Structures, Inc.: CDOT bid record

Structures, Inc. submitted 20 bids on Colorado DOT contracts in the data, from 01 AUG 2024 to 02 MAR 2026, and was the low bidder on 7 of them (35%). When it was not low, its total sat a median +25% above the low bid.

Owner
Colorado DOT
Low bid volume
$34,107,116
Latest bid
02 MAR 2026
Data through
10 SEP 2026
20Bids
7Low bids
35Win rate, percent
+25%Median gap to the low bid when not low, 13 bids

By year

YearBidsLow bidsWin rate
20248338%
202511436%
2026100%
Structures, Inc., CDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 19556%
Region 44125%
Region 2300%
Region 53133%
Region 3100%
Structures, Inc., CDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Sweeping (sediment removal)208-00106HR1410 (71%)$119.32$200.00
Sanitary facility620-00020EACH179 (53%)$3,014.00$4,760.00
Traffic control inspection630-00007DAY187 (39%)$326.00$350.00
Mycorrhizae212-00704LB135 (38%)$21.38$20.00
Removal of nests240-00010HR135 (38%)$187.55$212.01
Reinforcing steel (epoxy coated)602-00020LB115 (45%)$2.47$2.50
Traffic control management630-00012DAY194 (21%)$1,311.67$1,500.00
Portable message sign panel630-80355EACH124 (33%)$10,800$6,713.65
Vertical panel630-80350EACH114 (36%)$49.50$38.50
Impact attenuator (temporary)630-85010EACH114 (36%)$7,008.00$8,897.86
Bridge expansion device (0-4 inch)518-01004LF74 (57%)$489.93$645.00
Organic fertilizer212-00700LB73 (43%)$1.57$2.25
Structures, Inc., CDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Myers & Sons Construction, LLC156 of 15
Abco Contracting, Inc.104 of 10
Lobato Construction, LLC53 of 5
Native Sun Materials Inc42 of 4
FNF Construction, Inc.41 of 4
Jalisco International, Inc.31 of 3
HCG Construction LLC31 of 3
Kiewit Infrastructure Co.20 of 2
Rodriguez Construction Org., LLC21 of 2
W.W. Clyde & Co.21 of 2
Structures, Inc., CDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
02 MAR 2026C27259Region 1This project will address emergency erosion at 2 locations near US 40 and Tonn Valley Drive. One location is located within CDOT ROW off of 2 of 2$566,879+31%
21 AUG 2025C26632Region 4Remove and replace bridge rail on SH157 MP3.518 D-16-DG AND I70 MP329.74 F-20-BF Remove and replace adjacent guardrail, remove and replace s4 of 4$769,712+26%
24 JUL 2025C26934comboRegion 1Bridge Repairs on east I-70 in Arapahoe County, near Deer Trail. Work includes repairs of bridge decks at four structures, including hydrode1 of 4$7,235,023Low, 4.0% under the second
05 JUN 2025C25575Region 1US 40 IN DEER TRAIL, PINE ST TO BURTON ST3 of 5$720,968+7.0%
22 MAY 2025C26607Region 1This project is located in Region 1 in Arapahoe County. Project work consists of milling, waterproofing membrane, paving, remove and replace1 of 3$2,780,679Low, 5.0% under the second
01 MAY 2025C25564Region 5Three timber structures throughout Region 5 will be rehabilitated by installing HSS members adjacent to existing timber stringers. The three1 of 4$963,303Low, 9.0% under the second
28 FEB 2025C26678Region 5SH 141 MP 85.5 K-01-B BRIDGE REPAIR4 of 4$2,790,262+34%
27 FEB 2025C25860Region 4This project is located in Region 4 in Weld County and Morgan Counties. The project consists of bridge preventative maintenance of structure4 of 6$3,799,919+17%
06 FEB 2025C25624Region 1The R1 Expansion Joint Repairs at Railroads project includes the removal and replacement of expansion devices, joint repairs, deck repairs, 4 of 4$3,171,471+18%
30 JAN 2025C25603Region 3THIS PROJECT IS LOCATED ALONG I-70 THROUGH GLENWOOD CANYON IN GARFIELD AND EAGLE COUNTIES. THE WORK INCLUDES BRIDGE JOINT REPLACEMENTS.4 of 5$9,192,345+46%
16 JAN 2025C24278Region 1I-25 Mobility Hub in the City of Lone Tree, Douglas County. Work includes a pedestrian bridge, ramp modifications to accommodate CDOT's Bust1 of 6$16,509,889Low, 7.0% under the second
16 JAN 2025C25972Region 2Timber bridge retrofit project on 21 structures located in CDOT Region 2 on CO 9B, US 24A, US 24G, CO 67C, AND US 285D.2 of 7$2,242,122+25%
21 NOV 2024C22834Region 5This project is located on US 160 between mileposts 258.4 and 264.9 in Costilla county. The project will construct acceleration and decelera6 of 7$17,583,843+58%
21 NOV 2024C25058Region 4THIS PROJECT IS A BRIDGE PREVENTATIVE MAINTENANCE PROJECT OF 10 STRUCTURES IN REGION 4. STRUCTURES G-22-BD AND G-22-BE ON I-70 WILL RECIEVE 1 of 4$5,219,633Low, 11% under the second
21 NOV 2024C25588Region 112TH AND WADSWORTH SE QUADRANT2 of 2$729,207+36%
24 OCT 2024C26270RRegion 2This project is located in Region 2 in various counties. Project work consists of removal and replacement of signs along US 24 between Divid4 of 5$1,999,028+8.0%
17 OCT 2024C22529-COMBORegion 4THIS PROJECT CONSISTS OF THE REMOVAL AND REPLACEMENT OF FIVE SEPARATE BRIDGE LOCATIONS IN AND AROUND HOLYOKE. THREE OF THE STRUCTURES WILL B3 of 9$19,344,459+1.0%
09 OCT 2024C26599Region 1SH 72 AT 80TH AVE1 of 1$614,456Low
26 SEP 2024C26438Region 1I-270 YORK BRIDGE PREVENTATIVE MAINTENANCE Resident Engineer - Chris Cameron - (720) 505-6226 - chris.cameron@state.co.us1 of 5$784,133Low, 26% under the second
01 AUG 2024C25921Region 2050B LAS ANIMAS - BRIDGE STRUCTURE L-24-A / L-24-D MP 399.82 of 5$10,831,940+5.0%
Structures, Inc.: latest CDOT bids in the data

How this record was read

CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; CDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy