Rodriguez Construction Org., LLC: CDOT bid record

Rodriguez Construction Org., LLC submitted 13 bids on Colorado DOT contracts in the data, from 16 MAY 2024 to 10 SEP 2026, and was the low bidder on 2 of them (15%). When it was not low, its total sat a median +36% above the low bid.

Owner
Colorado DOT
Low bid volume
$4,976,501
Latest bid
10 SEP 2026
Data through
10 SEP 2026
13Bids
2Low bids
15Win rate, percent
+36%Median gap to the low bid when not low, 11 bids

By year

YearBidsLow bidsWin rate
20241119%
202511100%
2026100%
Rodriguez Construction Org., LLC, CDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 47229%
Region 1600%
Rodriguez Construction Org., LLC, CDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Removal of ground sign202-00810EACH64 (67%)$200.00$210.00
Traffic control management630-00012DAY133 (23%)$1,625.00$1,500.00
Modified epoxy pavement marking627-00008GAL93 (33%)$290.00$205.75
Field office (class 2)620-00002EACH53 (60%)$45,000$57,203
Traffic control inspection630-00007DAY132 (15%)$350.00$350.00
Sanitary facility620-00020EACH122 (17%)$5,000.00$4,760.00
Preformed thermoplastic pavement marking (xwalk-stop line)627-30410SF92 (22%)$25.00$20.00
Pre-fabricated vehicle tracking pad208-00075EACH72 (29%)$7,000.00$6,000.00
Hot mix asphalt (patching) (asphalt)403-00720TON52 (40%)$315.00$350.00
Reset ground sign210-00810EACH52 (40%)$500.00$529.14
Spray-on mulch blanket213-00012ACRE52 (40%)$7,300.00$5,640.00
End anchorage (nonflared)606-02003EACH52 (40%)$5,200.00$4,500.00
Rodriguez Construction Org., LLC, CDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Jalisco International, Inc.55 of 5
Martin Marietta Materials, Inc.33 of 3
Myers & Sons Construction, LLC32 of 3
HCG Construction LLC21 of 2
Morton Electric, Inc.22 of 2
Structures, Inc.21 of 2
Kiewit Infrastructure Co.22 of 2
Kraemer North America, LLC11 of 1
Capital Paving & Construction, LLC11 of 1
Ideal Fencing Corporation LLC10 of 1
Rodriguez Construction Org., LLC, CDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
10 SEP 2026C27164Region 1SH053A, SH095A, SH287C4 of 8$1,167,182+26%
27 FEB 2025C25860Region 4This project is located in Region 4 in Weld County and Morgan Counties. The project consists of bridge preventative maintenance of structure1 of 6$3,259,684Low, 11% under the second
19 DEC 2024C19934Region 1US85 SANTA FE FLORIDA TO I-256 of 6$4,465,974+35%
21 NOV 2024C25250Region 1SH 7 AND AIRPORT DR INTERSECTION4 of 4$5,377,482+28%
21 NOV 2024C25334Region 4RAILROAD AND ROADWAY IMPROVEMENTS AT CR U AND CR 31 NEAR BRUSH IN MORGAN COUNTY. WORK CONSISTS OF REPLACING AT-GRADE CROSSINGS AND SURFACE I2 of 2$1,397,091+37%
26 SEP 2024C26438Region 1I-270 YORK BRIDGE PREVENTATIVE MAINTENANCE Resident Engineer - Chris Cameron - (720) 505-6226 - chris.cameron@state.co.us5 of 5$1,481,853+89%
12 SEP 2024C26259Region 4US 287 MP 354.71 TO MP 355.704 of 4$3,005,910+70%
29 AUG 2024C19164Region 4US 34 & US 85 INTERCHANGE IN GREELEY6 of 6$3,540,211+36%
11 JUL 2024C24017Region 4US 36 GUARDRAIL MP 12.9 TO 16.11 of 3$1,716,817Low, 2.0% under the second
11 JUL 2024C25602Region 4Project will replace signal poles, mast arms, and signal equipment at two intersections in Loveland: US 34 & N Van Buren Ave and CO 402 & So5 of 5$1,348,955+68%
11 JUL 2024C26262Region 4I25 FRONTAGE ROAD MP 254-270 LARIMER COUNTY3 of 3$974,786+90%
06 JUN 2024C24921Region 1FEDERAL BLVD (SH 287C): FROM 92ND AVE TO 105TH AVE3 of 3$3,898,085+35%
16 MAY 2024C25071Region 1NEW CONSTRUCTION OF PARKING LOT; HWY 40, I-70 INTERCHANGE (EL RANCHO WEST) EAST OF ON-RAMP3 of 3$4,566,597+12%
Rodriguez Construction Org., LLC: latest CDOT bids in the data

How this record was read

CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; CDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy