CDOT letting results, December 19, 2024
7 contracts let by Colorado DOT on December 19, 2024, $44,414,347 in low bids, a median of 3 bidders per contract. On the 7 with an engineer's estimate, the low bid came in under it 3 times; median low bid +1.0% against the estimate.
- Owner
- Colorado DOT
- Contracts
- 7
- Low bids, total
- $44,414,347
- Data through
- 10 SEP 2026
Contracts let that day
| Contract | Project | Region | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| C24548 | This project is located in Adams and Broomfield County on I-25 andCO-7. It will install Bustang slip ramps for the I-25 NB off ramp and SB on-ramp, pedestrian b | Region 1 | 5 | Hudick Excavating, Inc. | $13,475,476 | $14,702,414 | +9.0% | +1.0% | CDOT |
| C25465 | US 24 FROM FLORISSANT TO WOODLAND PARK M.P. 269.410 to M.P. 281.025 Resurface Roadway with 2.25" mill and fill. Update guardrail to MASH standards where needed. | Region 2 | 3 | Martin Marietta Materials, Inc. | $12,120,994 | $12,535,751 | +3.0% | +10% | CDOT |
| C25080R | SH 67 - MP 76.92 TO MP 78.20. SH 67 from just past Evergreen Heights Road to just before Kelley's Road will be widened to 4 lanes and a middle shared turn lane | Region 2 | 3 | Capital Paving & Construction, LLC | $7,239,315 | $8,075,797 | +12% | -20% | CDOT |
| C18808 | Located on US 85 Business (8th Ave) in Greeley from MP 0.328 to MP 1.990. This project will primarily consist of concrete slab replacement. Also included in the | Region 4 | 6 | TLM Constructors, Inc. | $5,282,791 | $5,372,516 | +2.0% | +9.0% | CDOT |
| C19934 | US85 SANTA FE FLORIDA TO I-25 | Region 1 | 6 | Brannan Sand and Gravel, LLC | $3,298,574 | $3,576,711 | +8.0% | -2.0% | CDOT |
| C24618 | Project 24618 US 160D Mancos Pedestrian Improvements is an ADA curb ramp and sidewalk installation project. The project proposes replacement or install of 64 AD | Region 5 | 2 | Morton Electric, Inc. | $2,172,250 | $2,684,265 | +24% | +18% | CDOT |
| C25581 | THIS IS A CULVERT TREATMENT PROJECT IN MOFFAT COUNTY ALONG US 40 AT MP 36.64 AND ALONG SH 394 AT MP 1.26. BOTH LOCATIONS WILL RECEIVE CURE-IN- PLACE-PIPE (CIPP) | Region 3 | 3 | American West Construction, LLC | $824,948 | $832,190 | +1.0% | -43% | CDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than CDOT received, the others did not match their published totals and are left out.