Traffic Systems, Inc2. Branson Traffic Control Company, Inc
1Removal of pavement marking (202-00250)SF27,454.80$2.00$1.75$2.00
2Mobilization (626-00000)LS1$35,000$25,000$20,000
3Preformed thermoplastic pavement marking (word-symbol) (special) (627-30407)SF7,123.40$16.50$16.75$17.25
4Preformed thermoplastic pavement marking (xwalk-stop line) (special) (627-30411)SF19,900$13.00$12.25$12.50
5Flagging (630-00000)HR300$14.00$13.00$5.00
6Traffic control management (630-00012)DAY45$500.00$125.00$200.00
7Construction traffic sign (panel size A) (630-80341)EACH21$50.00$25.00$25.00
8Construction traffic sign (panel size B) (630-80342)EACH15$60.00$25.00$25.00
9Advance warning flashing or sequencing arrow panel (C type) (630-80358)EACH2$1,200.00$500.00$300.00
10Traffic cone (630-80380)EACH200$10.00$5.00$1.00
CDOT contract C26874: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.

Every contract let that day: CDOT letting of July 3, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy