CDOT contract C25393 bid tabulation

WIDENING AND RESURFACING OF I-25C FROM THE INTERSECTION WITH PINE STREET TO JUST BEFORE THE STRUCTURE N-17-BV OVER THE PICTOUR ARROYO. Let by Colorado DOT on September 18, 2025, Huerfano, Region 2. 8 bids received; low bid $5,987,513 by Siete, Inc., -11% against the engineer's estimate of $6,700,000.

Owner
Colorado DOT
Letting
18 SEP 2025
Pay items
125
Data through
10 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Siete, Inc.$5,987,513Low-11%
2Capital Paving & Construction, LLC$6,970,129+16%+4.0%
3Castle Rock Construction Company of Colorado, LLC$7,011,137+17%+5.0%
4Native Sun Materials Inc$7,096,187+19%+6.0%
5Oldcastle SW Group, Inc.$7,474,627+25%+12%
6TLM Constructors, Inc.$7,736,339+29%+15%
7Myers & Sons Construction, LLC$8,373,321+40%+25%
8Walsenburg Sand and Gravel Company$11,080,089+85%+65%
CDOT contract C25393: bids by rank

Engineer's estimate: $6,700,000.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Siete, Inc.2. Capital Paving & Construction, LLC3. Castle Rock Construction Company of Colorado, LLC4. Native Sun Materials Inc5. Oldcastle SW Group, Inc.6. TLM Constructors, Inc.
1Clearing and grubbing (201-00000)LS1$60,000$70,000$79,330$90,675$42,234$92,000$50,000
2Removal of tree (202-00010)EACH55$546.35$750.00$750.00$630.33$891.00$1,300.00$1,000.00
3Removal of ditch lining (202-00025)LF300$18.65$20.00$18.00$13.34$34.95$9.00$15.00
4Removal of delineator (202-00090)EACH30$15.37$15.00$12.50$97.29$11.88$10.60$16.00
5Removal of wall (202-00150)EACH4$2,021.93$5,000.00$1,535.00$747.50$3,523.32$800.00$750.00
6Removal of sidewalk (202-00200)SY15$53.33$40.00$51.50$40.25$75.95$35.00$30.00
7Removal of curb and gutter (202-00203)LF95$36.04$15.00$19.50$18.40$11.39$23.00$20.00
8Removal of asphalt mat (202-00220)SY1,235$49.88$15.00$51.00$17.57$16.23$18.00$15.00
9Removal of asphalt mat (planing) (202-00240)SY14,369$9.07$3.00$3.80$2.80$6.22$3.00$5.00
10Removal of pavement marking (202-00250)SF577$1.73$3.00$3.10$6.90$7.13$0.10$5.50
11Removal of light standard (202-00700)EACH16$663.43$525.00$671.00$621.00$1,158.30$580.00$630.00
12Removal of light standard foundation (202-00705)EACH16$463.50$850.00$1,095.00$1,012.00$1,663.20$920.00$1,025.00
13Removal of power pole (202-00710)EACH2$783.80$575.00$733.00$678.50$1,146.42$615.00$675.00
14Removal of ground sign (202-00810)EACH16$135.64$100.00$108.00$198.14$100.98$160.00$100.00
15Removal of sign panel (202-00821)EACH4$87.01$75.00$82.50$86.25$77.22$212.00$100.00
16Removal of pull box (202-00827)EACH2$251.73$720.00$925.00$855.60$451.44$800.00$900.00
17Removal of fence (202-01000)LF6,515$1.24$3.00$2.20$1.32$2.08$2.10$2.00
18Removal of guardrail type 3 (202-01130)LF1,075$7.82$5.00$6.20$3.05$5.94$8.00$6.00
19Removal of end anchorage (202-01300)EACH2$531.50$500.00$618.00$281.75$594.00$500.00$600.00
20Clean culvert (202-04002)EACH1$2,916.99$3,500.00$8,205.00$21,160$4,158.00$4,200.00$5,250.00
21Embankment material (complete in place) (203-00060)CY32,798$25.85$35.50$31.00$24.41$20.19$41.00$31.00
22Blading (203-01500)HR40$247.29$170.00$143.00$125.00$346.50$220.00$160.00
23Dozing (203-01550)HR40$189.02$170.00$172.00$125.00$346.50$248.00$185.00
24Potholing (203-01597)HR40$350.31$250.00$297.00$683.10$570.90$420.00$355.00
25Structure excavation (206-00000)CY225$60.67$50.00$87.00$125.46$15.30$40.00$38.00
26Structure backfill (flow-fill) (206-00065)CY21$429.98$300.00$720.00$384.20$322.90$450.00$475.00
27Structure backfill (class 1) (206-00100)CY119$90.98$70.00$220.00$243.53$68.80$91.00$85.00
28Topsoil (onsite) (207-00700)CY10,252$16.66$5.00$6.70$4.56$5.10$26.00$25.00
29Subgrade soil preparation (207-00704)SY11,000$1.94$1.00$0.95$0.63$3.14$3.45$2.00
30Erosion log type 1 (12 inch) (208-00002)LF1,000$6.76$9.00$6.70$6.27$7.96$6.50$6.25
31Erosion bales (weed free) (208-00011)EACH20$26.02$40.00$50.00$120.75$21.38$32.50$45.00
32Silt fence (208-00020)LF7,500$3.53$3.00$1.60$1.90$2.38$3.10$2.75
33Pre-fabricated concrete washout structure (type 1) (208-00046)EACH1$3,362.41$5,000.00$5,025.00$8,625.00$5,346.00$4,750.00$5,000.00
34Pre-fabricated vehicle tracking pad (208-00075)EACH6$3,102.56$5,000.00$8,395.00$1,000.00$8,910.00$6,000.00$5,000.00
35Removal and disposal of sediment (labor) (208-00103)HR40$65.12$40.00$49.50$86.25$220.00$57.00$62.00
36Removal and disposal of sediment (equipment) (208-00105)HR40$143.95$110.00$152.00$172.50$275.00$165.00$175.00
37Sweeping (sediment removal) (208-00106)HR40$168.15$110.00$208.00$316.25$330.00$380.00$225.00
38Removal of trash (208-00107)HR20$97.51$70.00$117.00$86.25$203.50$125.00$250.00
39Erosion control management (208-00207)DAY150$442.64$250.00$51.00$402.50$534.60$56.00$450.00
40Reset sign panel (210-00815)EACH4$408.85$75.00$82.50$86.25$77.22$69.00$100.00
41Adjust manhole (210-04010)EACH1$1,200.00$1,800.00$1,835.00$3,220.00$2,891.39$3,000.00$2,000.00
42Adjust valve box (210-04050)EACH4$600.00$500.00$735.00$143.75$1,734.82$130.00$565.00
43Organic fertilizer (212-00700)LB3,360$1.75$0.35$0.45$2.01$2.79$2.35$0.40
44Humate (212-00703)LB1,680$2.40$0.45$0.55$1.55$3.56$3.00$0.50
45Mycorrhizae (212-00704)LB89.60$29.61$10.00$12.00$21.51$12.46$10.50$11.00
46Seeding (native) drill (212-00706)ACRE11.20$1,461.11$1,300.00$1,630.00$1,690.50$1,645.38$1,385.00$1,525.00
47Mulching (weed free straw) (213-00004)ACRE11.20$622.98$1,150.00$1,445.00$1,311.00$1,948.32$1,640.00$1,350.00
48Mulch tackifier (213-00061)LB19,500$2.12$2.75$3.20$2.19$2.91$2.45$3.00
49Bonded fiber matrix (213-00150)ACRE1$6,726.48$3,800.00$4,765.00$4,847.25$7,009.20$5,900.00$4,450.00
50Soil retention blanket (straw-coconut) (biodegradable class 1) (216-00201)SY8,200$2.95$2.75$3.30$3.57$2.55$2.15$3.00
51Aggregate base course (class 6) (304-06007)CY3,205$63.93$38.00$84.50$59.93$88.35$55.50$78.00
52Hot mix asphalt (patching) (asphalt) (403-00720)TON121$300.59$200.00$244.00$258.75$267.30$225.00$245.00
53Hot mix asphalt (grading SX) (75) (PG 58- 28) 00 32 (403-34721)TON7,887.98$150.00$125.00$134.00$148.74$148.50$125.00$140.00
54Hot mix asphalt (grading SX) (75) (PG 76- 28) (403-34771)TON3,622.37$180.00$137.00$148.00$155.64$155.63$131.00$145.00
55Emulsified asphalt (slow-setting) (411-10255)GAL7,645$6.26$4.25$4.40$6.33$6.53$5.50$6.00
56Geotextile (drainage) (class 2) (420-00113)SY2,350$2.90$3.00$4.30$2.36$5.61$4.00$3.00
57Soil nail wall (504-06400)SF4,845$65.00$50.00$43.00$56.81$49.90$45.00$64.00
58Riprap (9 inch) (506-00209)CY650$151.00$115.00$188.00$114.99$136.30$196.00$195.00
59Concrete class D (box culvert) (601-03030)CY47.40$1,605.55$1,200.00$1,815.00$1,568.83$1,133.00$1,575.00$1,475.00
60Concrete class D (wall) (601-03050)CY92.60$917.23$1,100.00$1,620.00$1,136.20$1,133.00$1,050.00$1,220.00
61Structural concrete coating (601-40300)SY749$19.01$35.00$24.50$11.50$14.12$4.25$4.50
62Reinforcing steel (epoxy coated) (602-00020)LB16,400$3.14$1.75$2.80$2.01$3.47$2.00$2.00
6318 inch reinforced concrete pipe (complete in place) (603-01185)LF164$102.05$140.00$229.00$216.04$169.25$167.00$148.00
6424 inch reinforced concrete pipe (complete in place) (603-01245)LF150.50$326.58$180.00$271.00$296.07$227.27$193.00$177.00
6536 inch reinforced concrete pipe (complete in place) (603-01365)LF101.50$411.79$270.00$421.00$415.56$324.96$282.00$263.00
6618 inch reinforced concrete end section (603-05018)EACH6$3,149.62$2,000.00$2,800.00$2,709.06$3,186.81$1,270.00$2,000.00
6724 inch reinforced concrete end section (603-05024)EACH3$2,884.88$2,000.00$3,305.00$2,984.94$3,983.52$1,565.00$2,250.00
6836 inch reinforced concrete end section (603-05036)EACH2$1,467.57$2,500.00$5,620.00$4,554.47$4,709.52$3,445.00$3,500.00
6936 inch pipe safety end treatment (603-33036)EACH1$1,619.65$11,000$8,035.00$9,632.79$2,970.00$2,800.00$4,250.00
70Inlet type C (5 foot) (604-00305)EACH1$3,155.16$19,000$11,990$8,855.00$10,756$8,030.00$7,850.00
71Guardrail type 3 (31 inch midwest guardrail system) (606-00302)LF24$62.22$60.00$81.50$69.00$78.41$50.50$77.00
72Guardrail type 9 (style CD) (606-00930)LF895$150.00$220.00$160.00$166.75$180.82$220.00$205.00
73Transition type 3G (606-01370)EACH1$4,022.68$3,000.00$6,790.00$3,593.75$5,346.00$4,100.00$7,180.00
74Transition type GR9-GR3 (606-01372)EACH4$7,500.00$9,000.00$9,055.00$10,350$11,286$11,000$10,500
75Transition type 3J (606-01385)EACH1$1,269.11$2,250.00$2,880.00$2,587.50$2,768.04$2,020.00$2,700.00
76End anchorage type 3K (606-01390)EACH1$1,243.20$2,200.00$3,155.00$2,489.75$3,029.40$2,730.00$3,000.00
77End post (607-00005)EACH5$436.61$275.00$347.00$396.75$326.70$535.00$325.00
78Corner and line brace post (607-00010)EACH22$489.65$375.00$473.00$477.25$445.50$610.00$440.00
79Fence barbed wire with metal posts (607-01000)LF6,705$3.12$4.00$4.90$8.34$4.57$4.50$4.50
80Fence (plastic) (607-11525)LF2,000$3.76$4.50$2.50$3.39$0.59$2.80$4.00
81Concrete sidewalk (608-00000)SY220$115.29$110.00$116.00$144.90$98.85$155.00$120.00
82Concrete curb ramp (608-00010)SY38$218.68$250.00$324.00$270.25$261.21$410.00$285.00
83Curb and gutter type 2 (section II-B) (609-21020)LF360$38.16$40.00$67.50$51.75$32.38$68.00$52.00
84Gutter type 2 (4 foot) (609-24004)LF35$81.86$100.00$79.50$143.75$53.30$185.00$110.00
85Delineator (flexible) (type I) (612-00041)EACH40$119.81$90.00$108.00$103.50$100.98$58.00$100.00
86Delineator (flexible) (type III) (612-00043)EACH18$138.40$95.00$108.00$109.25$100.98$62.00$100.00
872 inch electrical conduit (613-00200)LF5,400$7.55$11.00$16.50$15.10$17.82$15.00$15.25
882 inch electrical conduit (bored) (613-00206)LF400$26.63$25.00$31.00$28.52$35.64$30.00$29.00
89Type two pull box (613-07002)EACH20$1,546.40$1,300.00$1,630.00$1,506.50$1,782.00$1,400.00$1,530.00
90Wiring (613-10000)LS1$150,000$38,000$47,030$43,516$60,588$50,000$44,000
91Luminaire (LED) (16,000 lumens) (613-13016)EACH20$1,067.70$900.00$1,165.00$1,079.85$1,128.60$1,000.00$1,100.00
92Light standard metal (40 foot) (613-34400)EACH20$2,220.77$5,000.00$5,885.00$5,446.70$5,464.80$5,000.00$5,500.00
93Light standard foundation (613-40010)EACH20$2,569.25$3,900.00$4,910.00$4,542.50$4,455.00$4,200.00$4,500.00
94Lighting control center (613-50100)EACH2$5,766.11$11,000$13,610$12,590$16,632$11,500$15,000
95Meter power pedestal (613-50109)EACH2$11,067$10,000$12,160$11,247$13,662$10,950$12,000
96Sign panel (class I) (614-00011)SF53$28.39$20.00$34.00$23.00$32.08$26.50$32.00
97Sign panel (class II) (614-00012)SF112$30.82$25.00$39.50$28.75$36.83$35.00$36.00
98Steel sign support (2-inch round)(post and socket) (614-01503)EACH3$419.55$500.00$507.00$575.00$475.20$292.00$465.00
99Steel sign support (2-1/2 inch round NP- 40)(post & slipbase) (614-01573)EACH11$664.07$600.00$887.00$690.00$831.60$550.00$800.00
100Impact attenuator (quadguard II) (614-85130)EACH3$22,602$25,000$36,470$34,480$29,148$38,000$31,000
101Field office (class 2) (620-00002)EACH1$22,255$33,000$57,790$93,717$31,458$70,000$48,000
102Field laboratory (class 2) (620-00012)EACH1$16,734$33,000$67,160$83,768$27,989$65,000$45,000
103Sanitary facility (620-00020)EACH1$5,065.18$8,000.00$24,990$6,000.00$12,607$12,000$4,000.00
104Construction surveying (625-00000)LS1$60,000$35,000$133,500$132,020$81,378$96,900$80,000
105Mobilization (626-00000)LS1$339,261$270,000$437,365$692,766$722,709$800,000$975,000
106Public information services (tier III) (626-01103)LS1$15,000$11,000$16,590$12,219$16,662$12,000$16,500
107Pavement marking paint (high build) (627-00013)GAL188$89.91$80.00$100.00$101.20$104.54$106.00$145.00
108Pavement marking paint (high build)(temporary) (627-00016)GAL198$100.00$80.00$100.00$161.00$166.32$185.00$145.00
109Preformed thermoplastic pavement marking (word-symbol) (627-30405)SF210$32.06$25.00$31.50$33.35$34.45$10.75$33.00
110Survey monument (type 1) (629-01001)EACH24$170.95$500.00$471.00$143.75$415.80$525.00$450.00
111Locate monuments (629-01110)HR60$198.03$250.00$196.00$115.00$297.00$250.00$180.00
112Flagging (630-00000)HR3,000$30.00$38.00$38.00$43.70$41.58$44.00$44.00
113Traffic control inspection (630-00007)DAY20$300.00$150.00$151.00$172.50$237.60$650.00$175.00
114Traffic control management (630-00012)DAY160$1,300.00$1,100.00$1,105.00$1,265.00$1,652.06$1,210.00$1,275.00
115Flashing beacon (portable) (630-80001)EACH2$721.40$500.00$503.00$575.00$1,009.80$1,550.00$600.00
116Construction traffic sign (panel size A) (630-80341)EACH12$47.43$50.00$50.50$57.50$65.34$61.00$60.00
117Construction traffic sign (panel size B) (630-80342)EACH36$63.50$60.00$60.50$69.00$77.22$61.00$70.00
118Construction information sign (630-80348)EACH4$100.00$200.00$201.00$230.00$297.00$205.00$250.00
119Portable message sign panel (630-80355)EACH4$5,250.59$6,000.00$7,345.00$6,900.00$7,722.00$9,250.00$7,000.00
120Drum channelizing device (630-80360)EACH200$32.73$75.00$92.00$86.25$77.22$20.00$90.00
121Barrier (temporary) (630-80370)LF2,000$55.12$15.00$10.00$41.00$65.34$40.00$55.00
122Traffic cone (630-80380)EACH500$8.34$10.00$10.00$11.50$17.82$1.00$11.00
123Mobile attenuator (630-85041)DAY30$1,024.20$1,000.00$1,005.00$1,150.00$1,485.00$400.00$1,250.00
124Initial shotcrete facing (641-10010)SF4,845$50.00$23.00$39.50$26.45$27.32$25.00$29.25
125Shotcrete sculpting (641-10070)SY539$197.99$230.00$319.00$275.17$273.24$325.00$475.00
CDOT contract C25393: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.

Every contract let that day: CDOT letting of September 18, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy