CDOT letting results, October 10, 2024

3 contracts let by Colorado DOT on October 10, 2024, $7,622,107 in low bids, a median of 5 bidders per contract. On the 3 with an engineer's estimate, the low bid came in under it 2 times; median low bid -29% against the estimate.

Owner
Colorado DOT
Contracts
3
Low bids, total
$7,622,107
Data through
10 SEP 2026

Contracts let that day

ContractProjectRegionBidsLow bidderLow bidSecond bidGapAgainst estimateSource
C26311THIS PROJECT IS LOCATED ON CO 59 AND CONSISTS OF MILLING THE EXISTING ROADWAY 3 INCHES FOLLOWED BY 3 INCHES HOT MIX ASPHALT AND STRIPING FROM MP 0.05 TO MP 0.50Region 43Concrete Concepts Design Inc, DBA Pyramid Construction Inc$4,877,180$5,156,049+6.0%+6.0%CDOT
C25538SH71C ROADWAY WIDENING FOR PASSING LANE BETWEEN ROCKY FORD AND ORDWAY (MP 19.94 - 20.78). PROJECT SCOPE ALSO INCLUDES OVERLAY PAVING OF EXISTING LANES, SIGN & DRegion 26Concrete Concepts Design Inc, DBA Pyramid Construction Inc$2,321,547$2,324,6320.0%-34%CDOT
C26578FREMONT COUNTY IN R2Region 25American West Construction, LLC$423,380$508,852+20%-29%CDOT
CDOT contracts let on October 10, 2024, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than CDOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy