Topsoil (onsite), CDOT 207-00700
Low bidders on CDOT contracts carried a median of $23.00 per CY for this item, over the 24 months to 10 SEP 2026, across 32 low bids. Half of all 119 bids fell between $12.71 and $43.50.
- Owner
- Colorado DOT
- Item
- 207-00700
- Unit
- CY
- Data through
- 10 SEP 2026
CDOT prints this item as “Topsoil (Onsite)”.
By year of letting
| Year | Contracts | Low bids | Low-bid median | All bids | Median, all bids |
|---|---|---|---|---|---|
| 2023 | 2 | 2 | $46.95 | 2 | $46.95 |
| 2024 | 24 | 24 | $25.00 | 93 | $25.00 |
| 2025 | 16 | 16 | $33.30 | 59 | $25.00 |
Bid prices as published, not adjusted for inflation.
By region
| Region | Low bids | Low-bid median | All bids | Median, all bids |
|---|---|---|---|---|
| Region 4 | 9 | $25.00 | 41 | $20.00 |
| Region 1 | 7 | $21.00 | 28 | $20.75 |
| Region 2 | 5 | $10.00 | 23 | $20.91 |
| Region 3 | 5 | $32.00 | 13 | $29.00 |
| Region 5 | 3 | $34.00 | 11 | $25.00 |
Regions with at least three low bids, over the last 24 months.
By quantity
| Quantity (CY) | Low bids | Low-bid median |
|---|---|---|
| 18 to 203 | 8 | $44.73 |
| 220 to 850 | 8 | $40.50 |
| 1,179 to 2,785 | 8 | $23.00 |
| 3,692 to 65,889 | 8 | $15.29 |
The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.
Who is lowest on this line
| Bidder | Lines bid | Lowest on the line |
|---|---|---|
| Myers & Sons Construction, LLC | 12 | 6 (50%) |
| Oldcastle SW Group, Inc. | 7 | 3 (43%) |
| Structures, Inc. | 8 | 2 (25%) |
| Morton Electric, Inc. | 7 | 1 (14%) |
| Rodriguez Construction Org., LLC | 6 | 1 (17%) |
| Abco Contracting, Inc. | 5 | 1 (20%) |
The lowest unit price on each line, whoever won the contract, over all lettings in the data, for firms with five lines or more.
Latest contracts with this item
| Let | Contract | Region | Quantity | Low bidder's price | Median | Estimate | Bids | Low bidder | Source |
|---|---|---|---|---|---|---|---|---|---|
| 18 SEP 2025 | C25393 | Region 2 | 10,252 | $5.00 | $8.85 | $16.66 | 8 | Siete, Inc. | CDOT |
| 11 SEP 2025 | C24061 | Region 4 | 40 | $55.00 | $55.00 | $53.10 | 5 | Sturgeon Electric Company, Inc. | CDOT |
| 21 AUG 2025 | C26065 | Region 1 | 484 | $20.00 | $27.00 | $72.48 | 5 | Myers & Sons Construction, LLC | CDOT |
| 14 AUG 2025 | C26205 | Region 1 | 500 | $47.00 | $51.00 | $31.11 | 4 | Sturgeon Electric Company, Inc. | CDOT |
| 11 JUL 2025 | C25960 | 16,000 | $11.59 | $11.59 | $11.59 | 1 | Kraemer North America, LLC | CDOT | |
| 12 JUN 2025 | C26058 | Region 3 | 575 | $80.00 | $32.94 | $30.00 | 4 | Ridgway Valley Enterprises, Inc | CDOT |
| 05 JUN 2025 | C25575 | Region 1 | 18 | $12.00 | $19.34 | $85.00 | 5 | Myers & Sons Construction, LLC | CDOT |
| 23 MAY 2025 | C25826 | 1,500 | $32.60 | $32.60 | $32.60 | 1 | Jalisco International, Inc. | CDOT | |
| 08 MAY 2025 | C25862 | Region 4 | 5,243 | $5.60 | $10.50 | $11.30 | 3 | Castle Rock Construction Company of Colorado, LLC | CDOT |
| 01 MAY 2025 | C25564 | Region 5 | 650 | $34.00 | $39.50 | $30.00 | 4 | Structures, Inc. | CDOT |
| 03 APR 2025 | C26489 | Region 4 | 162 | $80.00 | $80.00 | $20.00 | 1 | Brannan Sand and Gravel, LLC | CDOT |
| 28 FEB 2025 | C26678 | Region 5 | 161 | $15.00 | $21.71 | $50.00 | 4 | Myers & Sons Construction, LLC | CDOT |
| 27 FEB 2025 | C25860 | Region 4 | 1,372 | $42.00 | $17.50 | $25.04 | 6 | Rodriguez Construction Org., LLC | CDOT |
| 06 FEB 2025 | C25802 | Region 3 | 3,692 | $21.00 | $25.00 | $30.00 | 2 | Oldcastle SW Group, Inc. | CDOT |
| 30 JAN 2025 | C25012 | Region 3 | 34 | $120.00 | $102.00 | $120.00 | 3 | Sturgeon Electric Company, Inc. | CDOT |
Filter this item by your own quantity, region and period, or check your price against it, in the CDOT explorer.
How these prices were read
CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
- Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
- Item codes and units are CDOT's own: this item is compared with CDOT contracts only.
- Prices are bid prices, not paid prices. Use them as a reference range, never as a quote.
- The data runs to the CDOT letting of 10 SEP 2026 and was rebuilt on 26 NOV 2026.