Rodriguez Construction Org., LLC: CDOT bid record
Rodriguez Construction Org., LLC submitted 13 bids on Colorado DOT contracts in the data, from 16 MAY 2024 to 10 SEP 2026, and was the low bidder on 2 of them (15%). When it was not low, its total sat a median +36% above the low bid.
- Owner
- Colorado DOT
- Low bid volume
- $4,976,501
- Latest bid
- 10 SEP 2026
- Data through
- 10 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 11 | 1 | 9% |
| 2025 | 1 | 1 | 100% |
| 2026 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 4 | 7 | 2 | 29% |
| Region 1 | 6 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Removal of ground sign | 202-00810 | EACH | 6 | 4 (67%) | $200.00 | $210.00 |
| Traffic control management | 630-00012 | DAY | 13 | 3 (23%) | $1,625.00 | $1,500.00 |
| Modified epoxy pavement marking | 627-00008 | GAL | 9 | 3 (33%) | $290.00 | $205.75 |
| Field office (class 2) | 620-00002 | EACH | 5 | 3 (60%) | $45,000 | $57,203 |
| Traffic control inspection | 630-00007 | DAY | 13 | 2 (15%) | $350.00 | $350.00 |
| Sanitary facility | 620-00020 | EACH | 12 | 2 (17%) | $5,000.00 | $4,760.00 |
| Preformed thermoplastic pavement marking (xwalk-stop line) | 627-30410 | SF | 9 | 2 (22%) | $25.00 | $20.00 |
| Pre-fabricated vehicle tracking pad | 208-00075 | EACH | 7 | 2 (29%) | $7,000.00 | $6,000.00 |
| Hot mix asphalt (patching) (asphalt) | 403-00720 | TON | 5 | 2 (40%) | $315.00 | $350.00 |
| Reset ground sign | 210-00810 | EACH | 5 | 2 (40%) | $500.00 | $529.14 |
| Spray-on mulch blanket | 213-00012 | ACRE | 5 | 2 (40%) | $7,300.00 | $5,640.00 |
| End anchorage (nonflared) | 606-02003 | EACH | 5 | 2 (40%) | $5,200.00 | $4,500.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Jalisco International, Inc. | 5 | 5 of 5 |
| Martin Marietta Materials, Inc. | 3 | 3 of 3 |
| Myers & Sons Construction, LLC | 3 | 2 of 3 |
| HCG Construction LLC | 2 | 1 of 2 |
| Morton Electric, Inc. | 2 | 2 of 2 |
| Structures, Inc. | 2 | 1 of 2 |
| Kiewit Infrastructure Co. | 2 | 2 of 2 |
| Kraemer North America, LLC | 1 | 1 of 1 |
| Capital Paving & Construction, LLC | 1 | 1 of 1 |
| Ideal Fencing Corporation LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 10 SEP 2026 | C27164 | Region 1 | SH053A, SH095A, SH287C | 4 of 8 | $1,167,182 | +26% |
| 27 FEB 2025 | C25860 | Region 4 | This project is located in Region 4 in Weld County and Morgan Counties. The project consists of bridge preventative maintenance of structure | 1 of 6 | $3,259,684 | Low, 11% under the second |
| 19 DEC 2024 | C19934 | Region 1 | US85 SANTA FE FLORIDA TO I-25 | 6 of 6 | $4,465,974 | +35% |
| 21 NOV 2024 | C25250 | Region 1 | SH 7 AND AIRPORT DR INTERSECTION | 4 of 4 | $5,377,482 | +28% |
| 21 NOV 2024 | C25334 | Region 4 | RAILROAD AND ROADWAY IMPROVEMENTS AT CR U AND CR 31 NEAR BRUSH IN MORGAN COUNTY. WORK CONSISTS OF REPLACING AT-GRADE CROSSINGS AND SURFACE I | 2 of 2 | $1,397,091 | +37% |
| 26 SEP 2024 | C26438 | Region 1 | I-270 YORK BRIDGE PREVENTATIVE MAINTENANCE Resident Engineer - Chris Cameron - (720) 505-6226 - chris.cameron@state.co.us | 5 of 5 | $1,481,853 | +89% |
| 12 SEP 2024 | C26259 | Region 4 | US 287 MP 354.71 TO MP 355.70 | 4 of 4 | $3,005,910 | +70% |
| 29 AUG 2024 | C19164 | Region 4 | US 34 & US 85 INTERCHANGE IN GREELEY | 6 of 6 | $3,540,211 | +36% |
| 11 JUL 2024 | C24017 | Region 4 | US 36 GUARDRAIL MP 12.9 TO 16.1 | 1 of 3 | $1,716,817 | Low, 2.0% under the second |
| 11 JUL 2024 | C25602 | Region 4 | Project will replace signal poles, mast arms, and signal equipment at two intersections in Loveland: US 34 & N Van Buren Ave and CO 402 & So | 5 of 5 | $1,348,955 | +68% |
| 11 JUL 2024 | C26262 | Region 4 | I25 FRONTAGE ROAD MP 254-270 LARIMER COUNTY | 3 of 3 | $974,786 | +90% |
| 06 JUN 2024 | C24921 | Region 1 | FEDERAL BLVD (SH 287C): FROM 92ND AVE TO 105TH AVE | 3 of 3 | $3,898,085 | +35% |
| 16 MAY 2024 | C25071 | Region 1 | NEW CONSTRUCTION OF PARKING LOT; HWY 40, I-70 INTERCHANGE (EL RANCHO WEST) EAST OF ON-RAMP | 3 of 3 | $4,566,597 | +12% |
How this record was read
CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; CDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.