CDOT contract C23069-COMBO bid tabulation

US 50 CONEJOS RIVER BRIDGE STRUCTURE P-12-A BE. Let by Colorado DOT on September 18, 2025, Conejos, Region 5. 5 bids received; low bid $2,866,394 by W.W. Clyde & Co., -22% against the engineer's estimate of $3,652,751.

Owner
Colorado DOT
Letting
18 SEP 2025
Pay items
101
Data through
10 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1W.W. Clyde & Co.$2,866,394Low-22%
2Native Sun Materials Inc$3,682,755+28%+1.0%
3Siete, Inc.$3,905,383+36%+7.0%
4Robins Construction LLLP$3,946,561+38%+8.0%
5Meridian Engineering Co.$4,142,666+45%+13%
CDOT contract C23069-COMBO: bids by rank

Engineer's estimate: $3,652,751.

Bid tabulation

LinePay itemUnitQuantityEstimate1. W.W. Clyde & Co.2. Native Sun Materials Inc3. Siete, Inc.4. Robins Construction LLLP5. Meridian Engineering Co.
1Clearing and grubbing (201-00000)LS1$65,000$40,000$24,809$100,000$7,959.00$50,000
2Removal of delineator (202-00090)EACH12$20.00$30.00$80.08$100.00$25.00$16.00
3Removal of asphalt mat (202-00220)SY171$60.00$9.00$40.42$30.00$164.00$45.00
4Removal of asphalt mat (planing) (202-00240)SY1,826$9.00$7.00$9.30$10.00$13.00$15.00
5Removal of asphalt mat (planing) (special) (202-00246)SY544$21.34$18.00$26.95$70.00$24.00$35.00
6Removal of pavement marking (202-00250)SF7$25.00$1.00$61.60$50.00$5.00$28.00
7Removal of bridge (202-00400)EACH1$150,000$65,000$124,338$100,000$170,400$125,000
8Removal of portions of present structure (class 2) (202-00453)SY67$524.66$300.00$560.00$425.00$1,082.72$425.00
9Removal of portions of present structure (class 3) (202-00460)SY17$1,275.28$1,500.00$5,040.00$900.00$1,066.80$1,800.00
10Removal of ground sign (202-00810)EACH3$250.00$500.00$308.00$250.00$550.00$350.00
11Removal of guardrail type 3 (202-01130)LF50$15.00$13.00$14.78$20.00$25.00$18.00
12Removal of end anchorage (202-01300)EACH4$500.00$550.00$585.20$750.00$500.00$650.00
13Clean inlet (202-04010)EACH10$1,033.71$300.00$1,680.00$2,000.00$800.00$200.00
14Sawing asphalt material (6 inch) (202-05026)LF309$15.00$6.00$18.48$15.00$5.00$10.00
15Removal of detour (202-06000)LS1$80,000$55,000$22,028$50,000$151,866$85,000
16Unclassified excavation (203-00000)CY185$150.00$28.00$41.54$50.00$35.00$16.00
17Embankment material (complete in place) (203-00060)CY107$120.00$57.00$49.64$110.00$35.00$9.00
18Combination loader (203-01594)HR40$130.00$127.00$414.40$170.00$200.00$90.00
19Potholing (203-01597)HR20$450.00$203.00$616.00$400.00$240.00$400.00
20Laborer (203-02330)HR40$80.00$50.00$140.00$60.00$44.00$45.00
21Structure excavation (206-00000)CY1,028$65.00$28.00$33.09$43.00$25.00$25.00
22Structure backfill (class 1) (206-00100)CY710$120.00$47.00$52.54$155.00$32.00$105.00
23Structure backfill (class 2) (206-00200)CY241$75.00$21.00$39.25$100.00$32.00$25.00
24Topsoil (207-00205)CY36$100.00$31.00$135.66$50.00$50.00$25.00
25Topsoil (special) (207-00405)CY269$50.00$55.00$135.66$60.00$30.00$29.00
26Topsoil (wetland) (207-00703)CY307$50.00$70.00$160.30$50.00$30.00$30.00
27Subgrade soil preparation (207-00704)SY7,260$2.00$2.50$3.12$1.00$4.00$0.60
28Erosion log type 1 (12 inch) (208-00002)LF2,100$10.00$8.00$8.62$10.00$7.00$12.00
29Silt fence (reinforced) (208-00021)LF360$78.00$4.00$14.78$10.00$4.50$9.00
30Aggregate bag (208-00035)LF200$15.00$15.00$14.78$15.00$14.00$19.00
31Pre-fabricated concrete washout structure (type 1) (208-00046)EACH2$6,000.00$2,230.00$6,776.00$5,000.00$900.00$7,000.00
32Pre-fabricated vehicle tracking pad (208-00075)EACH3$14,000$3,270.00$10,472$5,000.00$22,500$7,500.00
33Construction mat (208-00082)SF1,000$20.00$14.00$55.44$100.00$35.00$21.00
34Removal and disposal of sediment (labor) (208-00103)HR20$100.00$51.00$224.00$100.00$88.00$65.00
35Removal and disposal of sediment (equipment) (208-00105)HR20$110.00$100.00$224.00$130.00$212.00$100.00
36Sweeping (sediment removal) (208-00106)HR10$160.00$130.00$369.60$130.00$150.00$135.00
37Erosion control management (208-00207)DAY28$500.00$263.00$554.40$500.00$852.00$1,200.00
38Water control (208-00400)LS1$40,000$60,000$67,760$150,000$50,000$110,000
39Dewatering (211-03005)LS1$40,000$50,000$67,760$100,000$65,000$200,000
40Biotic soil amendments (hydraulically applied) (212-00702)LB4,550$2.00$1.20$3.70$1.65$1.70$2.00
41Mycorrhizae (212-00704)LB78$20.00$10.00$14.78$26.00$27.00$30.00
42Seeding (native) hydraulic (212-00707)ACRE1.30$2,000.00$1,960.00$8,008.00$1,600.00$1,506.00$2,000.00
43Seeding (wetland) hydraulic (212-00710)ACRE0.19$5,000.00$5,300.00$19,712$1,600.00$1,579.00$2,100.00
44Mulching (weed free) (213-00003)ACRE1.50$4,000.00$1,400.00$4,312.00$3,500.00$3,259.00$4,000.00
45Spray-on mulch blanket (213-00012)ACRE1.50$6,000.00$4,000.00$6,776.00$8,000.00$7,619.00$9,000.00
46Deciduous tree (8 foot) (214-00280)EACH13$400.00$1,010.00$1,848.00$900.00$900.00$1,000.00
47Live willow stakes (214-01013)EACH1,600$15.00$10.00$9.86$22.00$25.00$25.00
48Rootwad (214-01227)EACH6$400.00$1,050.00$1,848.00$500.00$1,500.00$220.00
49Wildlife biologist (240-00000)HR20$400.00$210.00$431.20$200.00$250.00$320.00
50Environmental health and safety management (250-00010)LS1$10,000$5,670.00$18,480$15,000$5,720.00$50,000
51Monitoring technician (250-00050)HR40$200.00$190.00$616.00$175.00$193.00$300.00
52Health and safety officer (250-00110)HR40$200.00$190.00$554.40$175.00$250.00$300.00
53Aggregate base course (class 2) (304-02000)TON157$80.00$36.00$71.02$80.00$22.00$90.00
54Aggregate base course (class 6) (304-06000)TON143$80.00$53.00$58.70$80.00$26.00$115.00
55Hot mix asphalt (patching) (asphalt) (403-00720)TON657$454.80$289.00$308.00$300.00$270.00$300.00
56Joint sealant (408-01100)LF150$27.65$10.00$80.08$50.00$40.00$85.00
57Geotextile (erosion control) (class 1) (420-00102)SY47$15.00$11.00$64.40$15.00$23.00$8.00
58Geogrid pavement reinforcement (420-00520)SY603$12.00$4.00$17.36$8.00$12.75$7.00
59Hand rail (514-00100)LF189$160.00$207.00$314.16$300.00$248.00$300.00
60Waterproofing (membrane) (515-00120)SY920$48.57$19.00$80.08$50.00$50.00$40.00
61Concrete class D (box culvert) (601-03030)CY184$1,500.00$1,320.00$1,372.00$2,500.00$1,257.06$1,550.00
62Concrete class DR (601-03057)CY10.40$3,271.49$1,940.00$3,231.20$5,500.00$900.00$5,500.00
63Reinforcing steel (602-00000)LB505$3.92$2.50$5.84$2.00$2.00$2.50
64Reinforcing steel (epoxy coated) (602-00020)LB43,756$2.50$2.00$3.60$2.50$4.00$2.50
65Galvanic anodes (602-51010)EACH420$20.00$39.00$80.08$31.00$41.00$25.00
6616X8 foot concrete box culvert (precast) (603-71609)LF126$5,000.00$4,390.00$3,080.00$2,700.00$4,250.00$4,900.00
67Guardrail type 3 (31 inch midwest guardrail system) (606-00302)LF537.50$60.00$95.00$108.42$88.00$98.00$90.00
68End anchorage (nonflared) (606-02003)EACH4$2,500.00$4,200.00$4,804.80$3,900.00$4,800.00$4,000.00
69Fence (plastic) (607-11525)LF200$5.00$5.50$7.39$5.50$5.00$5.00
70Fence (temporary) (607-11580)LF300$5.00$8.00$59.14$47.00$20.00$65.00
71Delineator (type I) (612-00001)EACH12$40.00$220.00$123.20$25.00$220.00$60.00
72Delineator (type III) (612-00003)EACH6$90.00$109.00$369.60$35.00$110.00$70.00
73Sign panel (class I) (614-00011)SF6$40.00$30.00$147.84$500.00$35.00$90.00
74Steel sign support (2-1/2 inch round NP- 40)(post & slipbase) (614-01573)EACH4$750.00$710.00$1,848.00$1,000.00$900.00$700.00
75Field office (class 2) (620-00002)EACH1$35,000$12,000$16,632$20,500$15,000$85,000
76Field laboratory (class 1) (620-00011)EACH1$35,000$10,900$14,045$20,500$16,000$80,000
77Sanitary facility (620-00020)EACH2$4,191.62$1,800.00$10,472$3,750.00$1,250.00$5,000.00
78Detour (621-00425)LS1$100,000$204,100$102,564$250,000$502,725$237,278
79Detour drainage pipe (class 0) (624-20300)LF320$250.00$172.00$143.76$300.00$240.00$300.00
80Construction surveying (625-00000)LS1$40,000$50,000$104,720$50,000$30,500$60,000
81Construction surveying (hourly) (625-00001)HR20$250.00$158.00$739.20$155.00$150.00$350.00
82Mobilization (626-00000)LS1$362,424$260,000$436,652$380,000$536,605$408,969
83Public information services (tier IV) (626-01104)LS1$7,000.00$7,600.00$22,176$7,900.00$8,250.00$15,000
84Pavement marking paint (high build) (627-00013)GAL7$401.83$109.00$308.00$750.00$320.00$340.00
85Pavement marking paint (high build)(temporary) (627-00016)GAL8$600.00$109.00$554.40$750.00$380.00$340.00
864 inch pavement marking tape (removable) (627-00025)LF100$5.00$5.50$18.48$35.00$18.00$30.00
87Flagging (630-00000)HR540$49.14$1.00$61.60$52.00$2.00$61.00
88Traffic control inspection (630-00007)DAY45$550.00$708.00$252.56$400.00$715.00$700.00
89Traffic control management (630-00012)DAY100$1,500.00$1,350.00$1,601.60$1,600.00$1,350.00$1,900.00
90Barricade (type 3 M-B) (temporary) (630-80336)EACH6$280.50$164.00$246.40$400.00$155.00$200.00
91Construction traffic sign (panel size A) (630-80341)EACH6$69.18$54.00$59.14$45.00$55.00$13.00
92Construction traffic sign (panel size B) (630-80342)EACH60$67.39$54.00$61.60$60.00$55.00$13.00
93Portable message sign panel (630-80355)EACH2$5,000.00$7,000.00$11,088$7,500.00$7,000.00$15,000
94Advance warning flashing or sequencing arrow panel (C type) (630-80358)EACH2$2,000.00$315.00$1,848.00$1,500.00$400.00$2,000.00
95Drum channelizing device (630-80360)EACH50$15.00$38.00$55.44$45.00$40.00$25.00
96Drum channelizing device (with light) (flashing) (630-80363)EACH50$33.13$98.00$67.76$50.00$100.00$50.00
97Barrier (temporary) (630-80370)LF1,600$92.45$60.00$80.08$100.00$80.00$90.00
98Traffic cone (630-80380)EACH20$10.00$5.50$55.44$20.00$10.00$20.00
99Portable rumble strips (temporary) (630-80440)EACH6$1,200.00$1,900.00$3,696.00$1,500.00$1,800.00$850.00
100Impact attenuator (temporary) (630-85010)EACH6$4,890.52$5,400.00$6,160.00$6,000.00$4,000.00$2,000.00
101Traffic signal (temporary) (630-86810)EACH1$40,000$27,300$41,272$33,500$26,000$35,000
CDOT contract C23069-COMBO: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.

Every contract let that day: CDOT letting of September 18, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy