Native Sun Materials Inc: CDOT bid record
Native Sun Materials Inc submitted 11 bids on Colorado DOT contracts in the data, from 11 JUL 2024 to 18 DEC 2025, and was the low bidder on 3 of them (27%). When it was not low, its total sat a median +23% above the low bid.
- Owner
- Colorado DOT
- Low bid volume
- $13,189,155
- Latest bid
- 18 DEC 2025
- Data through
- 10 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 6 | 1 | 17% |
| 2025 | 5 | 2 | 40% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 2 | 5 | 1 | 20% |
| Region 1 | 3 | 1 | 33% |
| Region 5 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Embankment material (complete in place) | 203-00060 | CY | 7 | 4 (57%) | $38.43 | $60.00 |
| Traffic control inspection | 630-00007 | DAY | 11 | 2 (18%) | $316.25 | $350.00 |
| Removal of asphalt mat | 202-00220 | SY | 8 | 2 (25%) | $19.86 | $20.50 |
| Mycorrhizae | 212-00704 | LB | 7 | 2 (29%) | $13.10 | $20.00 |
| Aggregate bag | 208-00035 | LF | 6 | 2 (33%) | $15.77 | $12.75 |
| Silt fence | 208-00020 | LF | 6 | 2 (33%) | $2.50 | $3.00 |
| Structure excavation | 206-00000 | CY | 6 | 2 (33%) | $31.07 | $50.00 |
| Removal of asphalt mat (planing) | 202-00240 | SY | 5 | 2 (40%) | $4.21 | $6.00 |
| Field laboratory (class 2) | 620-00012 | EACH | 5 | 2 (40%) | $36,859 | $52,250 |
| Combination loader | 203-01594 | HR | 5 | 2 (40%) | $161.28 | $160.00 |
| Clean culvert | 202-04002 | EACH | 5 | 2 (40%) | $3,687.20 | $4,000.00 |
| Structure backfill (class 1) | 206-00100 | CY | 5 | 2 (40%) | $52.54 | $85.01 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Capital Paving & Construction, LLC | 4 | 4 of 4 |
| Myers & Sons Construction, LLC | 4 | 2 of 4 |
| Structures, Inc. | 4 | 2 of 4 |
| Siete, Inc. | 3 | 2 of 3 |
| Concrete Concepts Design Inc, DBA Pyramid Construction Inc | 2 | 2 of 2 |
| Kiewit Infrastructure Co. | 2 | 1 of 2 |
| FNF Construction, Inc. | 2 | 1 of 2 |
| Oldcastle SW Group, Inc. | 2 | 1 of 2 |
| Tricon 2, LLC | 2 | 1 of 2 |
| American West Construction, LLC | 2 | 1 of 2 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 DEC 2025 | C26234 | Culvert (11) remove & replace culvert locations combined with (8)rehab culvert locations. remove & replace culvert locations as shown in the | 1 of 3 | $8,859,323 | Low | |
| 18 SEP 2025 | C23069-COMBO | Region 5 | US 50 CONEJOS RIVER BRIDGE STRUCTURE P-12-A BE | 2 of 5 | $3,682,755 | +28% |
| 18 SEP 2025 | C25393 | Region 2 | WIDENING AND RESURFACING OF I-25C FROM THE INTERSECTION WITH PINE STREET TO JUST BEFORE THE STRUCTURE N-17-BV OVER THE PICTOUR ARROYO. | 4 of 8 | $7,096,187 | +19% |
| 06 FEB 2025 | C25624 | Region 1 | The R1 Expansion Joint Repairs at Railroads project includes the removal and replacement of expansion devices, joint repairs, deck repairs, | 1 of 4 | $2,684,444 | Low, 8.0% under the second |
| 16 JAN 2025 | C25972 | Region 2 | Timber bridge retrofit project on 21 structures located in CDOT Region 2 on CO 9B, US 24A, US 24G, CO 67C, AND US 285D. | 6 of 7 | $3,518,961 | +96% |
| 09 DEC 2024 | C26628 | Region 2 | SH21A MP136.5, EAST OF GRINNELL BLVD INTERSECTION | 1 of 2 | $1,645,389 | Low, 23% under the second |
| 21 NOV 2024 | C22834 | Region 5 | This project is located on US 160 between mileposts 258.4 and 264.9 in Costilla county. The project will construct acceleration and decelera | 5 of 7 | $13,932,495 | +25% |
| 21 NOV 2024 | C25250 | Region 1 | SH 7 AND AIRPORT DR INTERSECTION | 3 of 4 | $4,650,142 | +11% |
| 10 OCT 2024 | C25538 | Region 2 | SH71C ROADWAY WIDENING FOR PASSING LANE BETWEEN ROCKY FORD AND ORDWAY (MP 19.94 - 20.78). PROJECT SCOPE ALSO INCLUDES OVERLAY PAVING OF EXIS | 5 of 6 | $2,678,540 | +15% |
| 01 AUG 2024 | C25921 | Region 2 | 050B LAS ANIMAS - BRIDGE STRUCTURE L-24-A / L-24-D MP 399.8 | 3 of 5 | $12,418,498 | +20% |
| 11 JUL 2024 | C25140 | Region 1 | This project will be doing a full-depth replacement of the pavement of the NB chain area where trucks will be entering to de-chain only when | 5 of 5 | $3,273,285 | +29% |
How this record was read
CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; CDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.