CDOT letting results, September 18, 2025
2 contracts let by Colorado DOT on September 18, 2025, $8,853,907 in low bids, a median of 6.5 bidders per contract. On the 2 with an engineer's estimate, the low bid came in under it 2 times; median low bid -17% against the estimate.
- Owner
- Colorado DOT
- Contracts
- 2
- Low bids, total
- $8,853,907
- Data through
- 10 SEP 2026
Contracts let that day
| Contract | Project | Region | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| C25393 | WIDENING AND RESURFACING OF I-25C FROM THE INTERSECTION WITH PINE STREET TO JUST BEFORE THE STRUCTURE N-17-BV OVER THE PICTOUR ARROYO. | Region 2 | 8 | Siete, Inc. | $5,987,513 | $6,970,129 | +16% | -11% | CDOT |
| C23069-COMBO | US 50 CONEJOS RIVER BRIDGE STRUCTURE P-12-A BE | Region 5 | 5 | W.W. Clyde & Co. | $2,866,394 | $3,682,755 | +28% | -22% | CDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than CDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.