Vertical panel, CDOT 630-80350

Low bidders on CDOT contracts carried a median of $35.00 per EACH for this item, over the 24 months to 10 SEP 2026, across 54 low bids. Half of all 196 bids fell between $25.00 and $50.00.

Owner
Colorado DOT
Item
630-80350
Unit
EACH
Data through
10 SEP 2026

CDOT prints this item as “Vertical Panel”.

$35.00Low bidder's median, per EACH
$38.00Median of all bids, per EACH
54Contracts in the window
$35.49Engineer's estimate, median per EACH

By year of letting

Vertical panel, CDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20243433$35.00113$35.00
20253030$37.50109$40.00
202611$21.008$28.00

Bid prices as published, not adjusted for inflation.

By region

RegionLow bidsLow-bid medianAll bidsMedian, all bids
Region 114$39.0057$39.00
Region 216$24.7055$32.73
Region 410$37.0041$35.00
Region 56$40.2520$49.50
Region 35$27.0014$34.00
Vertical panel, CDOT: unit prices by region, last 24 months

Regions with at least three low bids, over the last 24 months.

By quantity

Quantity (EACH)Low bidsLow-bid median
1 to 2013$35.00
25 to 5014$37.00
50 to 8013$31.00
90 to 22014$33.90
Vertical panel, CDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Who is lowest on this line

BidderLines bidLowest on the line
Myers & Sons Construction, LLC137 (54%)
Structures, Inc.114 (36%)
Martin Marietta Materials, Inc.84 (50%)
CC Enterprises - Traffic Control Specialists, Inc.63 (50%)
Workzone Traffic Control, LLC53 (60%)
Oldcastle SW Group, Inc.112 (18%)
Vertical panel, CDOT: bidders most often lowest on this line

The lowest unit price on each line, whoever won the contract, over all lettings in the data, for firms with five lines or more.

Latest contracts with this item

LetContractRegionQuantityLow bidder's priceMedianEstimateBidsLow bidderSource
10 SEP 2026C27164Region 1100$21.00$28.00$30.128Jalisco International, Inc.CDOT
18 DEC 2025C24846100$44.20$44.20$35.533Martin Marietta Materials, Inc.CDOT
18 DEC 2025C26274220$35.00$38.00$35.005Oldcastle SW Group, Inc.CDOT
11 SEP 2025C24061Region 420$6.50$17.00$33.315Sturgeon Electric Company, Inc.CDOT
11 SEP 2025C26564Region 236$49.00$43.00$52.435Insituform Technologies, LLCCDOT
21 AUG 2025C26065Region 120$12.00$14.00$33.315Myers & Sons Construction, LLCCDOT
21 AUG 2025C26632Region 412$35.00$28.75$31.034Abco Contracting, Inc.CDOT
21 AUG 2025C26862Region 250$15.00$17.50$35.622Workzone Traffic Control, LLCCDOT
14 AUG 2025C25525Region 430$40.00$45.00$45.994Goodland Construction, Inc.CDOT
17 JUL 2025C26196Region 150$40.00$39.25$35.554Lighthouse Transportation Group, LLCCDOT
17 JUL 2025C26207Region 460$18.15$20.00$35.543Subsurface, IncCDOT
03 JUL 2025C26426Region 326$10.00$17.50$10.002Branson Traffic Control Company, IncCDOT
26 JUN 2025C26803Region 2150$5.00$5.00$45.361Roadsafe Traffic Systems, IncCDOT
18 JUN 2025C27057Region 420$17.00$21.00$33.312Connell Resources IncorporatedCDOT
05 JUN 2025C26391Region 1150$25.00$26.00$32.533Insituform Technologies, LLCCDOT
Latest CDOT contracts carrying Vertical panel

Filter this item by your own quantity, region and period, or check your price against it, in the CDOT explorer.

How these prices were read

CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are CDOT's own: this item is compared with CDOT contracts only.
  • Prices are bid prices, not paid prices. Use them as a reference range, never as a quote.
  • The data runs to the CDOT letting of 10 SEP 2026 and was rebuilt on 26 NOV 2026.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy