CDOT contract C27797 bid tabulation
ON US 85 AT MM 185.546, BETWEEN PROMENADE PKWY AND NEW BEAL. Let by Colorado DOT on August 28, 2026, Region 1. 4 bids received; low bid $286,745 by American West Construction, LLC, -74% against the engineer's estimate of $1,096,519.
- Owner
- Colorado DOT
- Letting
- 28 AUG 2026
- Pay items
- 9
- Data through
- 10 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | American West Construction, LLC | $286,745 | Low | -74% |
| 2 | Ralph L. Wadsworth Construction Company, LLC. | $574,665 | +100% | -48% |
| 3 | Kraemer North America, LLC | $712,631 | +149% | -35% |
| 4 | Ames Construction Incorporated | $1,150,000 | +301% | +5.0% |
Engineer's estimate: $1,096,519.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. American West Construction, LLC | 2. Ralph L. Wadsworth Construction Company, LLC. | 3. Kraemer North America, LLC | 4. Ames Construction Incorporated |
|---|---|---|---|---|---|---|---|---|
| 1 | Potholing (203-01597) | HR | 10 | $328.68 | $270.00 | $450.00 | $425.00 | $540.00 |
| 2 | Landscape restoration (212-01200) | LS | 1 | $5,011.33 | $1,800.00 | $10,500 | $25,248 | $25,000 |
| 3 | 60 inch reinforced concrete pipe (complete in place) (603-01605) | LF | 89 | $574.13 | $2,025.00 | $2,385.00 | $3,521.85 | $6,860.00 |
| 4 | Sanitary facility (620-00020) | EACH | 2 | $6,850.91 | $410.00 | $5,850.00 | $516.23 | $530.00 |
| 5 | Mobilization (626-00000) | LS | 1 | $741,259 | $26,000 | $173,000 | $275,000 | $114,220 |
| 6 | Public information services (tier III) (626-01103) | LS | 1 | $14,420 | $3,500.00 | $4,000.00 | $4,011.11 | $20,000 |
| 7 | Traffic control inspection (630-00007) | DAY | 10 | $339.28 | $330.00 | $470.00 | $201.18 | $400.00 |
| 8 | Traffic control management (630-00012) | DAY | 18 | $1,727.29 | $1,800.00 | $2,000.00 | $1,408.27 | $2,210.00 |
| 9 | Traffic control (special) LS (630-00016) | LS | 1 | $233,258 | $36,000 | $118,000 | $62,285 | $330,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
Every contract let that day: CDOT letting of August 28, 2026. Compiled by Mirage Metrics.