CDOT contract C26304 bid tabulation

US50/MAPLE & US287/CEDAR, LAMAR PROWERS COUNTY. Let by Colorado DOT on April 10, 2025, Prowers, Region 2. 2 bids received; low bid $1,482,503 by Morton Electric, Inc., -7.3% against the engineer's estimate of $1,600,000.

Owner
Colorado DOT
Letting
10 APR 2025
Pay items
88
Data through
10 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Morton Electric, Inc.$1,482,503Low-7.0%
2Sturgeon Electric Company, Inc.$1,758,653+19%+10%
CDOT contract C26304: bids by rank

Engineer's estimate: $1,600,000.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Morton Electric, Inc.2. Sturgeon Electric Company, Inc.
1Tree trimming (202-00008)HR6$280.14$100.00$1,200.00
2Removal of median cover (202-00195)SY12$68.53$108.00$90.00
3Removal of sidewalk (202-00200)SY9.50$61.54$105.00$120.00
4Removal of curb (202-00201)LF14$25.88$39.00$80.00
5Removal of curb and gutter (202-00203)LF32$42.09$50.00$46.00
6Removal of concrete curb ramp (202-00206)SY7$39.52$132.00$150.00
7Removal of concrete pavement (202-00210)SY7.50$78.31$138.00$200.00
8Removal of pavement marking (202-00250)SF2,454$3.36$4.00$4.00
9Removal of sign panel (202-00821)EACH16$59.56$101.00$230.00
10Removal of pull box (202-00827)EACH10$257.44$200.00$700.00
11Removal of traffic signal equipment (202-00828)LS1$15,000$24,750$50,000
12Removal of radar detection system (202-00887)EACH1$330.00$1,150.00$350.00
13Removal of concrete foundation and slab (202-00950)SY8$286.14$110.00$250.00
14Unclassified excavation (203-00000)CY10.40$242.92$275.00$350.00
15Potholing (203-01597)HR186$281.67$75.00$650.00
16Topsoil (offsite) (207-00702)CY2$112.22$275.00$350.00
17Subgrade soil preparation (207-00704)SY145$11.15$110.00$6.00
18Erosion log type 1 (12 inch) (208-00002)LF24$11.80$46.00$21.00
19Pre-fabricated concrete washout structure (type 1) (208-00046)EACH1$3,250.35$6,475.00$4,200.00
20Storm drain inlet protection (type I) (208-00051)LF68$17.57$17.00$22.00
21Pre-fabricated vehicle tracking pad (208-00075)EACH2$5,165.59$1,000.00$14,000
22Sweeping (sediment removal) (208-00106)HR21$171.58$94.00$230.00
23Portable pan-tilt-zoom camera (reset) (210-00892)EACH1$1,417.31$1,250.00$2,200.00
24Organic fertilizer (212-00700)LB9$7.71$43.00$38.00
25Compost (mechanically applied) (212-00701)CY2$379.81$440.00$1,200.00
26Mycorrhizae (212-00704)LB2$70.33$165.00$100.00
27Seeding (native) broadcast (212-00708)ACRE0.03$17,401$73,333$30,000
28Environmental health and safety management (250-00010)LS1$15,000$11,385$6,000.00
29Aggregate base course (class 6) (304-06000)TON10.20$107.53$314.00$300.00
30Replace concrete pavement (412-04999)SY7.50$300.00$418.00$650.00
31Drilled shaft (36 inch) (503-00036)LF126$803.63$850.00$900.00
32Drilled shaft (48 inch) (503-00048)LF21$1,061.54$900.00$1,200.00
33Drilled shaft (54 inch) (503-00054)LF21$1,011.42$950.00$1,300.00
34Concrete sidewalk (608-00000)SY9.50$165.78$374.00$390.00
35Concrete curb ramp (608-00010)SY8$319.68$957.00$560.00
36Curb and gutter type 2 (section II-B) (609-21020)LF16$103.80$138.00$280.00
37Median cover material (patterned concrete) (610-00020)SF9$41.00$358.00$90.00
382 inch electrical conduit (bored) (613-00206)LF2,280$20.00$24.00$27.00
393 inch electrical conduit (bored) (613-00306)LF562$97.55$25.00$32.00
402 inch electrical conduit (plastic) (613-01200)LF218$27.01$24.00$27.00
413 inch electrical conduit (plastic) (613-01300)LF218$23.79$25.00$32.00
42Type two pull box (613-07002)EACH9$1,300.91$2,053.00$2,000.00
43Type four pull box (613-07004)EACH10$1,971.49$2,932.00$3,500.00
44Wiring (613-10000)LS1$45,000$62,700$98,000
