CDOT contract C23177 bid tabulation
US 40 - EMPIRE JUNCTION TO BERTHOD PASS BEGINNING AT M.P. 252 AND EXTENDING TO M.P. 258.3. THIS PROJECT CONSISTS OF REMOVING 2.5" OF EXISTING ASPHALT PAVEMENT AND PLACING 2.5" OF HMA. IN ADDITION, THIS PROJECT INCLUDES CLEANING INLETS AND CULVERTS, UPGRADING EXISTING ADA CURB RAMPS, CROSSWALKS, MAKI. Let by Colorado DOT on March 27, 2025, Clear Creek, Region 1. 4 bids received; low bid $11,822,057 by Oldcastle SW Group, Inc., +4.6% against the engineer's estimate of $11,300,000.
- Owner
- Colorado DOT
- Letting
- 27 MAR 2025
- Pay items
- 204
- Data through
- 10 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Oldcastle SW Group, Inc. | $11,822,057 | Low | +5.0% |
| 2 | Kilgore Companies, LLC dba Elam Construction | $14,634,409 | +24% | +30% |
| 3 | Martin Marietta Materials, Inc. | $14,736,457 | +25% | +30% |
| 4 | Brannan Sand and Gravel, LLC | $17,686,997 | +50% | +57% |
Engineer's estimate: $11,300,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Oldcastle SW Group, Inc. | 2. Kilgore Companies, LLC dba Elam Construction | 3. Martin Marietta Materials, Inc. | 4. Brannan Sand and Gravel, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201-00000) | LS | 1 | $50,000 | $32,136 | $100,000 | $20,667 | $196,321 |
| 2 | Removal of tree (202-00010) | EACH | 13 | $695.99 | $642.70 | $1,000.00 | $799.39 | $6,000.00 |
| 3 | Removal of inlet (202-00019) | EACH | 3 | $1,848.22 | $2,448.38 | $1,900.00 | $3,045.29 | $9,200.00 |
| 4 | Removal of pipe (202-00035) | LF | 2,152 | $25.10 | $51.01 | $53.00 | $63.44 | $94.00 |
| 5 | Removal of fiber optic cable (202-00055) | LF | 1,280 | $2.17 | $3.06 | $3.50 | $3.83 | $3.80 |
| 6 | Removal of travel time indicator (202-00060) | EACH | 1 | $488.56 | $280.56 | $290.00 | $350.67 | $350.00 |
| 7 | Removal of delineator (202-00090) | EACH | 300 | $7.71 | $12.36 | $8.50 | $15.26 | $15.50 |
| 8 | Removal of sidewalk (202-00200) | SY | 70 | $38.83 | $31.21 | $70.00 | $38.25 | $57.50 |
| 9 | Removal of curb and gutter (202-00203) | LF | 451 | $29.44 | $15.61 | $33.00 | $19.13 | $25.75 |
| 10 | Removal of concrete curb ramp (202-00206) | SY | 91 | $84.41 | $34.33 | $91.00 | $42.08 | $57.50 |
| 11 | Removal of concrete pavement (202-00210) | SY | 6 | $137.64 | $52.02 | $243.00 | $63.76 | $64.25 |
| 12 | Removal of asphalt mat (202-00220) | SY | 1,244 | $30.00 | $139.31 | $70.00 | $279.51 | $235.00 |
| 13 | Removal of asphalt mat (planing) (202-00240) | SY | 209,269 | $5.00 | $4.90 | $5.00 | $7.07 | $7.20 |
| 14 | Removal of pavement marking (202-00250) | SF | 24,129 | $1.06 | $1.29 | $1.00 | $0.95 | $1.60 |
| 15 | Removal of ground sign (202-00810) | EACH | 27 | $147.93 | $190.61 | $121.00 | $235.32 | $240.00 |
| 16 | Removal of sign panel (202-00821) | EACH | 200 | $60.43 | $128.79 | $84.50 | $159.00 | $160.00 |
| 17 | Removal of pull box (202-00827) | EACH | 2 | $250.31 | $1,377.27 | $1,400.00 | $1,721.46 | $1,700.00 |
| 18 | Removal of traffic signal equipment (202-00828) | LS | 1 | $50,000 | $17,343 | $18,000 | $21,678 | $21,000 |
