CDOT letting results, October 10, 2024
3 contracts let by Colorado DOT on October 10, 2024, $7,622,107 in low bids, a median of 5 bidders per contract. On the 3 with an engineer's estimate, the low bid came in under it 2 times; median low bid -29% against the estimate.
- Owner
- Colorado DOT
- Contracts
- 3
- Low bids, total
- $7,622,107
- Data through
- 10 SEP 2026
Contracts let that day
| Contract | Project | Region | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| C26311 | THIS PROJECT IS LOCATED ON CO 59 AND CONSISTS OF MILLING THE EXISTING ROADWAY 3 INCHES FOLLOWED BY 3 INCHES HOT MIX ASPHALT AND STRIPING FROM MP 0.05 TO MP 0.50 | Region 4 | 3 | Concrete Concepts Design Inc, DBA Pyramid Construction Inc | $4,877,180 | $5,156,049 | +6.0% | +6.0% | CDOT |
| C25538 | SH71C ROADWAY WIDENING FOR PASSING LANE BETWEEN ROCKY FORD AND ORDWAY (MP 19.94 - 20.78). PROJECT SCOPE ALSO INCLUDES OVERLAY PAVING OF EXISTING LANES, SIGN & D | Region 2 | 6 | Concrete Concepts Design Inc, DBA Pyramid Construction Inc | $2,321,547 | $2,324,632 | 0.0% | -34% | CDOT |
| C26578 | FREMONT COUNTY IN R2 | Region 2 | 5 | American West Construction, LLC | $423,380 | $508,852 | +20% | -29% | CDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than CDOT received, the others did not match their published totals and are left out.