45Luminaire (LED) (8,000 lumens) (613-13008)EACH5$1,090.77$1,134.00$1,200.00
46Meter power pedestal (613-50109)EACH3$12,000$8,163.00$13,000
47Sign panel (class I) (614-00011)SF238.50$41.32$34.00$85.00
48Pedestrian signal face (16) (countdown) (614-70150)EACH20$970.26$720.00$1,200.00
49Traffic signal face (12-12-12) (614-70336)EACH39$850.00$906.00$1,800.00
50Traffic signal face (12-12-12-12) (614-70448)EACH9$1,200.00$1,086.00$2,100.00
51Traffic signal controller cabinet (614-72855)EACH2$40,000$44,750$46,000
52Pedestal pole (3 foot 6 inch) (614-72858)EACH4$1,015.10$1,053.00$2,800.00
53Pedestrian push button (614-72860)EACH3$257.61$466.00$900.00
54Coordination unit (614-72870)EACH2$5,000.00$1,150.00$9,000.00
55Vehicle detection system (single camera) (614-72895)EACH3$8,688.86$5,067.00$7,800.00
56Flashing beacon (614-80000)EACH2$7,034.80$6,004.00$9,800.00
57Traffic signal-light pole steel (1-35 foot mast arm) (614-81135)EACH3$28,217$25,872$22,500
58Traffic signal-light pole steel (1-40 foot mast arm) (614-81140)EACH1$30,000$22,116$24,000
59Traffic signal-light pole steel (1-45 foot mast arm) (614-81145)EACH2$35,000$22,640$24,500
60Traffic signal-light pole steel (1-50 foot mast arm) (614-81150)EACH1$40,000$23,409$25,500
61Traffic signal-light pole steel (1-55 foot mast arm) (614-81155)EACH1$42,000$23,525$26,000
62Traffic signal light pole steel (1-60 foot mast arm) (614-81160)EACH1$24,334$36,050$38,500
63Traffic signal-light pole steel (1-70 foot mast arm) (614-81170)EACH1$45,000$38,660$41,000
64Traffic signal pedestal pole steel (614-84000)EACH5$1,826.59$2,686.00$5,600.00
65Controller (type 2070) (614-86748)EACH2$6,359.66$8,248.00$7,800.00
66Fiber optic cable (single mode) (12 fiber) (614-87010)LF150$12.44$16.00$18.00
67Fiber optic termination panel (12 fiber) (614-87012)EACH2$1,421.71$522.00$600.00
68Buffer tube fan out kit (614-87015)EACH2$346.87$308.00$390.00
69Closed circuit television camera (traffic surveillance) (614-87333)EACH2$8,166.52$6,030.00$6,400.00
70Splice fiber optic cable (12 strand) (614-87512)EACH2$1,627.98$770.00$850.00
71Terminate fiber optic cable (12 strand) (614-87612)EACH2$1,500.15$660.00$750.00
72Mobilization (626-00000)LS1$286,420$228,900$120,000
73Public information services (tier IV) (626-01104)LS1$10,000$7,700.00$9,500.00
74Thermoplastic pavement marking (xwalk- stopline) (627-30210)SF2,448$22.50$13.00$21.00
75Preformed thermoplastic pavement marking (word-symbol) (627-30405)SF91.90$26.52$16.00$32.00
76Flagging (630-00000)HR30$37.11$36.00$50.00
77Uniformed traffic control (630-00003)HR65$132.48$165.00$280.00
78Traffic control inspection (630-00007)DAY10$400.00$550.00$760.00
79Traffic control management (630-00012)DAY69$1,200.00$1,513.00$1,600.00
80Uniformed traffic control coordination (630-00015)HR18$28.50$59.00$225.00
81Barricade (type 3 F-A) (temporary) (630-80331)EACH6$236.12$220.00$60.00
82Construction traffic sign (panel size A) (630-80341)EACH4$49.35$55.00$60.00
83Construction traffic sign (panel size B) (630-80342)EACH42$65.84$61.00$120.00
84Construction traffic sign (panel size C) (630-80343)EACH16$74.36$66.00$220.00
85Portable message sign panel (630-80355)EACH4$5,247.14$7,150.00$6,500.00
86Advance warning flashing or sequencing arrow panel (A type) (630-80356)EACH1$1,316.65$1,100.00$3,200.00
87Drum channelizing device (630-80360)EACH36$34.90$17.00$26.00
88Mobile attenuator (630-85041)DAY60$230.37$798.00$290.00
CDOT contract C26304: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.

Every contract let that day: CDOT letting of April 10, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy