CDOT contract C24846 bid tabulation
County line to purcell blvd. Let by Colorado DOT on December 18, 2025. 3 bids received; low bid $12,305,351 by Martin Marietta Materials, Inc., -15% against the engineer's estimate of $14,400,000.
- Owner
- Colorado DOT
- Letting
- 18 DEC 2025
- Pay items
- 96
- Data through
- 10 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Martin Marietta Materials, Inc. | $12,305,351 | Low | -15% |
| 2 | Oldcastle SW Group, Inc. | $12,857,366 | +4.0% | -11% |
| 3 | Edw. C. Levy Co. | $13,586,969 | +10% | -6.0% |
Engineer's estimate: $14,400,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Martin Marietta Materials, Inc. | 2. Oldcastle SW Group, Inc. | 3. Edw. C. Levy Co. |
|---|---|---|---|---|---|---|---|
| 1 | Removal of debris (201-00005) | LS | 1 | $6,000.00 | $28,000 | $27,000 | $16,106 |
| 2 | Removal of delineator (202-00090) | EACH | 832 | $6.11 | $4.50 | $4.00 | $4.85 |
| 3 | Removal of asphalt mat (planing (202-00240) | SY | 627,008 | $1.39 | $1.70 | $2.20 | $2.37 |
| 4 | Removal of asphalt mat (planing (special (202-00246) | SY | 1,520 | $17.98 | $19.00 | $34.75 | $11.76 |
| 5 | Removal of pavement marking (202-00250) | SF | 1,500 | $3.10 | $5.60 | $5.00 | $5.56 |
| 6 | Removal of pavement marking (asphalt (202-00251) | SF | 146,540 | $0.67 | $0.65 | $0.60 | $0.64 |
| 7 | (clase 2 of portions of present structure (202-00453) | SY | 114 | $532.96 | $516.00 | $455.00 | $527.60 |
| 8 | Reeve of portions of present structure (202-00460) | SY | 23 | $1,084.12 | $1,200.00 | $1,100.00 | $944.13 |
| 9 | Removal of expansion device (202-00504) | LF | 252 | $237.70 | $50.00 | $45.00 | $144.40 |
| 10 | Removal of portions of present structure (202-00505) | SF | 150 | $438.30 | $230.00 | $210.00 | $288.79 |
| 11 | Removal of ground sign (202-00810) | EACH | 81 | $115.58 | $97.00 | $85.00 | $103.05 |
| 12 | Removal of sign panel (202-00821) | EACH | 15 | $100.68 | $60.00 | $55.00 | $66.67 |
| 13 | Removal of guardrail type 3 (202-01130) | LF | 9,175 | $4.32 | $2.20 | $6.00 | $2.23 |
| 14 | Removal of end anchorage (202-01300) | EACH | 19 | $393.98 | $520.00 | $475.00 | $530.22 |
| 15 | Removal and disposal of paint (202-05301) | SF | 690 | $225.00 | $94.00 | $42.50 | $176.44 |
| 16 | Embankment material (complete in place (203-00060) | CY | 250 | $80.36 | $131.00 | $115.00 | $106.42 |
| 17 | Blading (203-01500) | HR | 40 | $178.31 | $200.00 | $190.00 | $152.39 |
| 18 | Structure backfill (flow-fill (206-00065) | CY | 22 | $350.00 | $1,500.00 | $1,250.00 | $1,443.96 |
| 19 | Erosion log type 1 (12 inch (208-00002) | LF | 200 | $7.57 | $7.60 | $5.50 | $5.87 |
| 20 | Concrete washout structure (208-00045) | EACH | 1 | $2,726.92 | $3,600.00 | $3,400.00 | $3,629.15 |
| 21 | Pre-fabricated vehicle tracking pad (208-00075) | EACH | 2 | $3,867.52 | $13,400 | $4,000.00 | $4,508.94 |
| 22 | Replace structure sign (210-00460) | EACH | 1 | $1,000.00 | $173.00 | $150.00 | $181.84 |
| 23 | Reset ground sign (210-00810) | EACH | 1 | $610.72 | $431.00 | $400.00 | $484.90 |
| 24 | Organic fertilizer (212-00700) | LB | 150 | $3.30 | $2.30 | $1.80 | $1.25 |
| 25 | Compost (mechanically applied (212-00701) | CY | 32.50 | $131.74 | $128.50 | $110.00 | $130.90 |
| 26 | Mycorrhizae (212-00704) | LB | 5 | $44.85 | $44.00 | $40.00 | $32.32 |
| 27 | Seeding (native drill (212-00706) | ACRE | 0.75 | $4,003.66 | $1,901.00 | $1,790.00 | $1,621.98 |
| 28 | Mulching (weed free straw (213-00004) | ACRE | 0.75 | $2,079.81 | $1,440.00 | $1,350.00 | $1,900.85 |
