CDOT contract C24846 bid tabulation

County line to purcell blvd. Let by Colorado DOT on December 18, 2025. 3 bids received; low bid $12,305,351 by Martin Marietta Materials, Inc., -15% against the engineer's estimate of $14,400,000.

Owner
Colorado DOT
Letting
18 DEC 2025
Pay items
96
Data through
10 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Martin Marietta Materials, Inc.$12,305,351Low-15%
2Oldcastle SW Group, Inc.$12,857,366+4.0%-11%
3Edw. C. Levy Co.$13,586,969+10%-6.0%
CDOT contract C24846: bids by rank

Engineer's estimate: $14,400,000.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Martin Marietta Materials, Inc.2. Oldcastle SW Group, Inc.3. Edw. C. Levy Co.
1Removal of debris (201-00005)LS1$6,000.00$28,000$27,000$16,106
2Removal of delineator (202-00090)EACH832$6.11$4.50$4.00$4.85
3Removal of asphalt mat (planing (202-00240)SY627,008$1.39$1.70$2.20$2.37
4Removal of asphalt mat (planing (special (202-00246)SY1,520$17.98$19.00$34.75$11.76
5Removal of pavement marking (202-00250)SF1,500$3.10$5.60$5.00$5.56
6Removal of pavement marking (asphalt (202-00251)SF146,540$0.67$0.65$0.60$0.64
7(clase 2 of portions of present structure (202-00453)SY114$532.96$516.00$455.00$527.60
8Reeve of portions of present structure (202-00460)SY23$1,084.12$1,200.00$1,100.00$944.13
9Removal of expansion device (202-00504)LF252$237.70$50.00$45.00$144.40
10Removal of portions of present structure (202-00505)SF150$438.30$230.00$210.00$288.79
11Removal of ground sign (202-00810)EACH81$115.58$97.00$85.00$103.05
12Removal of sign panel (202-00821)EACH15$100.68$60.00$55.00$66.67
13Removal of guardrail type 3 (202-01130)LF9,175$4.32$2.20$6.00$2.23
14Removal of end anchorage (202-01300)EACH19$393.98$520.00$475.00$530.22
15Removal and disposal of paint (202-05301)SF690$225.00$94.00$42.50$176.44
16Embankment material (complete in place (203-00060)CY250$80.36$131.00$115.00$106.42
17Blading (203-01500)HR40$178.31$200.00$190.00$152.39
18Structure backfill (flow-fill (206-00065)CY22$350.00$1,500.00$1,250.00$1,443.96
19Erosion log type 1 (12 inch (208-00002)LF200$7.57$7.60$5.50$5.87
20Concrete washout structure (208-00045)EACH1$2,726.92$3,600.00$3,400.00$3,629.15
21Pre-fabricated vehicle tracking pad (208-00075)EACH2$3,867.52$13,400$4,000.00$4,508.94
22Replace structure sign (210-00460)EACH1$1,000.00$173.00$150.00$181.84
23Reset ground sign (210-00810)EACH1$610.72$431.00$400.00$484.90
24Organic fertilizer (212-00700)LB150$3.30$2.30$1.80$1.25
25Compost (mechanically applied (212-00701)CY32.50$131.74$128.50$110.00$130.90
26Mycorrhizae (212-00704)LB5$44.85$44.00$40.00$32.32
27Seeding (native drill (212-00706)ACRE0.75$4,003.66$1,901.00$1,790.00$1,621.98
28Mulching (weed free straw (213-00004)ACRE0.75$2,079.81$1,440.00$1,350.00$1,900.85
29Mulch tackifier (213-00061)LB100$8.21$8.10$7.50$7.86
30Wildlife biologist (240-00000)HR40$203.17$285.00$257.00$292.53
31Removal of nests (240-00010)HR100$186.07$286.00$250.00$284.56
32Netting (240-00020)SY1,500$9.58$14.00$12.75$14.71
33Aggregate base course (shoulder material (304-08002)CY2,529$268.00$25.00$58.50$73.85
34Hot mix asphalt (patching (asphalt (403-00720)TON468.75$280.35$250.00$127.00$237.26
35Place hot mix asphalt (403-09551)HR50$200.00$451.50$1,390.00$1,327.25
361 mix asphalt (grading SX (75 (PG 58- (403-34721)TON293$120.00$140.00$256.00$169.97
37Not mix asphalt (grading SX (75 (PG 76- (403-34771)TON72,727.49$115.00$91.25$97.25$100.00
38Emulsified asphalt (slow-setting (411-10255)GAL31,350$4.60$3.50$5.50$7.68
39Paint existing structure (509-90004)SF690$100.00$102.00$12.50$44.66
40Waterproofing (membrane (515-00120)SY1,520$30.68$22.50$20.00$26.65
41Bridge expansion joint (asphaltic plug (518-01001)LF252$429.50$342.00$310.00$416.53
42Epoxy resin (injection (519-01000)LF20$449.99$286.00$250.00$710.87
43Concrete class DR (601-03057)CY17.90$2,575.19$3,700.00$3,200.00$4,442.95
44Concrete (patching (601-06102)CF49$1,076.51$985.00$865.00$894.14
45Galvanic anodes, DO not use going forward, (601-51005)EACH685$38.35$42.50$37.50$41.10