| 19 | Removal of traffic signal controller cabinet (202-00855) | EACH | 1 | $892.24 | $3,213.64 | $3,325.00 | $4,016.74 | $4,000.00 |
| 20 | Removal of traffic signal vehicle detector amplifier (202-00880) | EACH | 3 | $600.00 | $76.52 | $79.00 | $95.64 | $96.00 |
| 21 | Removal of radar detection system (202-00887) | EACH | 1 | $322.06 | $561.11 | $581.00 | $701.33 | $700.00 |
| 22 | Removal of guardrail type 3 (202-01130) | LF | 1,870 | $10.00 | $3.61 | $5.00 | $5.52 | $5.50 |
| 23 | Removal of end anchorage (202-01300) | EACH | 10 | $417.11 | $489.39 | $301.00 | $361.63 | $370.00 |
| 24 | Plug culvert (202-04001) | EACH | 1 | $4,126.30 | $3,570.55 | $1,583.00 | $4,441.05 | $5,300.00 |
| 25 | Clean culvert (202-04002) | EACH | 27 | $1,545.08 | $3,381.31 | $2,956.00 | $4,164.67 | $5,600.00 |
| 26 | Clean inlet (202-04010) | EACH | 15 | $1,438.21 | $1,040.40 | $1,478.00 | $1,281.44 | $2,430.00 |
| 27 | Embankment material (complete in place) (203-00060) | CY | 56 | $120.00 | $204.03 | $232.00 | $274.43 | $390.00 |
| 28 | Blading (203-01500) | HR | 80 | $205.47 | $252.53 | $165.00 | $215.96 | $245.00 |
| 29 | Dozing (203-01550) | HR | 40 | $191.57 | $252.53 | $234.00 | $200.88 | $410.00 |
| 30 | Combination loader (203-01594) | HR | 80 | $176.86 | $176.77 | $349.00 | $178.27 | $200.00 |
| 31 | Potholing (203-01597) | HR | 100 | $331.70 | $357.07 | $475.00 | $446.30 | $450.00 |
| 32 | Laborer (203-02330) | HR | 40 | $67.35 | $101.01 | $47.00 | $68.65 | $100.00 |
| 33 | Wetland topsoil (207-00305) | CY | 7 | $152.56 | $1,019.76 | $500.00 | $495.88 | $2,200.00 |
| 34 | Topsoil (offsite) (207-00702) | CY | 2,700 | $120.00 | $35.42 | $20.00 | $111.51 | $185.00 |
| 35 | Erosion log type 1 (12 inch) (208-00002) | LF | 820 | $6.77 | $5.20 | $5.00 | $6.54 | $8.90 |
| 36 | Erosion log type 1 (20 inch) (208-00013) | LF | 370 | $11.15 | $8.32 | $7.75 | $11.21 | $14.00 |
| 37 | Silt fence (reinforced) (208-00021) | LF | 1,100 | $7.60 | $5.72 | $2.50 | $3.20 | $12.00 |
| 38 | Aggregate bag (208-00035) | LF | 252 | $13.95 | $9.36 | $8.00 | $11.53 | $13.50 |
| 39 | Concrete washout structure (208-00045) | EACH | 1 | $6,000.00 | $780.30 | $2,930.00 | $4,399.28 | $4,000.00 |
| 40 | Storm drain inlet protection (type I) (208-00051) | LF | 86 | $13.30 | $10.40 | $23.00 | $11.53 | $24.00 |
| 41 | Vehicle tracking pad (208-00070) | EACH | 2 | $3,297.25 | $2,496.97 | $3,046.00 | $2,056.20 | $6,500.00 |
| 42 | Removal and disposal of sediment (labor) (208-00103) | HR | 120 | $84.22 | $72.83 | $46.50 | $176.26 | $130.00 |
| 43 | Removal and disposal of sediment (equipment) (208-00105) | HR | 40 | $177.41 | $119.65 | $114.00 | $531.04 | $200.00 |
| 44 | Sweeping (sediment removal) (208-00106) | HR | 50 | $146.88 | $140.45 | $310.00 | $277.20 | $200.00 |
| 45 | Removal of trash (208-00107) | HR | 20 | $134.32 | $78.03 | $148.00 | $176.26 | $150.00 |
| 46 | Erosion control management (208-00207) | DAY | 50 | $404.34 | $312.12 | $750.00 | $725.77 | $650.00 |
| 47 | Rebuild timber deck (210-00650) | LS | 1 | $8,500.00 | $15,152 | $10,000 | $4,397.08 | $2,000.00 |
| 48 | Reset flashing beacon (210-00825) | EACH | 2 | $1,581.20 | $5,407.07 | $1,637.00 | $6,758.32 | $6,800.00 |
| 49 | Reset fence (210-01000) | LF | 19 | $65.92 | $505.05 | $250.00 | $323.56 | $96.65 |
| 50 | Reset guardrail type 3 (210-01130) | LF | 500 | $13.70 | $25.76 | $66.00 | $78.86 | $80.90 |
| 51 | Compost (mechanically applied) (212-00701) | CY | 7 | $211.00 | $86.68 | $148.00 | $185.81 | $185.00 |
| 52 | Biotic soil amendments (hydraulically applied) (212-00702) | LB | 6,548 | $1.52 | $1.07 | $1.50 | $1.13 | $1.40 |
| 53 | Humate (212-00703) | LB | 125 | $2.34 | $6.12 | $3.50 | $0.56 | $4.00 |
| 54 | Mycorrhizae (212-00704) | LB | 32 | $27.36 | $12.24 | $13.00 | $12.11 | $16.00 |
| 55 | Seeding (native) hydraulic (212-00707) | ACRE | 1.46 | $1,609.70 | $1,376.68 | $648.11 | $2,084.26 | $820.00 |
| 56 | Seeding (native) broadcast (212-00708) | ACRE | 0.10 | $3,275.00 | $4,079.05 | $1,040.00 | $10,770 | $1,300.00 |
| 57 | Seeding (wetland) hydraulic (212-00710) | ACRE | 0.10 | $4,200.00 | $6,628.46 | $7,880.00 | $11,642 | $9,900.00 |
| 58 | Mulching (hydraulic) (213-00011) | ACRE | 1.46 | $2,792.41 | $3,059.29 | $1,655.67 | $4,356.88 | $2,050.00 |
| 59 | Mulch tackifier (213-00061) | LB | 219 | $4.39 | $3.06 | $1.50 | $3.65 | $1.90 |
| 60 | Rock mulch (weed free) (213-00067) | SF | 885 | $7.52 | $5.10 | $3.80 | $4.16 | $4.75 |
| 61 | Extended landscape preservation (214-00008) | LS | 1 | $32,500 | $4,079.05 | $51,000 | $32,036 | $64,565 |
| 62 | Deciduous tree (#5 container) (214-00205) | EACH | 8 | $69.21 | $96.88 | $303.00 | $121.74 | $380.00 |
| 63 | Deciduous shrub (#1 container) (214-00310) | EACH | 10 | $36.64 | $50.99 | $80.00 | $44.85 | $100.00 |
| 64 | Evergreen tree (#5 container) (214-00450) | EACH | 2 | $67.35 | $96.88 | $294.00 | $288.32 | $370.00 |
| 65 | Live willow stakes (214-01013) | EACH | 105 | $6.94 | $10.20 | $9.00 | $15.38 | $11.00 |
| 66 | Dormant log cutting (214-01025) | EACH | 15 | $88.74 | $25.49 | $25.00 | $70.48 | $31.00 |
| 67 | Soil retention blanket (straw-coconut) (biodegradable class 1) (216-00201) | SY | 50 | $6.00 | $35.69 | $10.50 | $32.04 | $66.00 |
| 68 | Herbicide treatment (217-00020) | HR | 40 | $188.87 | $127.47 | $338.00 | $219.85 | $425.00 |
| 69 | Wildlife biologist (240-00000) | HR | 40 | $171.03 | $115.61 | $367.50 | $332.92 | $190.00 |
| 70 | Removal of nests (240-00010) | HR | 40 | $171.00 | $115.61 | $367.50 | $320.36 | $150.00 |
| 71 | Aggregate base course (class 5) (304-05000) | TON | 2,750 | $35.00 | $63.74 | $40.00 | $56.45 | $126.00 |
| 72 | Hot mix asphalt (patching) (asphalt) (403-00721) | SY | 1,082 | $300.00 | $299.80 | $150.00 | $564.27 | $740.00 |
| 73 | Emergency pothole repair (403-00800) | TON | 100 | $656.29 | $530.75 | $100.00 | $844.72 | $675.00 |
| 74 | Hot mix asphalt (grading SX) (75) (PG 58- 28) 00 34 00 (403-34721) | TON | 30,062 | $105.00 | $127.57 | $144.00 | $126.69 | $151.00 |
