Kilgore Companies, LLC dba Elam Construction: CDOT bid record

Kilgore Companies, LLC dba Elam Construction submitted 10 bids on Colorado DOT contracts in the data, from 12 SEP 2024 to 11 DEC 2025, and was the low bidder on 4 of them (40%). When it was not low, its total sat a median +12% above the low bid.

Owner
Colorado DOT
Low bid volume
$33,327,472
Latest bid
11 DEC 2025
Data through
10 SEP 2026
10Bids
4Low bids
40Win rate, percent
+12%Median gap to the low bid when not low, 6 bids

By year

YearBidsLow bidsWin rate
20246350%
20254125%
Kilgore Companies, LLC dba Elam Construction, CDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 35240%
Region 53267%
Region 1100%
Kilgore Companies, LLC dba Elam Construction, CDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Removal of end anchorage202-01300EACH109 (90%)$422.25$500.00
Field office (class 2)620-00002EACH99 (100%)$27,910$57,203
Traffic cone630-80380EACH107 (70%)$5.62$13.00
Removal of guardrail type 3202-01130LF107 (70%)$5.72$8.10
Flagging630-00000HR106 (60%)$46.34$48.00
Drum channelizing device630-80360EACH106 (60%)$33.23$44.00
Blading203-01500HR96 (67%)$190.00$198.00
Delineator (type III)612-00003EACH96 (67%)$42.00$50.30
Delineator (type I)612-00001EACH96 (67%)$35.10$49.50
Removal of delineator202-00090EACH86 (75%)$9.50$20.00
Emulsified asphalt (slow-setting)411-10255GAL86 (75%)$3.12$6.00
Guardrail type 3 (31 inch midwest guardrail system)606-00302LF76 (86%)$42.00$46.98
Kilgore Companies, LLC dba Elam Construction, CDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Oldcastle SW Group, Inc.106 of 10
FNF Construction, Inc.10 of 1
Kiewit Infrastructure Co.10 of 1
Martin Marietta Materials, Inc.10 of 1
Brannan Sand and Gravel, LLC10 of 1
Kilgore Companies, LLC dba Elam Construction, CDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
11 DEC 2025C25682This project is located along us 40 between mp 111.5 to mp 126.5. the project will overlay the roadway with a 1" leveling layer and a 1.5" t2 of 2$13,944,373+16%
27 MAR 2025C23177Region 1US 40 - EMPIRE JUNCTION TO BERTHOD PASS BEGINNING AT M.P. 252 AND EXTENDING TO M.P. 258.3. THIS PROJECT CONSISTS OF REMOVING 2.5" OF EXISTIN2 of 4$14,634,409+24%
27 MAR 2025C26762ARegion 3THIS PROJECT IS LOCATED ON SH 141 FROM MP 107 TO 120 IN MESA COUNTY. THE WORK CONSISTS OF 1" HMA LEVELING COURSE AND 2" HMA OVERLAY. THE PRO1 of 2$7,979,768Low, 9.0% under the second
06 FEB 2025C25802Region 3US 40 MP 215.90 - 219.88 IN GRAND COUNTY Safety improvement project located on US 40 from MM 215.90 extending to MM 219.88. Resurfacing will2 of 2$6,283,967+8.0%
12 DEC 2024C26140Region 3MP226.5 - MP 233.0 GRAND COUNTY2 of 3$4,987,875+3.0%
21 NOV 2024C20624Region 5This project is located in Region 5, on SH 112 between mileposts 0 (Junction of US 160) and 13.2 (Junction of US 285) in Rio Grande County. 2 of 2$12,759,312+1.0%
07 NOV 2024C25141Region 3RESURFACING OF SH 82 MM 78.0-85.3 IN LAKE COUNTY, GUARDRAIL REPLACEMENT AND BRIDGE REHABILITATION ON STRUCTURE H-11-A.1 of 2$4,919,411Low, 12% under the second
31 OCT 2024C24936Region 5Project 267 151A-011 is a rural road surface treatment project. This project is a 2.5" overlay from MM 12.8 to MM 26, and includes replaceme1 of 3$7,767,133Low, 4.0% under the second
24 OCT 2024C24971Region 5US 160 TREASURE FALLS TO WC SURFACE TREATMENT PROJECT INCLUDES: ASPHALT LEVELING AND OVERLAY GUARDRAIL REPLACEMENT SIGN PANEL REPLACEMENT RE1 of 2$12,661,160Low, 13% under the second
12 SEP 2024C25236Region 325236 SH65 ORCHARD CITY S. MP 0-6.5 RURAL RD2 of 2$5,096,892+16%
Kilgore Companies, LLC dba Elam Construction: latest CDOT bids in the data

How this record was read

CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; CDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy