Kiewit Infrastructure Co. submitted 18 bids on Colorado DOT contracts in the data, from 13 FEB 2024 to 11 FEB 2026, and was the low bidder on 5 of them (28%). When it was not low, its total sat a median +25% above the low bid.

Owner
Colorado DOT
Low bid volume
$92,910,837
Latest bid
11 FEB 2026
Data through
10 SEP 2026
18Bids
5Low bids
28Win rate, percent
+25%Median gap to the low bid when not low, 12 bids

By year

YearBidsLow bidsWin rate
202416531%
2026200%
Kiewit Infrastructure Co., CDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 1600%
Region 2500%
Region 4100%
Region 3100%
Kiewit Infrastructure Co., CDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Sweeping (sediment removal)208-00106HR107 (70%)$142.50$200.00
Sanitary facility620-00020EACH126 (50%)$3,250.00$4,760.00
Emulsified asphalt (slow-setting)411-10255GAL96 (67%)$4.00$6.00
Construction traffic sign (panel size B)630-80342EACH115 (45%)$63.00$66.50
Erosion control management208-00207DAY55 (100%)$50.00$410.00
Drum channelizing device630-80360EACH94 (44%)$49.00$44.00
Field office (class 2)620-00002EACH84 (50%)$50,000$57,203
Pre-fabricated vehicle tracking pad208-00075EACH64 (67%)$1,750.00$6,000.00
Adjust manhole210-04010EACH54 (80%)$650.00$1,475.00
Construction traffic sign (panel size A)630-80341EACH113 (27%)$50.00$55.00
Traffic control inspection630-00007DAY113 (27%)$350.00$350.00
Portable message sign panel630-80355EACH103 (30%)$6,000.00$6,713.65
Kiewit Infrastructure Co., CDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Oldcastle SW Group, Inc.74 of 7
Martin Marietta Materials, Inc.55 of 5
Brannan Sand and Gravel, LLC44 of 4
Capital Paving & Construction, LLC22 of 2
Native Sun Materials Inc21 of 2
Myers & Sons Construction, LLC21 of 2
Structures, Inc.22 of 2
Rodriguez Construction Org., LLC20 of 2
Asphalt Specialties Co., Inc.21 of 2
Ames Construction Incorporated22 of 2
Kiewit Infrastructure Co., CDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
11 FEB 2026C27393Region 1Permanent repairs to structure F-16-YE (Southbound Santa Fe to Eastbound C470 Flyover ) Site Number: 00 Days Road User Cost Per Time Unit: $3 of 3$2,845,303+127%
30 JAN 2026C27376ARegion 1Repairs to structure F-16-YE (Southbound Santa Fe to Eastbound C470 Flyover -The scope of work will include the installation of a temporary 3 of 3$5,119,102+309%
19 DEC 2024C19934Region 1US85 SANTA FE FLORIDA TO I-255 of 6$4,390,670+33%
19 DEC 2024C25080RRegion 2SH 67 - MP 76.92 TO MP 78.20. SH 67 from just past Evergreen Heights Road to just before Kelley's Road will be widened to 4 lanes and a midd2 of 3$8,075,797+12%
19 DEC 2024C25465Region 2US 24 FROM FLORISSANT TO WOODLAND PARK M.P. 269.410 to M.P. 281.025 Resurface Roadway with 2.25" mill and fill. Update guardrail to MASH sta2 of 3$12,535,751+3.0%
12 DEC 2024C26140Region 3MP226.5 - MP 233.0 GRAND COUNTY3 of 3$5,756,999+19%
21 NOV 2024C25095Region 2US 285 FROM MP 220-228.83 of 3$14,833,603+19%
31 OCT 2024C23509Region 4This is primarily a resurfacing project on CO 52 from MP 54.58 to MP 60.87. Work also included in this project is shoulder widening (MP 47.94 of 5$6,040,372+16%
31 OCT 2024C23819Region 2SH 115 - M.P. 41.589 TO M.P. 47.296, Resurfacing whole corridor, replace curb ramps, replace guardrail as needed, update some pedestrian sig3 of 4$13,475,670+30%
26 SEP 2024C26438Region 1I-270 YORK BRIDGE PREVENTATIVE MAINTENANCE Resident Engineer - Chris Cameron - (720) 505-6226 - chris.cameron@state.co.us3 of 5$1,090,698+39%
25 SEP 2024C26448US 50 BLUE MESA RESERVOIR1 of 1$32,162,056Low
01 AUG 2024C25921Region 2050B LAS ANIMAS - BRIDGE STRUCTURE L-24-A / L-24-D MP 399.85 of 5$15,980,984+55%
11 JUL 2024C25140Region 1This project will be doing a full-depth replacement of the pavement of the NB chain area where trucks will be entering to de-chain only when4 of 5$2,858,528+12%
01 JUL 2024C26446RUS 50 BLUE MESA RESERVOIR1 of 1$7,757,027Low
14 JUN 2024C26430SH 50 TO SH 149 CR-251 of 1$6,944,059Low
10 MAY 2024C26401COUNTY ROAD 26 BETWEEN SH 50 TO SH 1491 of 1$5,210,291Low
09 MAY 2024C24417SRegion 1Project scope is to resurface EB and WB I-70 from Chief Hosa (MP 252.4) to Colfax (MP 258.7). The resurfacing project will include mill and 5 of 5$48,986,718+41%
13 FEB 2024C24896The Vail Pass Aux Phase I CP5 project is located along I-70 MP 184-186 in Eagle County. This construction package includes the removal of ex1 of 1$40,837,404Low
Kiewit Infrastructure Co.: latest CDOT bids in the data

How this record was read

CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; CDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way