Myers & Sons Construction, LLC: CDOT bid record
Myers & Sons Construction, LLC submitted 26 bids on Colorado DOT contracts in the data, from 11 JUL 2024 to 18 DEC 2025, and was the low bidder on 5 of them (19%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Colorado DOT
- Low bid volume
- $17,395,548
- Latest bid
- 18 DEC 2025
- Data through
- 10 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 11 | 2 | 18% |
| 2025 | 15 | 3 | 20% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 1 | 9 | 2 | 22% |
| Region 4 | 6 | 0 | 0% |
| Region 5 | 4 | 2 | 50% |
| Region 2 | 3 | 1 | 33% |
| Region 3 | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Traffic control inspection | 630-00007 | DAY | 25 | 14 (56%) | $361.00 | $350.00 |
| Aggregate bag | 208-00035 | LF | 22 | 14 (64%) | $11.00 | $12.75 |
| Drum channelizing device | 630-80360 | EACH | 24 | 13 (54%) | $42.50 | $44.00 |
| Flagging | 630-00000 | HR | 22 | 13 (59%) | $39.50 | $48.00 |
| Construction traffic sign (panel size A) | 630-80341 | EACH | 25 | 12 (48%) | $50.00 | $55.00 |
| Traffic cone | 630-80380 | EACH | 23 | 12 (52%) | $15.00 | $13.00 |
| Removal and disposal of sediment (labor) | 208-00103 | HR | 19 | 12 (63%) | $45.00 | $79.50 |
| Traffic control management | 630-00012 | DAY | 26 | 11 (42%) | $1,400.00 | $1,500.00 |
| Construction traffic sign (panel size B) | 630-80342 | EACH | 23 | 10 (43%) | $70.00 | $66.50 |
| Portable message sign panel | 630-80355 | EACH | 22 | 10 (45%) | $6,000.00 | $6,713.65 |
| Removal of trash | 208-00107 | HR | 18 | 10 (56%) | $50.00 | $115.00 |
| Removal of nests | 240-00010 | HR | 16 | 9 (56%) | $152.50 | $212.01 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Structures, Inc. | 15 | 9 of 15 |
| Abco Contracting, Inc. | 12 | 7 of 12 |
| Lobato Construction, LLC | 6 | 4 of 6 |
| Jalisco International, Inc. | 5 | 3 of 5 |
| Native Sun Materials Inc | 4 | 2 of 4 |
| FNF Construction, Inc. | 4 | 2 of 4 |
| Ralph L. Wadsworth Construction Company, LLC. | 4 | 2 of 4 |
| W.W. Clyde & Co. | 4 | 1 of 4 |
| TLM Constructors, Inc. | 4 | 3 of 4 |
| Rodriguez Construction Org., LLC | 3 | 1 of 3 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 DEC 2025 | C26274 | This is bridge replacement project near hayden, colorado in routt county along us 40 at mp 108.35. the work includes water control, a tempor | 4 of 5 | $2,869,068 | +18% | |
| 18 SEP 2025 | C25393 | Region 2 | WIDENING AND RESURFACING OF I-25C FROM THE INTERSECTION WITH PINE STREET TO JUST BEFORE THE STRUCTURE N-17-BV OVER THE PICTOUR ARROYO. | 7 of 8 | $8,373,321 | +40% |
| 21 AUG 2025 | C26065 | Region 1 | I-70 AND PENA BLVD OVERPASS | 1 of 5 | $818,182 | Low, 7.0% under the second |
| 21 AUG 2025 | C26632 | Region 4 | Remove and replace bridge rail on SH157 MP3.518 D-16-DG AND I70 MP329.74 F-20-BF Remove and replace adjacent guardrail, remove and replace s | 2 of 4 | $647,466 | +6.0% |
| 24 JUL 2025 | C26934combo | Region 1 | Bridge Repairs on east I-70 in Arapahoe County, near Deer Trail. Work includes repairs of bridge decks at four structures, including hydrode | 3 of 4 | $8,474,743 | +17% |
| 12 JUN 2025 | C26058 | Region 3 | SEE 'PROJECT SPECIAL - NOTICE TO BIDDERS' FOR PRE-BID MEETING INFORMATION. SH50A CEDAR CREEK CULVERT REPLACE -Replacement of existing arched | 4 of 4 | $6,421,923 | +28% |
| 05 JUN 2025 | C25575 | Region 1 | US 40 IN DEER TRAIL, PINE ST TO BURTON ST | 1 of 5 | $672,753 | Low, 3.0% under the second |
| 22 MAY 2025 | C26607 | Region 1 | This project is located in Region 1 in Arapahoe County. Project work consists of milling, waterproofing membrane, paving, remove and replace | 3 of 3 | $3,729,848 | +34% |
| 01 MAY 2025 | C25564 | Region 5 | Three timber structures throughout Region 5 will be rehabilitated by installing HSS members adjacent to existing timber stringers. The three | 3 of 4 | $1,103,655 | +15% |
| 28 FEB 2025 | C26678 | Region 5 | SH 141 MP 85.5 K-01-B BRIDGE REPAIR | 1 of 4 | $2,088,197 | Low, 28% under the second |
| 27 FEB 2025 | C25860 | Region 4 | This project is located in Region 4 in Weld County and Morgan Counties. The project consists of bridge preventative maintenance of structure | 2 of 6 | $3,631,310 | +11% |
| 06 FEB 2025 | C25624 | Region 1 | The R1 Expansion Joint Repairs at Railroads project includes the removal and replacement of expansion devices, joint repairs, deck repairs, | 3 of 4 | $2,903,428 | +8.0% |
| 30 JAN 2025 | C25603 | Region 3 | THIS PROJECT IS LOCATED ALONG I-70 THROUGH GLENWOOD CANYON IN GARFIELD AND EAGLE COUNTIES. THE WORK INCLUDES BRIDGE JOINT REPLACEMENTS. | 5 of 5 | $10,641,949 | +69% |
| 16 JAN 2025 | C24278 | Region 1 | I-25 Mobility Hub in the City of Lone Tree, Douglas County. Work includes a pedestrian bridge, ramp modifications to accommodate CDOT's Bust | 3 of 6 | $17,655,382 | +7.0% |
| 16 JAN 2025 | C25972 | Region 2 | Timber bridge retrofit project on 21 structures located in CDOT Region 2 on CO 9B, US 24A, US 24G, CO 67C, AND US 285D. | 3 of 7 | $2,269,053 | +26% |
| 19 DEC 2024 | C18808 | Region 4 | Located on US 85 Business (8th Ave) in Greeley from MP 0.328 to MP 1.990. This project will primarily consist of concrete slab replacement. | 3 of 6 | $5,475,411 | +4.0% |
| 19 DEC 2024 | C24618 | Region 5 | Project 24618 US 160D Mancos Pedestrian Improvements is an ADA curb ramp and sidewalk installation project. The project proposes replacement | 2 of 2 | $2,684,265 | +24% |
| 21 NOV 2024 | C25058 | Region 4 | THIS PROJECT IS A BRIDGE PREVENTATIVE MAINTENANCE PROJECT OF 10 STRUCTURES IN REGION 4. STRUCTURES G-22-BD AND G-22-BE ON I-70 WILL RECIEVE | 2 of 4 | $5,774,116 | +11% |
| 21 NOV 2024 | C25644 | Region 3 | THIS ROCKFALL MITIGATION PROJECT WILL BE ALONG SH 82 IN GARFIELD COUNTY. THE ROCKFALL MITIFAITON WORK WILL BE PREFORMED EAST OF THE SH 133 A | 6 of 7 | $2,399,257 | +51% |
| 14 NOV 2024 | C24605 | Region 5 | US 550 WALL REPLACEMENT AT MP 56.7 & ROCKFALL MITIGATION AT DEER CREEK MP 59.3 | 1 of 4 | $3,486,781 | Low, 20% under the second |
| 24 OCT 2024 | C24809 | Region 1 | I25 AT MP 165.4 - NEW BRIDGE CONSTRUCTION OF WILDLIFE OVERPASS INCLUDING BRIDGE CONSTRUCTION, RETAINING WALLS, TEMPORARY EROSION CONTROL, SE | 8 of 8 | $18,372,081 | +24% |
| 17 OCT 2024 | C22529-COMBO | Region 4 | THIS PROJECT CONSISTS OF THE REMOVAL AND REPLACEMENT OF FIVE SEPARATE BRIDGE LOCATIONS IN AND AROUND HOLYOKE. THREE OF THE STRUCTURES WILL B | 7 of 9 | $21,327,291 | +12% |
| 26 SEP 2024 | C26438 | Region 1 | I-270 YORK BRIDGE PREVENTATIVE MAINTENANCE Resident Engineer - Chris Cameron - (720) 505-6226 - chris.cameron@state.co.us | 4 of 5 | $1,264,995 | +61% |
| 29 AUG 2024 | C19164 | Region 4 | US 34 & US 85 INTERCHANGE IN GREELEY | 5 of 6 | $3,506,600 | +35% |
| 01 AUG 2024 | C25921 | Region 2 | 050B LAS ANIMAS - BRIDGE STRUCTURE L-24-A / L-24-D MP 399.8 | 1 of 5 | $10,329,636 | Low, 5.0% under the second |
How this record was read
CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; CDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.