Morton Electric, Inc.: CDOT bid record
Morton Electric, Inc. submitted 18 bids on Colorado DOT contracts in the data, from 13 JUN 2024 to 11 SEP 2025, and was the low bidder on 5 of them (28%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- Colorado DOT
- Low bid volume
- $8,893,671
- Latest bid
- 11 SEP 2025
- Data through
- 10 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 9 | 3 | 33% |
| 2025 | 9 | 2 | 22% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 1 | 5 | 0 | 0% |
| Region 4 | 5 | 1 | 20% |
| Region 2 | 3 | 1 | 33% |
| Region 3 | 2 | 1 | 50% |
| Region 5 | 1 | 1 | 100% |
| Region HQ ITS in Boulder | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| 3 inch electrical conduit (bored) | 613-00306 | LF | 12 | 9 (75%) | $25.50 | $34.41 |
| Traffic signal face (12-12-12) | 614-70336 | EACH | 9 | 9 (100%) | $883.00 | $1,400.00 |
| 2 inch electrical conduit (bored) | 613-00206 | LF | 12 | 8 (67%) | $23.50 | $29.00 |
| Sign panel (class I) | 614-00011 | SF | 12 | 7 (58%) | $34.50 | $33.00 |
| Type four pull box | 613-07004 | EACH | 12 | 7 (58%) | $2,190.50 | $3,105.00 |
| Sweeping (sediment removal) | 208-00106 | HR | 11 | 7 (64%) | $150.00 | $200.00 |
| Curb and gutter type 2 (section II-B) | 609-21020 | LF | 11 | 7 (64%) | $58.00 | $54.00 |
| Traffic control management | 630-00012 | DAY | 16 | 6 (38%) | $1,272.50 | $1,500.00 |
| Construction traffic sign (panel size A) | 630-80341 | EACH | 16 | 6 (38%) | $52.50 | $55.00 |
| Potholing | 203-01597 | HR | 16 | 6 (38%) | $300.00 | $350.00 |
| Traffic cone | 630-80380 | EACH | 15 | 6 (40%) | $10.00 | $13.00 |
| Aggregate bag | 208-00035 | LF | 11 | 6 (55%) | $11.00 | $12.75 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Sturgeon Electric Company, Inc. | 9 | 6 of 9 |
| Lighthouse Transportation Group, LLC | 7 | 5 of 7 |
| Adiona Transportation Solutions LLC | 6 | 3 of 6 |
| Lumin8 Transportation Technologies, LLC | 4 | 0 of 4 |
| Concrete Concepts Design Inc, DBA Pyramid Construction Inc | 2 | 1 of 2 |
| Rodriguez Construction Org., LLC | 2 | 0 of 2 |
| Myers & Sons Construction, LLC | 2 | 0 of 2 |
| Advanced Electrical Contracting, Inc. | 2 | 0 of 2 |
| Goodland Construction, Inc. | 2 | 1 of 2 |
| Sema Construction, Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 11 SEP 2025 | C24061 | Region 4 | Install a traffic control signal at the intersection of SH52 and WCR41. | 2 of 5 | $598,005 | 0.0% |
| 14 AUG 2025 | C25525 | Region 4 | VARIOUS LOCATIONS THROUGHOUT R4 | 4 of 4 | $4,019,196 | +68% |
| 14 AUG 2025 | C26205 | Region 1 | SH 74/KERRGULCH;SH83/GILLIAN,RUSSELLVILLE;SH30/PICCADILLY | 3 of 4 | $1,472,210 | +1.0% |
| 17 JUL 2025 | C26196 | Region 1 | WADSWORTH BLVD & EVANS AVE Installation of new traffic signal and curb ramps at the intersection of Wadsworth Blvd & Evans Ave. One dual mas | 3 of 4 | $708,679 | +8.0% |
| 26 JUN 2025 | C25982 | Region HQ ITS in Boulder | Install fiber optic cable along SH-66 from I-25 to Lyons and Install cameras along US-36 from Lyons to Estes Park This project has an OPTION | 2 of 4 | $5,573,359 | +4.0% |
| 17 APR 2025 | C23818 | Region 3 | Signal head, cabinet, and conduit replacements. | 1 of 1 | $635,240 | Low |
| 10 APR 2025 | C26304 | Region 2 | US50/MAPLE & US287/CEDAR, LAMAR PROWERS COUNTY | 1 of 2 | $1,482,503 | Low, 19% under the second |
| 13 FEB 2025 | C22951 | Region 1 | FEDERAL BLVD SIGNAL MULTIPLE LOCATIONS | 5 of 6 | $1,100,000 | +18% |
| 30 JAN 2025 | C25012 | Region 3 | This project will replace the traffic signal at the CO-13 (Yampa Ave.) & 9th St in Craig, CO as well as replace the conduit and signal cabin | 2 of 3 | $1,385,962 | +8.0% |
| 19 DEC 2024 | C24618 | Region 5 | Project 24618 US 160D Mancos Pedestrian Improvements is an ADA curb ramp and sidewalk installation project. The project proposes replacement | 1 of 2 | $2,172,250 | Low, 24% under the second |
| 12 DEC 2024 | C26096 | Region 2 | US 50C AND BAXTER RD | 2 of 3 | $848,131 | +1.0% |
| 24 OCT 2024 | C23021 | Region 1 | This project is located on State Highway 53 between 58th Ave and 70th Ave. The work involves the replacement of traffic signals at 62nd and | 4 of 5 | $1,411,952 | +12% |
| 24 OCT 2024 | C25613 | Region 4 | CO 402 & S CR 5 (MM 140.0-141.1) | 3 of 5 | $472,709 | +10% |
| 29 AUG 2024 | C19164 | Region 4 | US 34 & US 85 INTERCHANGE IN GREELEY | 2 of 6 | $2,857,746 | +10% |
| 01 AUG 2024 | C25205 | Project will updated technology and communications at 18 chain stations along I-70 from Vail to Genessee and 2 chain stations along I-25 in | 1 of 1 | $3,801,536 | Low | |
| 11 JUL 2024 | C25140 | Region 1 | This project will be doing a full-depth replacement of the pavement of the NB chain area where trucks will be entering to de-chain only when | 3 of 5 | $2,678,576 | +5.0% |
| 11 JUL 2024 | C25602 | Region 4 | Project will replace signal poles, mast arms, and signal equipment at two intersections in Loveland: US 34 & N Van Buren Ave and CO 402 & So | 1 of 5 | $802,143 | Low, 14% under the second |
| 13 JUN 2024 | C25832 | Region 2 | US 85 & CARSON BLVD, FOUNTAIN, EL PASO COUNTY | 2 of 3 | $2,690,432 | +4.0% |
How this record was read
CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; CDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.