CDOT letting results, May 9, 2024
2 contracts let by Colorado DOT on May 9, 2024, $36,687,783 in low bids, a median of 4 bidders per contract. On the 2 with an engineer's estimate, the low bid came in under it 1 times; median low bid -11% against the estimate.
- Owner
- Colorado DOT
- Contracts
- 2
- Low bids, total
- $36,687,783
- Data through
- 10 SEP 2026
Contracts let that day
| Contract | Project | Region | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| C24417S | Project scope is to resurface EB and WB I-70 from Chief Hosa (MP 252.4) to Colfax (MP 258.7). The resurfacing project will include mill and fill, guardrail impr | Region 1 | 5 | Martin Marietta Materials, Inc. | $34,726,159 | $39,239,580 | +13% | +12% | CDOT |
| C24598 | SH133 ROCKFALL MITIGATION MP21 TO MP31.5 GUNNISON COUNTY THIS PROJECT IS TO ADD SLOPE WIRE MESH BOLTING AND SCALING ALONG SECTION OF SH133 | Region 3 | 3 | Access Limited Construction | $1,961,624 | $2,741,029 | +40% | -35% | CDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than CDOT received, the others did not match their published totals and are left out.