CDOT letting results, July 11, 2024
7 contracts let by Colorado DOT on July 11, 2024, $15,196,470 in low bids, a median of 3 bidders per contract. On the 7 with an engineer's estimate, the low bid came in under it 6 times; median low bid -18% against the estimate.
- Owner
- Colorado DOT
- Contracts
- 7
- Low bids, total
- $15,196,470
- Data through
- 10 SEP 2026
Contracts let that day
| Contract | Project | Region | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| C25561 | Bridge Preventative Maintenance project on seven structures along I-76 & I-225 within Adams and Arapahoe counties. The project consists of removal and replaceme | Region 1 | 2 | Abco Contracting, Inc. | $7,438,813 | $7,563,838 | +2.0% | -5.0% | CDOT |
| C25140 | This project will be doing a full-depth replacement of the pavement of the NB chain area where trucks will be entering to de-chain only when chain law is in eff | Region 1 | 5 | Capital Paving & Construction, LLC | $2,545,678 | $2,569,728 | +1.0% | -18% | CDOT |
| C24017 | US 36 GUARDRAIL MP 12.9 TO 16.1 | Region 4 | 3 | Rodriguez Construction Org., LLC | $1,716,817 | $1,743,369 | +2.0% | -3.0% | CDOT |
| C26355 | This is a Region Wide epoxy striping project. Work consists of longitudinal pavement marking removal and installation of inlaid modified epoxy pavement markings | Region 3 | 1 | Roadsafe Traffic Systems, Inc | $1,674,070 | 0.0% | CDOT | ||
| C25602 | Project will replace signal poles, mast arms, and signal equipment at two intersections in Loveland: US 34 & N Van Buren Ave and CO 402 & South Boise Ave. Proje | Region 4 | 5 | Morton Electric, Inc. | $802,143 | $912,773 | +14% | -35% | CDOT |
| C26262 | I25 FRONTAGE ROAD MP 254-270 LARIMER COUNTY | Region 4 | 3 | Coulson Excavating Company, Inc. | $513,949 | $574,612 | +12% | -25% | CDOT |
| C26328 | REGION 3 HOT POUR CRACK SEAL I70 MP 190 TO MP 195.26 SUMMIT COUNTY | Region 3 | 3 | KSK, LLC | $505,000 | $565,130 | +12% | -22% | CDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than CDOT received, the others did not match their published totals and are left out.