| 29 | Mulch tackifier (213-00061) | LB | 100 | $8.21 | $8.10 | $7.50 | $7.86 |
| 30 | Wildlife biologist (240-00000) | HR | 40 | $203.17 | $285.00 | $257.00 | $292.53 |
| 31 | Removal of nests (240-00010) | HR | 100 | $186.07 | $286.00 | $250.00 | $284.56 |
| 32 | Netting (240-00020) | SY | 1,500 | $9.58 | $14.00 | $12.75 | $14.71 |
| 33 | Aggregate base course (shoulder material (304-08002) | CY | 2,529 | $268.00 | $25.00 | $58.50 | $73.85 |
| 34 | Hot mix asphalt (patching (asphalt (403-00720) | TON | 468.75 | $280.35 | $250.00 | $127.00 | $237.26 |
| 35 | Place hot mix asphalt (403-09551) | HR | 50 | $200.00 | $451.50 | $1,390.00 | $1,327.25 |
| 36 | 1 mix asphalt (grading SX (75 (PG 58- (403-34721) | TON | 293 | $120.00 | $140.00 | $256.00 | $169.97 |
| 37 | Not mix asphalt (grading SX (75 (PG 76- (403-34771) | TON | 72,727.49 | $115.00 | $91.25 | $97.25 | $100.00 |
| 38 | Emulsified asphalt (slow-setting (411-10255) | GAL | 31,350 | $4.60 | $3.50 | $5.50 | $7.68 |
| 39 | Paint existing structure (509-90004) | SF | 690 | $100.00 | $102.00 | $12.50 | $44.66 |
| 40 | Waterproofing (membrane (515-00120) | SY | 1,520 | $30.68 | $22.50 | $20.00 | $26.65 |
| 41 | Bridge expansion joint (asphaltic plug (518-01001) | LF | 252 | $429.50 | $342.00 | $310.00 | $416.53 |
| 42 | Epoxy resin (injection (519-01000) | LF | 20 | $449.99 | $286.00 | $250.00 | $710.87 |
| 43 | Concrete class DR (601-03057) | CY | 17.90 | $2,575.19 | $3,700.00 | $3,200.00 | $4,442.95 |
| 44 | Concrete (patching (601-06102) | CF | 49 | $1,076.51 | $985.00 | $865.00 | $894.14 |
| 45 | Galvanic anodes, DO not use going forward, (601-51005) | EACH | 685 | $38.35 | $42.50 | $37.50 | $41.10 |
| 46 | Reinforcing steel (602-00000) | LB | 800 | $3.75 | $5.00 | $4.25 | $5.56 |
| 47 | Suarcrall type 3 (31 inch midwest guardrail (606-00302) | LF | 9,213 | $39.55 | $29.00 | $29.75 | $29.41 |
| 48 | 3 anchorage type 3D (606-01340) | EACH | 5 | $1,911.50 | $1,900.00 | $1,700.00 | $1,897.60 |
| 49 | Transition type 3G (606-01370) | EACH | 4 | $3,963.58 | $3,500.00 | $3,115.00 | $3,477.08 |
| 50 | Transition type 3H (606-01380) | EACH | 3 | $869.33 | $1,800.00 | $1,650.00 | $1,841.80 |
| 51 | Median terminal (606-01460) | EACH | 4 | $9,404.64 | $6,900.00 | $6,300.00 | $7,032.29 |
| 52 | End anchorage (nonflared (606-02003) | EACH | 10 | $2,433.10 | $3,500.00 | $3,270.00 | $3,650.10 |
| 53 | Delineator (type (612-00001) | EACH | 616 | $24.93 | $21.50 | $20.00 | $24.24 |
| 54 | Delineator (type I! (612-00002) | EACH | 214 | $27.50 | $26.00 | $24.00 | $29.09 |
| 55 | Delineator (type ill (612-00003) | EACH | 40 | $34.61 | $30.25 | $28.00 | $33.94 |
| 56 | 2 inch electrical conduit (613-00200) | LF | 150 | $26.26 | $55.00 | $52.70 | $57.90 |
| 57 | Pull box (11"X18"X12" (613-07011) | EACH | 4 | $895.61 | $1,600.00 | $1,446.50 | $1,590.06 |
| 58 | Sign panel (class 1 (614-00011) | SF | 156 | $24.91 | $27.00 | $25.00 | $30.30 |
| 59 | Sign panel (class II (614-00012) | SF | 621 | $28.76 | $34.00 | $30.00 | $36.37 |
| 60 | Ace sign support (2-inch round (post and (614-01503) | EACH | 30 | $412.22 | $350.00 | $300.00 | $363.67 |
| 61 | Stool sign support (2-1/2 inch round NP- (614-01573) | EACH | 29 | $644.92 | $550.00 | $500.00 | $606.13 |
| 62 | Steel sign support (2-1/2 in round SCH 80 (614-01583) | EACH | 7 | $644.97 | $660.00 | $600.00 | $727.35 |
| 63 | Loop detector wire (614-72875) | LF | 1,500 | $4.33 | $29.00 | $26.35 | $28.95 |
