American West Construction, LLC: CDOT bid record
American West Construction, LLC submitted 14 bids on Colorado DOT contracts in the data, from 20 JUN 2024 to 28 AUG 2026, and was the low bidder on 5 of them (36%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- Colorado DOT
- Low bid volume
- $6,489,732
- Latest bid
- 28 AUG 2026
- Data through
- 10 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 4 | 2 | 50% |
| 2025 | 9 | 2 | 22% |
| 2026 | 1 | 1 | 100% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 5 | 3 | 1 | 33% |
| Region 1 | 3 | 1 | 33% |
| Region 2 | 2 | 1 | 50% |
| Region 3 | 2 | 2 | 100% |
| Region 4 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Sanitary facility | 620-00020 | EACH | 12 | 4 (33%) | $1,800.00 | $4,760.00 |
| Traffic control management | 630-00012 | DAY | 13 | 3 (23%) | $1,600.00 | $1,500.00 |
| Traffic cone | 630-80380 | EACH | 11 | 3 (27%) | $13.00 | $13.00 |
| Potholing | 203-01597 | HR | 9 | 3 (33%) | $340.00 | $350.00 |
| Construction mat | 208-00082 | SF | 7 | 3 (43%) | $23.25 | $24.12 |
| Combination loader | 203-01594 | HR | 6 | 3 (50%) | $142.50 | $160.00 |
| Aggregate bag | 208-00035 | LF | 9 | 2 (22%) | $15.00 | $12.75 |
| Fence (plastic) | 607-11525 | LF | 9 | 2 (22%) | $6.00 | $5.00 |
| Erosion log type 1 (12 inch) | 208-00002 | LF | 7 | 2 (29%) | $9.00 | $7.00 |
| Removal of delineator | 202-00090 | EACH | 7 | 2 (29%) | $26.00 | $20.00 |
| Removal and disposal of sediment (labor) | 208-00103 | HR | 6 | 2 (33%) | $80.00 | $79.50 |
| Mulch tackifier | 213-00061 | LB | 6 | 2 (33%) | $5.00 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Insituform Technologies, LLC | 6 | 2 of 6 |
| Subsurface, Inc | 6 | 2 of 6 |
| Siete, Inc. | 4 | 2 of 4 |
| Edge Contracting, Inc. | 3 | 1 of 3 |
| HANK WILLIAMS, INC. dba WILLIAMS CONSTRUCTION CONTRACTORS | 2 | 1 of 2 |
| Native Sun Materials Inc | 2 | 1 of 2 |
| Myers & Sons Construction, LLC | 2 | 2 of 2 |
| Robins Construction LLLP | 1 | 1 of 1 |
| Tricon 2, LLC | 1 | 1 of 1 |
| Meridian Engineering Co. dba Meridian Contracting, Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 AUG 2026 | C27797 | Region 1 | ON US 85 AT MM 185.546, BETWEEN PROMENADE PKWY AND NEW BEAL | 1 of 4 | $286,745 | Low, 100% under the second |
| 18 DEC 2025 | C26234 | Culvert (11) remove & replace culvert locations combined with (8)rehab culvert locations. remove & replace culvert locations as shown in the | 3 of 3 | $10,084,223 | +14% | |
| 18 DEC 2025 | C26274 | This is bridge replacement project near hayden, colorado in routt county along us 40 at mp 108.35. the work includes water control, a tempor | 5 of 5 | $2,984,878 | +22% | |
| 11 SEP 2025 | C26564 | Region 2 | SH 50 CULVERT REPAIRS IN CANON CITY IN FREMONT COUNTY REGION 2 | 2 of 5 | $1,478,874 | +3.0% |
| 21 AUG 2025 | C26065 | Region 1 | I-70 AND PENA BLVD OVERPASS | 5 of 5 | $1,096,938 | +34% |
| 14 AUG 2025 | C23872 | Region 4 | This work consists of cleaning and lining culverts along CO 14 through the Poudre Canyon. SH 14 MP 75.5-85 | 2 of 3 | $285,200 | +45% |
| 17 JUL 2025 | C26207 | Region 4 | Project 26207 is a critical culvert project that involves the maintenance of numerous culverts throughout R4. Maintenance mostly involves Cu | 2 of 3 | $1,983,402 | +6.0% |
| 05 JUN 2025 | C26391 | Region 1 | This is a priority repair culvert rehabilitation project. The scope of this work is to line 58 corrugated metal pipes (CMP) using UV Cured-i | 3 of 3 | $3,674,540 | +52% |
| 08 MAY 2025 | C26425 | Region 3 | I-70 DILLON TO EJMT MM 204 TO MM 214 A mandatory pre bid conference will be held on April 28th, beginning at 10:00 AM at the Mountain Reside | 1 of 1 | $3,373,121 | Low |
| 08 MAY 2025 | C26580 | Region 5 | REGION 5 | 1 of 3 | $1,581,538 | Low, 6.0% under the second |
| 19 DEC 2024 | C25581 | Region 3 | THIS IS A CULVERT TREATMENT PROJECT IN MOFFAT COUNTY ALONG US 40 AT MP 36.64 AND ALONG SH 394 AT MP 1.26. BOTH LOCATIONS WILL RECEIVE CURE-I | 1 of 3 | $824,948 | Low, 1.0% under the second |
| 21 NOV 2024 | C22834 | Region 5 | This project is located on US 160 between mileposts 258.4 and 264.9 in Costilla county. The project will construct acceleration and decelera | 4 of 7 | $13,482,690 | +21% |
| 10 OCT 2024 | C26578 | Region 2 | FREMONT COUNTY IN R2 | 1 of 5 | $423,380 | Low, 20% under the second |
| 20 JUN 2024 | C25918 | Region 5 | SH 17 MP 0.3, 3.0 EMERGENCY CULVERTS REPAIR | 5 of 6 | $3,782,491 | +15% |
How this record was read
CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; CDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.