| 75 | Concrete pavement (8 inch) (412-00800) | SY | 21 | $37.00 | $112.36 | $1,055.00 | $137.72 | $258.00 |
| 76 | Geotextile (erosion control) (class 1) (420-00102) | SY | 397 | $10.80 | $5.10 | $16.00 | $6.34 | $63.00 |
| 77 | Drilled shaft (18 inch) (503-00018) | LF | 10 | $227.97 | $1,020.20 | $1,055.00 | $1,275.15 | $1,285.00 |
| 78 | Drilled shaft (36 inch) (503-00036) | LF | 38 | $1,244.30 | $1,428.28 | $1,478.00 | $1,785.22 | $1,800.00 |
| 79 | Riprap (9 inch) (506-00209) | CY | 105 | $168.82 | $367.26 | $275.00 | $456.79 | $518.00 |
| 80 | Riprap (12 inch) (506-00212) | CY | 49 | $283.86 | $392.76 | $221.00 | $488.52 | $505.00 |
| 81 | Concrete class B (601-01000) | CY | 36 | $1,614.54 | $3,264.50 | $3,060.00 | $4,060.39 | $1,935.00 |
| 82 | Reinforcing steel (602-00000) | LB | 1,436 | $3.87 | $3.06 | $4.75 | $3.81 | $2.50 |
| 83 | Welded wire fabric (602-00210) | SY | 4 | $86.91 | $25.50 | $400.00 | $31.72 | $385.00 |
| 84 | 18 inch reinforced concrete pipe (complete in place) (603-01185) | LF | 42 | $112.02 | $438.67 | $1,845.00 | $545.62 | $725.00 |
| 85 | 24 inch reinforced concrete pipe (complete in place) 00 (603-01245) | LF | 1,833 | $184.26 | $540.68 | $1,071.00 | $672.50 | $438.15 |
| 86 | 30 inch reinforced concrete pipe (complete in place) (603-01305) | LF | 448 | $230.21 | $550.88 | $1,161.00 | $685.19 | $516.75 |
| 87 | 36 inch reinforced concrete pipe (complete in place) (603-01365) | LF | 254 | $333.64 | $571.29 | $1,012.00 | $710.57 | $677.85 |
| 88 | 60 inch reinforced concrete pipe (complete in place) (603-01605) | LF | 132 | $902.99 | $1,407.82 | $2,530.00 | $1,751.04 | $1,650.00 |
| 89 | 18 inch reinforced concrete end section (603-05018) | EACH | 2 | $1,928.16 | $2,907.45 | $2,850.00 | $3,616.29 | $7,435.00 |
| 90 | 24 inch reinforced concrete end section (603-05024) | EACH | 21 | $2,272.89 | $3,876.59 | $3,167.00 | $4,821.72 | $6,455.00 |
| 91 | 30 inch reinforced concrete end section (603-05030) | EACH | 7 | $1,139.70 | $4,284.66 | $3,590.00 | $5,329.27 | $8,300.00 |
| 92 | 36 inch reinforced concrete end section (603-05036) | EACH | 3 | $1,427.00 | $4,896.75 | $4,434.00 | $6,090.59 | $11,690 |
| 93 | Place 24 inch steel end section (603-32024) | EACH | 2 | $3,000.00 | $2,244.34 | $1,900.00 | $2,791.52 | $6,550.00 |
| 94 | Inlet type C (5 foot) (604-00305) | EACH | 1 | $6,378.94 | $6,120.94 | $7,495.00 | $7,613.24 | $12,150 |
| 95 | Inlet type D (5 foot) (604-00505) | EACH | 3 | $3,967.33 | $7,141.10 | $9,500.00 | $8,882.11 | $17,150 |
| 96 | Inlet type D (10 foot) (604-00510) | EACH | 1 | $4,967.81 | $7,549.16 | $12,655 | $9,389.66 | $26,175 |
| 97 | Inlet type 13 (5 foot) (604-13005) | EACH | 1 | $6,401.87 | $5,916.91 | $9,700.00 | $7,359.46 | $13,000 |
| 98 | Inlet type R L 10 (5 foot) (604-19205) | EACH | 1 | $5,562.46 | $11,222 | $15,800 | $13,958 | $21,000 |
| 99 | Manhole slab base (5 foot) (604-30005) | EACH | 2 | $5,492.24 | $7,141.10 | $9,250.00 | $8,882.11 | $23,000 |
| 100 | Manhole special (604-39000) | EACH | 1 | $15,820 | $15,303 | $23,000 | $8,882.11 | $35,950 |
