CDOT contract C23872 bid tabulation
This work consists of cleaning and lining culverts along CO 14 through the Poudre Canyon. SH 14 MP 75.5-85. Let by Colorado DOT on August 14, 2025, Larimer, Region 4. 3 bids received; low bid $196,525 by Subsurface, Inc, -28% against the engineer's estimate of $274,555.
- Owner
- Colorado DOT
- Letting
- 14 AUG 2025
- Pay items
- 24
- Data through
- 10 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Subsurface, Inc | $196,525 | Low | -28% |
| 2 | American West Construction, LLC | $285,200 | +45% | +4.0% |
| 3 | Insituform Technologies, LLC | $286,761 | +46% | +4.0% |
Engineer's estimate: $274,555.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Subsurface, Inc | 2. American West Construction, LLC | 3. Insituform Technologies, LLC |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201-00000) | LS | 1 | $10,000 | $5,000.00 | $12,000 | $11,115 |
| 2 | Removal of fence (202-01000) | LF | 10 | $19.10 | $50.00 | $200.00 | $125.00 |
| 3 | Clean culvert (202-04002) | EACH | 4 | $6,912.79 | $2,500.00 | $12,000 | $5,295.00 |
| 4 | Blading (203-01500) | HR | 10 | $220.78 | $1.00 | $210.00 | $270.00 |
| 5 | Laborer (203-02330) | HR | 20 | $70.68 | $75.00 | $75.00 | $40.00 |
| 6 | Erosion log type 3 (12 inch) (208-00023) | LF | 200 | $10.46 | $10.00 | $16.00 | $15.00 |
| 7 | Aggregate bag (208-00035) | LF | 200 | $13.07 | $15.00 | $14.00 | $14.00 |
| 8 | Sweeping (sediment removal) (208-00106) | HR | 16 | $188.82 | $125.00 | $160.00 | $220.00 |
| 9 | Culvert lining (24 inch) (603-00026) | LF | 54 | $821.21 | $290.00 | $450.00 | $380.00 |
| 10 | Culvert lining (48 inch) (603-00048) | LF | 61 | $614.55 | $605.00 | $620.00 | $1,140.00 |
| 11 | Culvert lining (54 inch) (603-00054) | LF | 62 | $800.00 | $740.00 | $760.00 | $965.00 |
| 12 | Fence (plastic) (607-11525) | LF | 300 | $4.52 | $15.00 | $5.00 | $5.00 |
| 13 | Delineator (type I) (612-00001) | EACH | 4 | $45.00 | $75.00 | $100.00 | $555.00 |
| 14 | Delineator (type III) (612-00003) | EACH | 6 | $55.00 | $80.00 | $100.00 | $555.00 |
| 15 | Mobilization (626-00000) | LS | 1 | $42,042 | $39,000 | $52,000 | $39,995 |
| 16 | Public information services (tier IV) (626-01104) | LS | 1 | $15,000 | $2,800.00 | $3,000.00 | $4,205.00 |
| 17 | Flagging (630-00000) | HR | 300 | $43.72 | $15.00 | $60.00 | $49.00 |
| 18 | Traffic control inspection (630-00007) | DAY | 8 | $120.74 | $340.00 | $400.00 | $280.00 |
| 19 | Traffic control management (630-00012) | DAY | 14 | $537.29 | $1,140.00 | $1,350.00 | $980.00 |
| 20 | Construction traffic sign (panel size A) (630-80341) | EACH | 26 | $50.63 | $17.00 | $19.00 | $35.00 |
| 21 | Construction traffic sign (panel size B) (630-80342) | EACH | 4 | $60.28 | $17.00 | $19.00 | $49.00 |
| 22 | Portable message sign panel (630-80355) | EACH | 2 | $5,105.60 | $1,320.00 | $1,500.00 | $2,800.00 |
| 23 | Drum channelizing device (630-80360) | EACH | 30 | $46.09 | $12.00 | $15.00 | $56.00 |
| 24 | Traffic cone (630-80380) | EACH | 30 | $8.88 | $10.00 | $6.00 | $7.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
Every contract let that day: CDOT letting of August 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.