| 64 | Piezo (electric (class IL (614-73005) | EACH | 4 | $12,167 | $5,000.00 | $4,710.45 | $5,177.72 |
| 65 | Rumble strip (614-80385) | LF | 245,781 | $0.06 | $0.18 | $0.28 | $0.15 |
| 66 | Field office (class 2 (620-00002) | EACH | 1 | $70,000 | $61,500 | $58,000 | $70,378 |
| 67 | Field laboratory (class 2 (620-00012) | EACH | 1 | $70,000 | $57,500 | $50,500 | $48,387 |
| 68 | Sanitary facility (620-00020) | EACH | 2 | $10,000 | $5,175.00 | $6,400.00 | $4,532.03 |
| 69 | Construction surveying (625-00000) | LS | 1 | $50,000 | $109,000 | $27,100 | $77,932 |
| 70 | Mobilization (626-00000) | LS | 1 | $833,031 | $683,293 | $642,500 | $524,117 |
| 71 | Public information services (tier IV (626-01104) | LS | 1 | $15,000 | $10,100 | $6,900.00 | $14,346 |
| 72 | Modified epoxy pavement marking (627-00008) | GAL | 1,680 | $172.42 | $140.80 | $134.00 | $148.83 |
| 73 | Pavement marking paint (high build (627-00013) | GAL | 2,100 | $81.87 | $95.00 | $101.05 | $130.12 |
| 74 | Preformed plastic pavement marking (type (627-01010) | SF | 18,300 | $19.61 | $23.30 | $21.00 | $23.32 |
| 75 | Preformed thermoplastic pavement (627-30407) | SF | 741 | $29.00 | $22.10 | $21.00 | $23.32 |
| 76 | Preformed thermoplastic pavement (627-30411) | SF | 1,939 | $20.94 | $15.70 | $15.00 | $16.67 |
| 77 | Survey monument (type 3A (629-01031) | EACH | 1 | $1,000.00 | $3,170.00 | $500.00 | $1,699.10 |
| 78 | Monument box (629-01050) | EACH | 1 | $2,500.00 | $1,300.00 | $500.00 | $5,663.67 |
| 79 | Flagging (630-00000) | HR | 2,000 | $33.72 | $52.00 | $45.00 | $54.55 |
| 80 | Uniformed traffic control (630-00003) | HR | 1,500 | $122.32 | $190.00 | $165.00 | $200.02 |
| 81 | Traffic control inspection (630-00007) | DAY | 70 | $165.58 | $171.00 | $145.00 | $181.84 |
| 82 | Traffic control management (630-00012) | DAY | 130 | $720.72 | $2,050.00 | $2,105.00 | $1,515.30 |
| 83 | Flashing beacon (portable (630-80001) | EACH | 4 | $734.06 | $900.00 | $800.00 | $969.79 |
| 84 | Barricade (type 3 M-A (temporary (630-80335) | EACH | 3 | $168.51 | $160.00 | $150.00 | $181.84 |
| 85 | Construction traffic sign (panel size A (630-80341) | EACH | 66 | $51.42 | $72.00 | $65.00 | $78.79 |
| 86 | Construction traffic sign (panel size B (630-80342) | EACH | 183 | $74.59 | $97.00 | $85.00 | $103.05 |
| 87 | Construction traffic sign (panel size C (630-80343) | EACH | 4 | $73.49 | $275.00 | $250.00 | $303.06 |
| 88 | Vertical panel (630-80350) | EACH | 100 | $35.53 | $44.20 | $40.00 | $48.49 |
| 89 | Portable message sign panel (630-80355) | EACH | 4 | $5,269.30 | $8,750.00 | $8,000.00 | $9,697.96 |
| 90 | Advance warning flashing or sequencing (630-80358) | EACH | 4 | $1,206.30 | $1,312.00 | $1,200.00 | $1,454.70 |
| 91 | Drum channelizing device (630-80360) | EACH | 300 | $30.72 | $46.00 | $42.00 | $50.92 |
| 92 | Drum channelizing device (with light (630-80364) | EACH | 150 | $43.49 | $75.00 | $68.00 | $82.43 |
| 93 | Traffic cone (630-80380) | EACH | 400 | $8.78 | $14.00 | $13.00 | $15.76 |
| 94 | Mobile pavement marking zone (630-80511) | LS | 1 | $1,000.00 | $13,500 | $12,500 | $13,884 |
| 95 | Mobile attenuator (630-85020) | EACH | 4 | $30,987 | $33,500 | $30,000 | $36,367 |
| 96 | Night work lighting (632-00000) | LS | 1 | $32,000 | $7,500.00 | $12,000 | $7,808.16 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
Every contract let that day: CDOT letting of December 18, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.