| 101 | Guardrail type 3 (31 inch midwest guardrail system) (606-00302) | LF | 1,870 | $55.00 | $35.03 | $49.00 | $59.13 | $60.75 |
| 102 | End anchorage type 3B (606-01320) | EACH | 1 | $1,312.91 | $1,287.88 | $5,230.00 | $6,293.61 | $6,500.00 |
| 103 | End anchorage (nonflared) (606-02003) | EACH | 4 | $2,441.03 | $3,482.42 | $6,100.00 | $7,435.59 | $7,625.00 |
| 104 | End anchorage (flared) (606-02005) | EACH | 5 | $4,743.16 | $3,554.55 | $6,900.00 | $8,330.15 | $8,545.00 |
| 105 | Fence (plastic) (607-11525) | LF | 3,449 | $2.73 | $3.38 | $5.25 | $2.82 | $2.40 |
| 106 | 3 foot gate (607-60103) | EACH | 1 | $5,000.00 | $3,606.06 | $1,950.00 | $1,922.15 | $2,400.00 |
| 107 | Road closure gate (607-60620) | EACH | 1 | $21,413 | $51,010 | $52,500 | $56,704 | $64,000 |
| 108 | Concrete sidewalk (608-00000) | SY | 18 | $207.30 | $101.96 | $600.00 | $124.97 | $386.50 |
| 109 | Concrete curb ramp (608-00010) | SY | 184 | $223.56 | $145.66 | $453.00 | $178.52 | $206.25 |
| 110 | Detectable warnings (608-00015) | SF | 288 | $49.28 | $104.04 | $76.00 | $127.52 | $96.65 |
| 111 | Curb and gutter type 2 (section I-B) (609-21010) | LF | 113 | $43.20 | $59.30 | $137.00 | $72.68 | $58.00 |
| 112 | Curb and gutter type 2 (section II-B) (609-21020) | LF | 310 | $54.77 | $55.14 | $142.00 | $67.58 | $64.50 |
| 113 | Gutter type 2 (4 foot) (609-24004) | LF | 112 | $70.69 | $90.52 | $450.00 | $110.94 | $103.00 |
| 114 | Gutter type 2 (8 foot) (609-24008) | LF | 27 | $70.55 | $145.66 | $750.00 | $178.52 | $155.00 |
| 115 | Curb type 6 (section M) (609-60011) | LF | 2,025 | $21.00 | $24.84 | $14.50 | $19.14 | $47.50 |
| 116 | Median cover material (patterned concrete) (610-00020) | SF | 457 | $16.61 | $28.09 | $83.00 | $34.43 | $25.80 |
| 117 | Delineator (type I) (612-00001) | EACH | 255 | $31.37 | $35.03 | $27.00 | $43.25 | $49.50 |
| 118 | Delineator (type II) (612-00002) | EACH | 30 | $34.24 | $35.03 | $31.00 | $43.25 | $44.40 |
| 119 | Delineator (type III) (612-00003) | EACH | 35 | $38.64 | $35.03 | $34.00 | $43.25 | $44.40 |
| 120 | Delineator (type I) (extra height) (612-00031) | EACH | 20 | $49.66 | $70.06 | $55.00 | $86.50 | $88.75 |
| 121 | Delineator (type III) (extra height) (612-00033) | EACH | 20 | $40.94 | $70.06 | $64.00 | $86.50 | $88.75 |
| 122 | Location marker (fiber optic)(dome) (612-00260) | EACH | 3 | $328.17 | $178.54 | $185.00 | $223.15 | $225.50 |
| 123 | Location marker (utility)(flat slat) (612-00270) | EACH | 8 | $83.67 | $178.54 | $185.00 | $223.15 | $225.50 |
| 124 | 2 inch electrical conduit (bored) (613-00206) | LF | 1,665 | $46.92 | $96.92 | $100.00 | $121.14 | $122.50 |
| 125 | 3 inch electrical conduit (bored) (613-00306) | LF | 440 | $87.06 | $112.22 | $116.00 | $140.27 | $141.75 |
| 126 | 2 inch electrical conduit (plastic) (613-01200) | LF | 1,235 | $22.92 | $35.71 | $37.00 | $44.63 | $45.10 |
| 127 | 3 inch electrical conduit (plastic) (613-01300) | LF | 410 | $22.11 | $40.81 | $42.00 | $51.01 | $51.55 |
| 128 | Electrical system modifications (613-04100) | LS | 1 | $12,000 | $3,774.75 | $3,900.00 | $4,718.07 | $4,775.00 |
| 129 | Type one pull box (613-07001) | EACH | 21 | $973.15 | $1,683.33 | $1,741.00 | $2,104.00 | $2,130.00 |
| 130 | Type four pull box (613-07004) | EACH | 6 | $1,945.44 | $3,723.74 | $3,800.00 | $4,654.31 | $4,700.00 |
| 131 | Type five pull box (613-07005) | EACH | 3 | $1,075.48 | $5,611.11 | $5,800.00 | $7,013.35 | $7,085.00 |
| 132 | Wiring (613-10000) | LS | 1 | $70,000 | $35,707 | $36,000 | $44,630 | $45,102 |
| 133 | Luminaire (LED) (8,000 lumens) (613-13008) | EACH | 2 | $1,086.99 | $816.16 | $850.00 | $1,020.12 | $1,030.00 |
| 134 | Meter power pedestal (613-50109) | EACH | 1 | $10,974 | $11,222 | $11,600 | $14,027 | $14,175 |
| 135 | Troubleshooting (613-60700) | HR | 124 | $195.06 | $204.04 | $211.00 | $255.03 | $257.75 |
| 136 | Safety switch NEMA 3R, 30 ampere, 2- pole, 240 volt (613-81699) | EACH | 1 | $1,933.42 | $2,346.46 | $2,448.00 | $2,932.86 | $2,975.00 |
| 137 | Sign panel (class I) (614-00011) | SF | 1,181 | $26.22 | $25.76 | $29.50 | $31.80 | $32.50 |
| 138 | Sign panel (class II) (614-00012) | SF | 1,057 | $31.50 | $39.15 | $37.00 | $48.34 | $49.75 |
| 139 | Sign panel (class III) (614-00013) | SF | 129 | $44.70 | $49.45 | $42.00 | $61.06 | $62.75 |
| 140 | Steel signpost (W 6X15) (614-00615) | LF | 29 | $113.44 | $164.85 | $137.00 | $203.52 | $209.00 |
| 141 | Steel signpost (W 8X18) (614-00818) | LF | 71 | $56.06 | $185.45 | $162.00 | $782.29 | $235.00 |
| 142 | Steel sign support (2-1/2 inch round NP- 40)(post & slipbase) (614-01573) | EACH | 100 | $535.75 | $633.64 | $653.00 | $782.29 | $800.00 |
| 143 | Concrete footing (type 2) (614-03002) | EACH | 2 | $1,262.31 | $3,606.06 | $2,586.00 | $4,452.05 | $4,570.00 |
| 144 | Concrete footing (type 3) (614-03003) | EACH | 4 | $1,282.35 | $3,863.64 | $3,167.00 | $4,770.05 | $4,900.00 |
| 145 | CWDM multiplexor demultiplexor module (614-70026) | EACH | 2 | $9,182.27 | $9,793.94 | $10,135 | $12,241 | $12,370 |
| 146 | CWDM SFP optic module (614-70028) | EACH | 4 | $993.85 | $1,224.24 | $1,265.00 | $1,530.19 | $1,550.00 |
| 147 | Optical filter (614-70032) | EACH | 4 | $740.88 | $1,428.28 | $1,478.00 | $1,785.22 | $1,800.00 |
| 148 | Pedestrian signal face (16) (countdown) (614-70150) | EACH | 4 | $1,015.02 | $994.70 | $1,029.00 | $1,243.28 | $1,260.00 |
| 149 | Traffic signal face (12-12-12) (614-70336) | EACH | 12 | $1,015.64 | $1,581.31 | $1,636.00 | $1,976.49 | $2,000.00 |
| 150 | Conflict monitor (614-72836) | EACH | 1 | $1,395.62 | $1,530.30 | $1,583.00 | $1,912.73 | $1,950.00 |
| 151 | Traffic signal controller cabinet (614-72855) | EACH | 1 | $31,409 | $27,035 | $27,977 | $33,792 | $34,000 |
| 152 | Pedestrian push button (614-72860) | EACH | 4 | $248.11 | $1,683.33 | $1,741.00 | $2,104.00 | $2,125.00 |
| 153 | Pedestrian push button post assembly (614-72863) | EACH | 1 | $1,776.02 | $1,938.38 | $2,000.00 | $2,422.79 | $2,450.00 |
| 154 | Loop detector wire (614-72875) | LF | 1,200 | $3.25 | $21.42 | $22.00 | $26.78 | $27.00 |
| 155 | Traffic signal vehicle detector (micro wave type) (614-72884) | EACH | 4 | $8,805.06 | $12,855 | $13,300 | $16,067 | $16,240 |
| 156 | Traffic signal vehicle detector (special) (614-72885) | EACH | 1 | $14,110 | $11,732 | $12,140 | $14,664 | $14,820 |
| 157 | Microwave vehicle radar detector (614-72887) | EACH | 1 | $20,155 | $13,518 | $13,988 | $16,896 | $17,075 |
| 158 | Rectangular rapid flashing beacon (614-80003) | EACH | 4 | $8,686.07 | $10,712 | $11,085 | $13,389 | $13,530 |
| 159 | Rumble strip (614-80385) | LF | 76,153 | $3.12 | $0.19 | $0.30 | $0.23 | $0.35 |
| 160 | Traffic signal-light pole steel (1-50 foot mast arm) (614-81150) | EACH | 1 | $35,000 | $26,015 | $26,920 | $32,516 | $32,860 |
| 161 | Traffic signal-light pole steel (1-55 foot mast arm) (614-81155) | EACH | 1 | $40,000 | $26,525 | $27,500 | $33,154 | $33,504 |
| 162 | Traffic signal pedestal pole steel (614-84000) | EACH | 2 | $6,560.62 | $4,386.87 | $4,500.00 | $5,483.16 | $5,550.00 |
| 163 | Telemetry (field) (614-86105) | EACH | 2 | $8,489.76 | $2,346.46 | $2,428.00 | $2,932.86 | $2,975.00 |
| 164 | Traffic signal controller (type 2070LC) (614-86248) | EACH | 3 | $7,853.71 | $9,181.82 | $9,500.00 | $11,476 | $11,600 |
| 165 | Uninterrupted power supply (614-86800) | EACH | 2 | $7,076.90 | $10,202 | $10,500 | $12,752 | $12,890 |
| 166 | Fiber optic cable (single mode) (12 fiber) (614-87010) | LF | 325 | $8.99 | $5.10 | $5.25 | $6.38 | $6.50 |
| 167 | Buffer tube fan out kit (614-87015) | EACH | 1 | $583.79 | $127.53 | $131.00 | $159.39 | $161.10 |
| 168 | Fiber optic termination panel (24 fiber) (614-87024) | EACH | 1 | $2,477.26 | $714.14 | $739.00 | $892.61 | $902.05 |
| 169 | Automatic traffic recording station (614-87100) | EACH | 1 | $18,758 | $22,444 | $23,255 | $28,053 | $28,350 |
| 170 | Closed circuit television (614-87320) | EACH | 2 | $6,781.49 | $6,835.35 | $7,000.00 | $8,543.53 | $8,635.00 |
| 171 | Test fiber optic cable (614-87350) | LS | 1 | $20,000 | $3,570.71 | $3,695.00 | $4,463.04 | $4,510.00 |
| 172 | Fiber optic cable (single mode) (96 strands) (614-87496) | LF | 1,320 | $9.21 | $7.14 | $7.25 | $8.93 | $9.00 |
| 173 | Ethernet switch type II (614-87692) | EACH | 1 | $10,467 | $9,079.80 | $9,396.00 | $11,349 | $11,500 |
| 174 | Field office (class 2) (620-00002) | EACH | 1 | $21,740 | $38,664 | $30,737 | $69,160 | $140,000 |
| 175 | Field laboratory (class 2) (620-00012) | EACH | 1 | $16,429 | $31,889 | $26,000 | $58,104 | $106,730 |
| 176 | Sanitary facility (620-00020) | EACH | 2 | $3,806.88 | $3,825.00 | $11,401 | $4,836.79 | $24,800 |
| 177 | Construction surveying (625-00000) | LS | 1 | $75,000 | $128,788 | $48,000 | $133,126 | $120,000 |
| 178 | Mobilization (626-00000) | LS | 1 | $2,059,753 | $749,650 | $1,100,000 | $1,077,859 | $2,038,546 |
| 179 | Public information management (tier III) (626-01113) | DAY | 200 | $74.18 | $151.52 | $81.00 | $186.56 | $95.00 |
| 180 | Modified epoxy pavement marking (627-00008) | GAL | 766 | $141.53 | $190.61 | $146.00 | $175.74 | $241.00 |
| 181 | Pavement marking paint (high build)(temporary) (627-00016) | GAL | 903 | $133.00 | $108.18 | $100.00 | $121.18 | $137.00 |
| 182 | Preformed plastic pavement marking (type I)(inlaid) (627-01010) | SF | 3,164 | $22.55 | $23.44 | $23.00 | $27.60 | $29.75 |
| 183 | Preformed thermoplastic pavement marking (word-symbol) (627-30405) | SF | 877 | $19.98 | $24.47 | $22.00 | $26.33 | $30.95 |
| 184 | Preformed thermoplastic pavement marking (shield) (627-30408) | SF | 814 | $26.73 | $29.36 | $34.00 | $40.60 | $37.10 |
| 185 | Preformed thermoplastic pavement marking (xwalk-stop line) (627-30410) | SF | 952 | $16.41 | $18.55 | $17.50 | $21.25 | $23.50 |
| 186 | Flagging (630-00000) | HR | 500 | $42.00 | $48.94 | $63.00 | $49.98 | $62.00 |
| 187 | Uniformed traffic control (630-00003) | HR | 800 | $146.00 | $123.64 | $221.00 | $288.32 | $156.00 |
| 188 | Uniformed traffic control (vehicle) (630-00006) | HR | 800 | $93.00 | $123.64 | $58.00 | $76.89 | $156.00 |
| 189 | Traffic control inspection (630-00007) | DAY | 60 | $500.00 | $324.55 | $500.00 | $640.72 | $415.00 |
| 190 | Traffic control management (630-00012) | DAY | 126 | $1,500.00 | $1,493.94 | $1,794.00 | $1,922.15 | $5,875.00 |
| 191 | Flashing beacon (solar) (630-80002) | EACH | 7 | $716.09 | $669.70 | $1,698.00 | $2,306.58 | $850.00 |
| 192 | Barricade (type 3 M-B) (temporary) (630-80336) | EACH | 10 | $231.41 | $334.85 | $843.00 | $256.29 | $425.00 |
| 193 | Construction traffic sign (panel size A) (630-80341) | EACH | 144 | $51.46 | $61.82 | $110.00 | $57.66 | $78.30 |
| 194 | Construction traffic sign (panel size B) (630-80342) | EACH | 86 | $65.36 | $72.12 | $116.00 | $64.07 | $91.35 |
| 195 | Construction traffic sign (panel size C) (630-80343) | EACH | 26 | $74.02 | $82.42 | $126.00 | $76.89 | $104.40 |
| 196 | Portable message sign panel (630-80355) | EACH | 5 | $5,518.20 | $11,848 | $22,384 | $20,260 | $15,000 |
| 197 | Advance warning flashing or sequencing arrow panel (C type) (630-80358) | EACH | 3 | $1,141.64 | $2,472.73 | $2,600.00 | $4,290.25 | $3,135.00 |
| 198 | Drum channelizing device (630-80360) | EACH | 350 | $40.89 | $46.36 | $42.00 | $64.07 | $58.75 |
| 199 | Barrier (temporary) (630-80370) | LF | 1,400 | $80.00 | $51.10 | $252.00 | $59.29 | $58.00 |
| 200 | Traffic cone (630-80380) | EACH | 175 | $8.47 | $15.45 | $15.50 | $5.13 | $19.60 |
| 201 | Stackable vertical panels (630-80393) | EACH | 50 | $28.91 | $46.36 | $37.00 | $64.07 | $58.75 |
| 202 | Mobile pavement marking zone (630-80511) | LS | 1 | $20,000 | $12,879 | $10,558 | $12,689 | $16,270 |
| 203 | Impact attenuator (temporary) (630-85010) | EACH | 2 | $4,744.72 | $8,757.58 | $11,000 | $10,251 | $11,100 |
| 204 | Mobile attenuator (630-85041) | DAY | 65 | $1,500.00 | $875.76 | $1,300.00 | $1,742.75 | $1,105.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
Every contract let that day: CDOT letting of March 27, 2025. Compiled by Mirage Metrics.