Kilgore Companies, LLC dba Elam Construction: CDOT bid record
Kilgore Companies, LLC dba Elam Construction submitted 10 bids on Colorado DOT contracts in the data, from 12 SEP 2024 to 11 DEC 2025, and was the low bidder on 4 of them (40%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Colorado DOT
- Low bid volume
- $33,327,472
- Latest bid
- 11 DEC 2025
- Data through
- 10 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 6 | 3 | 50% |
| 2025 | 4 | 1 | 25% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 3 | 5 | 2 | 40% |
| Region 5 | 3 | 2 | 67% |
| Region 1 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Removal of end anchorage | 202-01300 | EACH | 10 | 9 (90%) | $422.25 | $500.00 |
| Field office (class 2) | 620-00002 | EACH | 9 | 9 (100%) | $27,910 | $57,203 |
| Traffic cone | 630-80380 | EACH | 10 | 7 (70%) | $5.62 | $13.00 |
| Removal of guardrail type 3 | 202-01130 | LF | 10 | 7 (70%) | $5.72 | $8.10 |
| Flagging | 630-00000 | HR | 10 | 6 (60%) | $46.34 | $48.00 |
| Drum channelizing device | 630-80360 | EACH | 10 | 6 (60%) | $33.23 | $44.00 |
| Blading | 203-01500 | HR | 9 | 6 (67%) | $190.00 | $198.00 |
| Delineator (type III) | 612-00003 | EACH | 9 | 6 (67%) | $42.00 | $50.30 |
| Delineator (type I) | 612-00001 | EACH | 9 | 6 (67%) | $35.10 | $49.50 |
| Removal of delineator | 202-00090 | EACH | 8 | 6 (75%) | $9.50 | $20.00 |
| Emulsified asphalt (slow-setting) | 411-10255 | GAL | 8 | 6 (75%) | $3.12 | $6.00 |
| Guardrail type 3 (31 inch midwest guardrail system) | 606-00302 | LF | 7 | 6 (86%) | $42.00 | $46.98 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Oldcastle SW Group, Inc. | 10 | 6 of 10 |
| FNF Construction, Inc. | 1 | 0 of 1 |
| Kiewit Infrastructure Co. | 1 | 0 of 1 |
| Martin Marietta Materials, Inc. | 1 | 0 of 1 |
| Brannan Sand and Gravel, LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 11 DEC 2025 | C25682 | This project is located along us 40 between mp 111.5 to mp 126.5. the project will overlay the roadway with a 1" leveling layer and a 1.5" t | 2 of 2 | $13,944,373 | +16% | |
| 27 MAR 2025 | C23177 | Region 1 | US 40 - EMPIRE JUNCTION TO BERTHOD PASS BEGINNING AT M.P. 252 AND EXTENDING TO M.P. 258.3. THIS PROJECT CONSISTS OF REMOVING 2.5" OF EXISTIN | 2 of 4 | $14,634,409 | +24% |
| 27 MAR 2025 | C26762A | Region 3 | THIS PROJECT IS LOCATED ON SH 141 FROM MP 107 TO 120 IN MESA COUNTY. THE WORK CONSISTS OF 1" HMA LEVELING COURSE AND 2" HMA OVERLAY. THE PRO | 1 of 2 | $7,979,768 | Low, 9.0% under the second |
| 06 FEB 2025 | C25802 | Region 3 | US 40 MP 215.90 - 219.88 IN GRAND COUNTY Safety improvement project located on US 40 from MM 215.90 extending to MM 219.88. Resurfacing will | 2 of 2 | $6,283,967 | +8.0% |
| 12 DEC 2024 | C26140 | Region 3 | MP226.5 - MP 233.0 GRAND COUNTY | 2 of 3 | $4,987,875 | +3.0% |
| 21 NOV 2024 | C20624 | Region 5 | This project is located in Region 5, on SH 112 between mileposts 0 (Junction of US 160) and 13.2 (Junction of US 285) in Rio Grande County. | 2 of 2 | $12,759,312 | +1.0% |
| 07 NOV 2024 | C25141 | Region 3 | RESURFACING OF SH 82 MM 78.0-85.3 IN LAKE COUNTY, GUARDRAIL REPLACEMENT AND BRIDGE REHABILITATION ON STRUCTURE H-11-A. | 1 of 2 | $4,919,411 | Low, 12% under the second |
| 31 OCT 2024 | C24936 | Region 5 | Project 267 151A-011 is a rural road surface treatment project. This project is a 2.5" overlay from MM 12.8 to MM 26, and includes replaceme | 1 of 3 | $7,767,133 | Low, 4.0% under the second |
| 24 OCT 2024 | C24971 | Region 5 | US 160 TREASURE FALLS TO WC SURFACE TREATMENT PROJECT INCLUDES: ASPHALT LEVELING AND OVERLAY GUARDRAIL REPLACEMENT SIGN PANEL REPLACEMENT RE | 1 of 2 | $12,661,160 | Low, 13% under the second |
| 12 SEP 2024 | C25236 | Region 3 | 25236 SH65 ORCHARD CITY S. MP 0-6.5 RURAL RD | 2 of 2 | $5,096,892 | +16% |
How this record was read
CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; CDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.