Martin Marietta Materials, Inc.: CDOT bid record

Martin Marietta Materials, Inc. submitted 16 bids on Colorado DOT contracts in the data, from 09 MAY 2024 to 18 DEC 2025, and was the low bidder on 5 of them (31%). When it was not low, its total sat a median +18% above the low bid.

Owner
Colorado DOT
Low bid volume
$61,535,197
Latest bid
18 DEC 2025
Data through
10 SEP 2026
16Bids
5Low bids
31Win rate, percent
+18%Median gap to the low bid when not low, 11 bids

By year

YearBidsLow bidsWin rate
202410330%
20256233%
Martin Marietta Materials, Inc., CDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 17114%
Region 46233%
Region 22150%
Martin Marietta Materials, Inc., CDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Portable message sign panel630-80355EACH166 (38%)$6,100.00$6,713.65
Sanitary facility620-00020EACH156 (40%)$5,500.00$4,760.00
Pre-fabricated vehicle tracking pad208-00075EACH126 (50%)$3,900.00$6,000.00
Sign panel (class I)614-00011SF126 (50%)$29.61$33.00
Construction traffic sign (panel size A)630-80341EACH155 (33%)$55.00$55.00
Construction traffic sign (panel size B)630-80342EACH155 (33%)$75.00$66.50
Removal of asphalt mat (planing)202-00240SY155 (33%)$3.02$6.00
Removal of asphalt mat202-00220SY125 (42%)$21.50$20.50
Removal of pavement marking202-00250SF105 (50%)$2.12$3.28
Flagging630-00000HR164 (25%)$53.14$48.00
Modified epoxy pavement marking627-00008GAL164 (25%)$171.55$205.75
Traffic cone630-80380EACH154 (27%)$15.04$13.00
Martin Marietta Materials, Inc., CDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Brannan Sand and Gravel, LLC95 of 9
Oldcastle SW Group, Inc.94 of 9
Kiewit Infrastructure Co.50 of 5
Asphalt Specialties Co., Inc.54 of 5
Holcim -WCR, Inc. Aggregate Industries - WCR, Inc.31 of 3
Rodriguez Construction Org., LLC30 of 3
Coulson Excavating Company, Inc.21 of 2
Connell Resources Incorporated20 of 2
Edw. C. Levy Co.21 of 2
McAtee Construction Co.11 of 1
Martin Marietta Materials, Inc., CDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
18 DEC 2025C24846County line to purcell blvd1 of 3$12,305,351Low, 4.0% under the second
24 APR 2025C26766Region 4RESURFACING OF US287 NEAR OWL CANYON RD (MM 362.76 to MP 363.56)1 of 3$617,733Low, 7.0% under the second
27 MAR 2025C23177Region 1US 40 - EMPIRE JUNCTION TO BERTHOD PASS BEGINNING AT M.P. 252 AND EXTENDING TO M.P. 258.3. THIS PROJECT CONSISTS OF REMOVING 2.5" OF EXISTIN3 of 4$14,736,457+25%
20 MAR 2025C23369Region 1US 85 FROM I-76 TO 124TH AVENUE Resurfacing project on US85 from I-76 to 124th Avenue. It also includes median work at 120th Avenue.3 of 3$8,668,191+19%
20 FEB 2025C26314Region 4Project 26314 is in Boulder County on CO7 between 28th St (MP 52.3) to Cherryvale Rd (MP 55.5) and includes the following major operations: 2 of 4$9,062,537+12%
09 JAN 2025C23780Region 1US287:RESURFACING I-70 TO 92ND AVE3 of 3$13,968,532+8.0%
19 DEC 2024C19934Region 1US85 SANTA FE FLORIDA TO I-254 of 6$3,883,531+18%
19 DEC 2024C25465Region 2US 24 FROM FLORISSANT TO WOODLAND PARK M.P. 269.410 to M.P. 281.025 Resurface Roadway with 2.25" mill and fill. Update guardrail to MASH sta1 of 3$12,120,994Low, 3.0% under the second
12 DEC 2024C25806Region 1This is a resurfacing project for I-25 from Alameda Ave (MP 208.063) to 44th Ave (MP 213.45) in the city and county of Denver. the scope of 3 of 3$29,701,702+35%
31 OCT 2024C23509Region 4This is primarily a resurfacing project on CO 52 from MP 54.58 to MP 60.87. Work also included in this project is shoulder widening (MP 47.92 of 5$5,781,405+11%
31 OCT 2024C23819Region 2SH 115 - M.P. 41.589 TO M.P. 47.296, Resurfacing whole corridor, replace curb ramps, replace guardrail as needed, update some pedestrian sig2 of 4$11,082,398+7.0%
24 OCT 2024C25942Region 4This is an HMA overlay project North and South of Akron along SH 63 MM 25.1 to 34.3 with 3.5 " of HMA. Within the town of Akron a 2.5" HMA m3 of 3$9,448,792+20%
12 SEP 2024C26259Region 4US 287 MP 354.71 TO MP 355.701 of 4$1,764,961Low, 5.0% under the second
11 JUL 2024C26262Region 4I25 FRONTAGE ROAD MP 254-270 LARIMER COUNTY2 of 3$574,612+12%
06 JUN 2024C22601Region 1This is a resurfacing project on SH7, from I-25 to US85. It also includes ADA Curb Ramps, new Traffic Signals at the Holly Intersection, and4 of 4$12,633,807+41%
09 MAY 2024C24417SRegion 1Project scope is to resurface EB and WB I-70 from Chief Hosa (MP 252.4) to Colfax (MP 258.7). The resurfacing project will include mill and 1 of 5$34,726,159Low, 13% under the second
Martin Marietta Materials, Inc.: latest CDOT bids in the data

How this record was read

CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; CDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy