CDOT contract C27259 bid tabulation

This project will address emergency erosion at 2 locations near US 40 and Tonn Valley Drive. One location is located within CDOT ROW off of US 40 while the other location is located on private property off of Tonn Valley Drive. Work will include constructing a gabion basket drop structure and soil r. Let by Colorado DOT on March 2, 2026, Region 1. 2 bids received; low bid $433,473 by CONCRETE EXPRESS, INC.dba CEI, +14% against the engineer's estimate of $380,000.

Owner
Colorado DOT
Letting
02 MAR 2026
Pay items
45
Data through
10 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1CONCRETE EXPRESS, INC.dba CEI$433,473Low+14%
2Structures, Inc.$566,879+31%+49%
CDOT contract C27259: bids by rank

Engineer's estimate: $380,000.

Bid tabulation

LinePay itemUnitQuantityEstimate1. CONCRETE EXPRESS, INC.dba CEI2. Structures, Inc.
1Removal of debris (201-00009)CY10$2,000.00$475.00$1,498.00
2Tree trimming (202-00008)HR16$225.00$415.00$758.00
3Clean culvert (202-04002)EACH1$4,000.00$3,735.00$11,495
4Embankment material (complete in place) (203-00060)CY10$75.00$128.50$345.00
5Blading (203-01500)HR20$175.00$241.10$417.00
6Dozing (203-01550)HR20$175.00$246.95$282.00
7Combination loader (203-01594)HR20$175.00$151.20$312.00
8Potholing (203-01597)HR20$350.00$465.00$310.00
9Bed course material (206-01000)CY30$250.00$125.90$357.00
10Shoring (206-01750)LS1$5,000.00$80,000$6,300.00
11Erosion log type 1 (12 inch) (208-00002)LF800$7.50$6.60$18.00
12Erosion log type 1 (20 inch) (208-00013)LF100$10.00$9.00$32.00
13Silt fence (208-00020)LF195$3.00$4.60$14.00
14Sediment trap (208-00033)EACH1$1,000.00$6,200.00$3,777.00
15Aggregate bag (208-00035)LF130$13.00$22.20$23.00
16Pre-fabricated concrete washout structure (type 1) (208-00046)EACH2$3,200.00$9,650.00$4,724.00
17Pre-fabricated vehicle tracking pad (208-00075)EACH2$4,500.00$13,785$6,934.00
18Removal and disposal of sediment (labor) (208-00103)HR24$90.00$60.95$62.00
19Removal and disposal of sediment (equipment) (208-00105)HR24$160.00$272.55$130.00
20Sweeping (sediment removal) (208-00106)HR24$200.00$280.00$140.00
21Removal of trash (208-00107)HR24$75.00$630.00$102.00
22Reset guardrail type 3 (210-01130)LF26$45.00$68.00$369.00
23Compost (mechanically applied) (212-00701)CY14$125.00$215.55$109.00
24Mycorrhizae (212-00704)LB4$30.00$308.00$32.00
25Elemental sulfur (212-00705)LB13$8.00$61.60$4.00
26Seeding (native) broadcast (212-00708)ACRE0.20$6,720.00$24,650$4,136.00
27Spray-on mulch blanket (213-00012)ACRE0.20$7,000.00$22,170$8,426.00
28Geomembrane (420-00000)SY239$25.00$20.95$54.00
29Geotextile (drainage) (class 1) (420-00112)SY284$11.00$11.35$30.00
30Riprap (gabions) (506-00100)CY77$450.00$456.20$1,171.00
31Riprap (12 inch) (506-00212)CY13$300.00$190.95$606.00
32Soil riprap (6 inch) (506-00406)CY112$175.00$168.00$587.00
33Soil riprap (12 inch) (506-00412)CY38$325.00$172.75$797.00
34Concrete class B (601-01000)CY6.80$3,500.00$2,075.00$4,370.00
35Fence (plastic) (607-11525)LF190$3.50$4.50$7.00
36Sanitary facility (620-00020)EACH1$5,000.00$750.00$3,120.00
37Construction surveying (hourly) (625-00001)HR20$195.00$225.00$352.00
38Mobilization (626-00000)LS1$144,373$79,000$121,400
39Flagging (630-00000)HR100$60.00$60.95$38.00
40Traffic control inspection (630-00007)DAY28$150.00$460.00$322.00
41Traffic control management (630-00012)DAY5$1,300.00$1,150.00$1,492.00
42Construction traffic sign (panel size A) (630-80341)EACH2$70.00$55.50$247.00
43Construction traffic sign (panel size B) (630-80342)EACH14$90.00$155.00$337.00
44Drum channelizing device (630-80360)EACH30$45.00$95.00$42.00
45Traffic cone (630-80380)EACH100$7.00$18.50$19.00
CDOT contract C27259: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.

Every contract let that day: CDOT letting of March 2, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy