CDOT contract C26564 bid tabulation
SH 50 CULVERT REPAIRS IN CANON CITY IN FREMONT COUNTY REGION 2. Let by Colorado DOT on September 11, 2025, Fremont, Region 2. 5 bids received; low bid $1,440,920 by Insituform Technologies, LLC, -3.9% against the engineer's estimate of $1,500,000.
- Owner
- Colorado DOT
- Letting
- 11 SEP 2025
- Pay items
- 31
- Data through
- 10 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Insituform Technologies, LLC | $1,440,920 | Low | -4.0% |
| 2 | American West Construction, LLC | $1,478,874 | +3.0% | -1.0% |
| 3 | Inliner Solutions, LLC | $1,518,883 | +5.0% | +1.0% |
| 4 | Siete, Inc. | $1,618,263 | +12% | +8.0% |
| 5 | Subsurface, Inc | $1,632,951 | +13% | +9.0% |
Engineer's estimate: $1,500,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Insituform Technologies, LLC | 2. American West Construction, LLC | 3. Inliner Solutions, LLC | 4. Siete, Inc. | 5. Subsurface, Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201-00000) | LS | 1 | $15,000 | $9,055.00 | $20,000 | $725.00 | $35,000 | $12,000 |
| 2 | Removal of debris (201-00005) | LS | 1 | $15,000 | $5,020.00 | $20,000 | $2,175.00 | $45,000 | $5,000.00 |
| 3 | Clean culvert (202-04002) | EACH | 34 | $1,000.00 | $2,725.00 | $5,700.00 | $3,615.00 | $3,500.00 | $2,500.00 |
| 4 | Aggregate bag (208-00035) | LF | 40 | $14.93 | $17.00 | $18.00 | $14.00 | $14.00 | $25.00 |
| 5 | Construction mat (208-00082) | SF | 100 | $45.41 | $25.00 | $46.00 | $1.00 | $200.00 | $100.00 |
| 6 | Removal and disposal of sediment (labor) (208-00103) | HR | 4 | $72.76 | $235.00 | $92.00 | $216.00 | $88.00 | $90.00 |
| 7 | Sweeping (sediment removal) (208-00106) | HR | 4 | $201.29 | $410.00 | $200.00 | $216.00 | $117.00 | $200.00 |
| 8 | Seeding (native) broadcast (212-00708) | ACRE | 0.10 | $5,917.14 | $3,715.00 | $3,400.00 | $43,300 | $2,700.00 | $12,000 |
| 9 | Mulching (weed free hay) (213-00002) | ACRE | 0.10 | $4,164.24 | $3,905.00 | $3,500.00 | $43,300 | $2,800.00 | $8,000.00 |
| 10 | Wildlife biologist (240-00000) | HR | 8 | $135.09 | $140.00 | $240.00 | $289.00 | $325.00 | $250.00 |
| 11 | Culvert lining (18 inch) (603-00018) | LF | 167 | $210.00 | $112.00 | $165.00 | $135.00 | $240.00 | $165.00 |
| 12 | Culvert lining (24 inch) (603-00026) | LF | 4,321 | $183.69 | $175.00 | $164.00 | $175.00 | $175.00 | $231.00 |
| 13 | Culvert lining (30 inch) (603-00030) | LF | 226 | $190.57 | $245.00 | $190.00 | $233.00 | $260.00 | $250.00 |
| 14 | Fence (plastic) (607-11525) | LF | 200 | $4.64 | $4.00 | $6.00 | $14.00 | $5.00 | $15.00 |
| 15 | Field office (class 2) (620-00002) | EACH | 1 | $22,258 | $9,230.00 | $34,000 | $20,000 | $50,000 | $18,000 |
| 16 | Sanitary facility (620-00020) | EACH | 1 | $3,763.97 | $1,440.00 | $2,400.00 | $1,000.00 | $15,000 | $3,000.00 |
| 17 | Mobilization (626-00000) | LS | 1 | $134,771 | $137,600 | $136,000 | $91,750 | $160,000 | $252,000 |
| 18 | Public information services (tier IV) (626-01104) | LS | 1 | $4,500.00 | $7,665.00 | $6,200.00 | $2,175.00 | $5,500.00 | $6,000.00 |
| 19 | Flagging (630-00000) | HR | 2,500 | $40.00 | $49.00 | $50.00 | $48.00 | $35.00 | $20.00 |
| 20 | Traffic control inspection (630-00007) | DAY | 34 | $200.00 | $275.00 | $265.00 | $310.00 | $450.00 | $200.00 |
| 21 | Traffic control management (630-00012) | DAY | 68 | $2,000.00 | $975.00 | $1,600.00 | $1,985.00 | $1,375.00 | $500.00 |
| 22 | Flashing beacon (solar) (630-80002) | EACH | 4 | $1,631.28 | $2,785.00 | $430.00 | $505.00 | $1,000.00 | $1,575.00 |
| 23 | Barricade (type 3 M-A) (temporary) (630-80335) | EACH | 4 | $194.35 | $210.00 | $215.00 | $253.00 | $400.00 | $299.25 |
| 24 | Construction traffic sign (panel size A) (630-80341) | EACH | 23 | $51.00 | $85.00 | $45.00 | $50.00 | $60.00 | $48.30 |
| 25 | Construction traffic sign (panel size B) (630-80342) | EACH | 12 | $60.33 | $95.00 | $55.00 | $65.00 | $72.00 | $51.45 |
| 26 | Construction traffic sign (panel size C) (630-80343) | EACH | 18 | $78.05 | $140.00 | $70.00 | $80.00 | $78.00 | $54.60 |
| 27 | Construction information sign (630-80348) | EACH | 8 | $120.32 | $560.00 | $70.00 | $80.00 | $85.00 | $204.75 |
| 28 | Vertical panel (630-80350) | EACH | 36 | $52.43 | $49.00 | $37.00 | $43.00 | $40.00 | $48.30 |
| 29 | Portable message sign panel (630-80355) | EACH | 2 | $5,103.09 | $8,225.00 | $7,000.00 | $8,300.00 | $6,000.00 | $7,875.00 |
| 30 | Traffic cone (630-80380) | EACH | 50 | $10.30 | $15.00 | $16.00 | $18.00 | $11.00 | $46.20 |
| 31 | Mobile attenuator (630-85020) | EACH | 4 | $30,657 | $25,095 | $3,000.00 | $34,750 | $22,000 | $7,035.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
Every contract let that day: CDOT letting of September 11, 2025. Compiled by Mirage Metrics.