CDOT letting results, December 18, 2025
3 contracts let by Colorado DOT on December 18, 2025, $23,605,455 in low bids, a median of 3 bidders per contract. On the 3 with an engineer's estimate, the low bid came in under it 1 times; median low bid +31% against the estimate.
- Owner
- Colorado DOT
- Contracts
- 3
- Low bids, total
- $23,605,455
- Data through
- 10 SEP 2026
Contracts let that day
| Contract | Project | Region | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| C24846 | County line to purcell blvd | 3 | Martin Marietta Materials, Inc. | $12,305,351 | $12,857,366 | +4.0% | -15% | CDOT | |
| C26234 | Culvert (11) remove & replace culvert locations combined with (8)rehab culvert locations. remove & replace culvert locations as shown in the plans; sh 41 (mm 8. | 2 of 3 | Native Sun Materials Inc | $8,859,323 | +31% | CDOT | |||
| C26274 | This is bridge replacement project near hayden, colorado in routt county along us 40 at mp 108.35. the work includes water control, a temporary detour, highway | 5 | Oldcastle SW Group, Inc. | $2,440,781 | $2,530,359 | +4.0% | +52% | CDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than CDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.