46Reinforcing steel (602-00000)LB800$3.75$5.00$4.25$5.56
47Suarcrall type 3 (31 inch midwest guardrail (606-00302)LF9,213$39.55$29.00$29.75$29.41
483 anchorage type 3D (606-01340)EACH5$1,911.50$1,900.00$1,700.00$1,897.60
49Transition type 3G (606-01370)EACH4$3,963.58$3,500.00$3,115.00$3,477.08
50Transition type 3H (606-01380)EACH3$869.33$1,800.00$1,650.00$1,841.80
51Median terminal (606-01460)EACH4$9,404.64$6,900.00$6,300.00$7,032.29
52End anchorage (nonflared (606-02003)EACH10$2,433.10$3,500.00$3,270.00$3,650.10
53Delineator (type (612-00001)EACH616$24.93$21.50$20.00$24.24
54Delineator (type I! (612-00002)EACH214$27.50$26.00$24.00$29.09
55Delineator (type ill (612-00003)EACH40$34.61$30.25$28.00$33.94
562 inch electrical conduit (613-00200)LF150$26.26$55.00$52.70$57.90
57Pull box (11"X18"X12" (613-07011)EACH4$895.61$1,600.00$1,446.50$1,590.06
58Sign panel (class 1 (614-00011)SF156$24.91$27.00$25.00$30.30
59Sign panel (class II (614-00012)SF621$28.76$34.00$30.00$36.37
60Ace sign support (2-inch round (post and (614-01503)EACH30$412.22$350.00$300.00$363.67
61Stool sign support (2-1/2 inch round NP- (614-01573)EACH29$644.92$550.00$500.00$606.13
62Steel sign support (2-1/2 in round SCH 80 (614-01583)EACH7$644.97$660.00$600.00$727.35
63Loop detector wire (614-72875)LF1,500$4.33$29.00$26.35$28.95
64Piezo (electric (class IL (614-73005)EACH4$12,167$5,000.00$4,710.45$5,177.72
65Rumble strip (614-80385)LF245,781$0.06$0.18$0.28$0.15
66Field office (class 2 (620-00002)EACH1$70,000$61,500$58,000$70,378
67Field laboratory (class 2 (620-00012)EACH1$70,000$57,500$50,500$48,387
68Sanitary facility (620-00020)EACH2$10,000$5,175.00$6,400.00$4,532.03
69Construction surveying (625-00000)LS1$50,000$109,000$27,100$77,932
70Mobilization (626-00000)LS1$833,031$683,293$642,500$524,117
71Public information services (tier IV (626-01104)LS1$15,000$10,100$6,900.00$14,346
72Modified epoxy pavement marking (627-00008)GAL1,680$172.42$140.80$134.00$148.83
73Pavement marking paint (high build (627-00013)GAL2,100$81.87$95.00$101.05$130.12
74Preformed plastic pavement marking (type (627-01010)SF18,300$19.61$23.30$21.00$23.32
75Preformed thermoplastic pavement (627-30407)SF741$29.00$22.10$21.00$23.32
76Preformed thermoplastic pavement (627-30411)SF1,939$20.94$15.70$15.00$16.67
77Survey monument (type 3A (629-01031)EACH1$1,000.00$3,170.00$500.00$1,699.10
78Monument box (629-01050)EACH1$2,500.00$1,300.00$500.00$5,663.67
79Flagging (630-00000)HR2,000$33.72$52.00$45.00$54.55
80Uniformed traffic control (630-00003)HR1,500$122.32$190.00$165.00$200.02
81Traffic control inspection (630-00007)DAY70$165.58$171.00$145.00$181.84
82Traffic control management (630-00012)DAY130$720.72$2,050.00$2,105.00$1,515.30
83Flashing beacon (portable (630-80001)EACH4$734.06$900.00$800.00$969.79
84Barricade (type 3 M-A (temporary (630-80335)EACH3$168.51$160.00$150.00$181.84
85Construction traffic sign (panel size A (630-80341)EACH66$51.42$72.00$65.00$78.79
86Construction traffic sign (panel size B (630-80342)EACH183$74.59$97.00$85.00$103.05
87Construction traffic sign (panel size C (630-80343)EACH4$73.49$275.00$250.00$303.06
88Vertical panel (630-80350)EACH100$35.53$44.20$40.00$48.49
89Portable message sign panel (630-80355)EACH4$5,269.30$8,750.00$8,000.00$9,697.96
90Advance warning flashing or sequencing (630-80358)EACH4$1,206.30$1,312.00$1,200.00$1,454.70
91Drum channelizing device (630-80360)EACH300$30.72$46.00$42.00$50.92
92Drum channelizing device (with light (630-80364)EACH150$43.49$75.00$68.00$82.43
93Traffic cone (630-80380)EACH400$8.78$14.00$13.00$15.76
94Mobile pavement marking zone (630-80511)LS1$1,000.00$13,500$12,500$13,884
95Mobile attenuator (630-85020)EACH4$30,987$33,500$30,000$36,367
96Night work lighting (632-00000)LS1$32,000$7,500.00$12,000$7,808.16
CDOT contract C24846: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.

Every contract let that day: CDOT letting of December 18, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy