Roadsafe Traffic Systems, Inc: CDOT bid record
Roadsafe Traffic Systems, Inc submitted 13 bids on Colorado DOT contracts in the data, from 16 MAY 2024 to 03 JUL 2025, and was the low bidder on 9 of them (69%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Colorado DOT
- Low bid volume
- $27,665,104
- Latest bid
- 03 JUL 2025
- Data through
- 10 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 7 | 6 | 86% |
| 2025 | 6 | 3 | 50% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 2 | 5 | 5 | 100% |
| Region 3 | 4 | 3 | 75% |
| Region 4 | 2 | 0 | 0% |
| Region 1 | 1 | 1 | 100% |
| Region 5 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Traffic control management | 630-00012 | DAY | 7 | 5 (71%) | $200.00 | $1,500.00 |
| Flagging | 630-00000 | HR | 7 | 4 (57%) | $13.00 | $48.00 |
| Removal of pavement marking | 202-00250 | SF | 7 | 4 (57%) | $1.75 | $3.28 |
| Advance warning flashing or sequencing arrow panel (C type) | 630-80358 | EACH | 7 | 3 (43%) | $500.00 | $1,830.00 |
| Construction traffic sign (panel size B) | 630-80342 | EACH | 6 | 3 (50%) | $20.00 | $66.50 |
| Traffic cone | 630-80380 | EACH | 7 | 2 (29%) | $5.00 | $13.00 |
| Construction traffic sign (panel size A) | 630-80341 | EACH | 6 | 2 (33%) | $20.00 | $55.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Branson Traffic Control Company, Inc | 4 | 0 of 4 |
| Streamline Markings, Inc | 4 | 3 of 4 |
| Kolbe Striping Incorporated | 2 | 0 of 2 |
| Workzone Traffic Control, LLC | 2 | 1 of 2 |
| Barricade Holdings LLC | 2 | 0 of 2 |
| The Tendit Group, LLC | 1 | 1 of 1 |
| CC Enterprises - Traffic Control Specialists, Inc. | 1 | 0 of 1 |
| Structures, Inc. | 1 | 0 of 1 |
| Straight Stripe Painting, Inc. | 1 | 0 of 1 |
| S & L Industrial | 1 | 0 of 1 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 03 JUL 2025 | C26874 | Region 3 | REGION 3 STENCIL PROJECT ON HIGHWAYS 40, 394,13. This Project will consist of refreshing existing crosswalks, stop bars and pavement marking | 1 of 2 | $448,563 | Low, 2.0% under the second |
| 26 JUN 2025 | C26803 | Region 2 | R2 VARIOUS HIGHWAYS AND COUTNIES | 1 of 1 | $3,546,944 | Low |
| 05 JUN 2025 | C26757 | Region 4 | This project will remove and replace ground mounted signs on US-36 from Estes Park to Boulder. | 2 of 4 | $1,093,529 | +18% |
| 08 MAY 2025 | C26920 | Region 3 | This is a region wide epoxy striping project. Work consists of longitudinal pavement marking removal and installation of inlaid modified epo | 2 of 2 | $2,399,017 | +20% |
| 13 MAR 2025 | C26481 | Region 2 | This project is located in Region 2 in El Paso, Park, Pueblo, and Teller Counties. Project work consists of rumble strip installation and pa | 1 of 2 | $993,522 | Low, 14% under the second |
| 06 MAR 2025 | C26804 | Region 5 | REGION 5 - REGION WIDE STRIPING | 2 of 6 | $1,982,147 | +8.0% |
| 24 OCT 2024 | C26270R | Region 2 | This project is located in Region 2 in various counties. Project work consists of removal and replacement of signs along US 24 between Divid | 1 of 5 | $1,848,479 | Low, 3.0% under the second |
| 24 OCT 2024 | C26357 | Region 2 | R2 VARIOUS HIGHWAYS AND COUNTIES | 1 of 3 | $497,230 | Low, 10% under the second |
| 03 OCT 2024 | C26352 | Region 4 | This project will remove and replace modified epoxy pavement markings on various highways across Region 4. | 3 of 3 | $3,245,087 | +12% |
| 18 JUL 2024 | C26244 | Region 2 | R2 VARIOUS HIGHWAYS AND COUNTIES | 1 of 1 | $2,493,062 | Low |
| 11 JUL 2024 | C26355 | Region 3 | This is a Region Wide epoxy striping project. Work consists of longitudinal pavement marking removal and installation of inlaid modified epo | 1 of 1 | $1,674,070 | Low |
| 06 JUN 2024 | C26343 | Region 3 | REGION 3 STENCILS ON HIGHWAYS 050A, 040A, 135A, 064A, 040Z, 131B. This project will consist of refreshing existing Crosswalks, Stop bars and | 1 of 3 | $443,963 | Low, 14% under the second |
| 16 MAY 2024 | C26275 | Region 1 | THIS PROJECT REPLACES PAVEMENT MARKINGS IN REGION 1. INST ALLS 6 INCH LANE LINES AND EDGE LINES ON THE DESIGNATED ROADWAYS IN REGION 1. ALSO | 1 of 1 | $15,719,271 | Low |
How this record was read
CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; CDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.