CDOT contract C26274 bid tabulation
This is bridge replacement project near hayden, colorado in routt county along us 40 at mp 108.35. the work includes water control, a temporary detour, highway reconstruction, guardrail replacement, t. Let by Colorado DOT on December 18, 2025. 5 bids received; low bid $2,440,781 by Oldcastle SW Group, Inc., +52% against the engineer's estimate of $1,604,994.
- Owner
- Colorado DOT
- Letting
- 18 DEC 2025
- Pay items
- 93
- Data through
- 10 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Oldcastle SW Group, Inc. | $2,440,781 | Low | +52% |
| 2 | TLM Constructors, Inc. | $2,530,359 | +4.0% | +58% |
| 3 | Anson Excavating & Pipe, Inc | $2,680,706 | +10% | +67% |
| 4 | Myers & Sons Construction, LLC | $2,869,068 | +18% | +79% |
| 5 | American West Construction, LLC | $2,984,878 | +22% | +86% |
Engineer's estimate: $1,604,994.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Oldcastle SW Group, Inc. | 2. TLM Constructors, Inc. | 3. Anson Excavating & Pipe, Inc | 4. Myers & Sons Construction, LLC | 5. American West Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201-00000) | LS | 1 | $25,000 | $40,000 | $15,000 | $6,000.00 | $35,000 | $50,000 |
| 2 | Removal of pipe (202-00033) | EACH | 1 | $5,000.00 | $3,500.00 | $2,000.00 | $3,500.00 | $3,500.00 | $4,400.00 |
| 3 | Removal of delineator (202-00090) | EACH | 8 | $20.00 | $90.00 | $15.00 | $27.00 | $15.00 | $69.00 |
| 4 | Removal of asphalt mat (202-00220) | SY | 462.20 | $35.00 | $11.00 | $20.00 | $16.50 | $35.00 | $24.00 |
| 5 | Removal of asphalt mat (planing (202-00240) | SY | 14.20 | $20.00 | $116.00 | $240.00 | $590.00 | $120.00 | $280.00 |
| 6 | Removal of pavement marking (grinding (202-00250) | SF | 1,320 | $4.00 | $5.50 | $6.00 | $7.00 | $2.00 | $2.50 |
| 7 | Removal of bridge (202-00400) | EACH | 1 | $100,000 | $50,000 | $40,000 | $16,500 | $60,000 | $75,000 |
| 8 | Removal of fence (202-01000) | LF | 1,660 | $2.50 | $1.50 | $1.00 | $2.98 | $2.00 | $1.00 |
| 9 | Removal of guardrail type 3 (202-01130) | LF | 750 | $10.00 | $2.95 | $3.00 | $10.25 | $3.00 | $7.00 |
| 10 | Removal of end anchorage (202-01300) | EACH | 4 | $500.00 | $295.00 | $295.00 | $550.00 | $265.00 | $480.00 |
| 11 | Removal of detour (202-06000) | LS | 1 | $20,000 | $100,000 | $100,000 | $110,000 | $125,000 | $150,000 |
| 12 | Unclassified excavation (complete in place (203-00010) | CY | 846 | $50.00 | $39.00 | $38.00 | $140.00 | $50.00 | $40.00 |
| 13 | Blading (203-01500) | HR | 40 | $200.00 | $125.00 | $150.00 | $175.00 | $150.00 | $290.00 |
| 14 | Truck (dump (203-01582) | HR | 40 | $170.00 | $125.00 | $100.00 | $150.00 | $155.00 | $230.00 |
| 15 | Combination loader (203-01594) | HR | 40 | $125.00 | $125.00 | $125.00 | $160.00 | $140.00 | $150.00 |
| 16 | Potholing (203-01597) | HR | 20 | $300.00 | $300.00 | $750.00 | $250.00 | $375.00 | $400.00 |
| 17 | Laborer (203-02330) | HR | 20 | $80.00 | $40.00 | $60.00 | $65.00 | $45.00 | $98.00 |
| 18 | Structure excavation (206-00000) | CY | 130 | $90.00 | $52.00 | $60.00 | $105.00 | $60.00 | $88.00 |
| 19 | Structure backfill (class 1 (206-00100) | CY | 180 | $90.00 | $85.00 | $120.00 | $160.00 | $150.00 | $430.00 |
| 20 | Topsoil (onsite (207-00700) | CY | 399 | $35.00 | $50.00 | $41.00 | $55.00 | $25.00 | $81.00 |
| 21 | Erosion log type 1 (12 inch (208-00002) | LF | 830 | $6.00 | $5.00 | $6.50 | $8.00 | $6.25 | $5.00 |
| 22 | Aggregate bag (208-00035) | LF | 100 | $15.00 | $15.00 | $8.25 | $12.00 | $9.00 | $15.00 |
| 23 | Fre-fabricated concrete washout structure (208-00046) | EACH | 1 | $4,500.00 | $5,000.00 | $5,500.00 | $4,000.00 | $10,000 | $7,800.00 |
| 24 | Preabroated vehicle tracking pad (208-00075) | EACH | 2 | $5,000.00 | $1,500.00 | $4,000.00 | $2,000.00 | $12,000 | $5,200.00 |
| 25 | Construction mat (208-00082) | SF | 4,855 | $10.00 | $17.00 | $5.00 | $10.00 | $10.00 | $25.00 |
| 26 | Removal and disposal of sediment (labor (208-00103) | HR | 80 | $60.00 | $40.00 | $60.00 | $65.00 | $45.00 | $98.00 |
| 27 | Removal and disposal of sediment (208-00105) | HR | 45 | $170.00 | $125.00 | $130.00 | $295.00 | $85.00 | $160.00 |
| 28 | Sweeping (sediment removal (208-00106) | HR | 80 | $170.00 | $125.00 | $120.00 | $145.00 | $180.00 | $200.00 |
| 29 | Removal of trash (208-00107) | HR | 30 | $100.00 | $40.00 | $130.00 | $125.00 | $45.00 | $98.00 |
| 30 | Erosion control management (208-00207) | DAY | 25 | $200.00 | $800.00 | $1,000.00 | $750.00 | $400.00 | $450.00 |
| 31 | Water control (208-00400) | LS | 1 | $35,000 | $210,000 | $97,500 | $110,000 | $185,000 | $220,000 |
| 32 | Reset ground sign (210-00810) | EACH | 3 | $500.00 | $525.00 | $580.00 | $775.00 | $500.00 | $570.00 |
| 33 | Compost (mechanically applied (212-00701) | CY | 49.50 | $100.00 | $88.00 | $98.00 | $250.00 | $196.00 | $95.00 |
| 34 | Biotic soil amendments (hydraulically (212-00702) | LB | 1,106 | $3.00 | $1.70 | $2.00 | $3.50 | $2.55 | $4.00 |
| 35 | Mycorrhizae (212-00704) | LB | 18.40 | $10.00 | $19.00 | $20.00 | $13.18 | $10.50 | $21.00 |
| 36 | Seeding (native drill (212-00706) | ACRE | 0.76 | $3,000.00 | $170.00 | $2,000.00 | $1,800.00 | $1,348.45 | $2,300.00 |
| 37 | Seeding (native hydraulic (212-00707) | ACRE | 0.32 | $4,000.00 | $2,150.00 | $2,500.00 | $2,250.00 | $1,756.96 | $15,000 |
| 38 | Mulching (weed free (213-00003) | ACRE | 0.76 | $3,000.00 | $1,500.00 | $2,000.00 | $4,000.00 | $2,892.39 | $1,100.00 |
| 39 | Mulch tackifier (213-00061) | LB | 152 | $10.00 | $6.00 | $6.00 | $4.00 | $3.00 | $4.00 |
| 40 | Bonded fiber matrix (213-00150) | ACRE | 0.18 | $6,000.00 | $7,100.00 | $8,000.00 | $7,700.00 | $5,658.56 | $3,500.00 |
| 41 | Soil retention blanket (straw-coconut (216-00201) | SY | 1,530 | $4.00 | $3.25 | $3.50 | $3.00 | $2.15 | $3.00 |
| 42 | Wildlife biologist (240-00000) | HR | 40 | $220.00 | $125.00 | $220.00 | $225.00 | $300.00 | $350.00 |
| 43 | Removal of nests (240-00010) | HR | 5 | $250.00 | $245.00 | $450.00 | $225.00 | $300.00 | $370.00 |
| 44 | Netting (240-00020) | SY | 20 | $30.00 | $175.00 | $55.00 | $40.00 | $25.00 | $100.00 |
| 45 | Aggregate base course (class 6 (304-06000) | TON | 389.20 | $80.00 | $90.00 | $80.00 | $80.00 | $140.00 | $130.00 |
| 46 | Hot mix asphalt (patching (asphalt (403-00720) | TON | 10 | $700.00 | $340.00 | $360.00 | $425.00 | $350.00 | $560.00 |
| 47 | Hot mix asphalt (grading SX (75 (403-34701) | TON | 227.60 | $200.00 | $240.00 | $365.00 | $425.00 | $400.00 | $450.00 |
| 48 | Ona cement performance grade (PG (411-03355) | TON | 13.60 | $2,500.00 | $750.00 | $1,000.00 | $1,150.00 | $940.00 | $1,200.00 |
| 49 | = mulsified asphalt (slow-setting (411-10255) | GAL | 83.90 | $25.00 | $5.00 | $10.00 | $6.00 | $5.00 | $6.00 |
| 50 | Waterproofing (membrane (515-00120) | SY | 74 | $70.00 | $64.00 | $55.00 | $72.00 | $28.00 | $160.00 |
| 51 | Concrete class B (601-01000) | CY | 3 | $1,600.00 | $2,400.00 | $3,200.00 | $2,800.00 | $4,500.00 | $3,500.00 |
| 52 | Concrete class D (box culvert (601-03030) | CY | 32 | $1,400.00 | $2,400.00 | $2,250.00 | $2,250.00 | $3,800.00 | $3,400.00 |
| 53 | Reinforcing steel (epoxy coated (602-00020) | LB | 3,291 | $5.00 | $4.15 | $5.00 | $3.00 | $7.00 | $3.50 |
| 54 | 6X7 foot concrete box culvert (precast (603-70607) | LF | 64 | $1,000.00 | $1,975.00 | $3,250.00 | $4,000.00 | $4,500.00 | $2,000.00 |
| 55 | Euarerall type 3 (31 inch midwest guardrail (606-00302) | LF | 750 | $60.00 | $37.00 | $37.00 | $50.00 | $50.00 | $47.00 |
| 56 | EE anchorage (flared (606-02005) | EACH | 4 | $5,000.00 | $3,500.00 | $3,400.00 | $4,200.00 | $3,100.00 | $4,200.00 |
| 57 | End post (607-00005) | EACH | 4 | $500.00 | $335.00 | $435.00 | $450.00 | $400.00 | $350.00 |
| 58 | End post (temporary (special (607-00005) | EACH | 4 | $500.00 | $335.00 | $580.00 | $450.00 | $600.00 | $430.00 |
| 59 | Corner and line brace post (607-00010) | EACH | 3 | $1,000.00 | $445.00 | $510.00 | $525.00 | $500.00 | $510.00 |
| 60 | Fence barbed wire with metal posts (607-01000) | LF | 880 | $9.00 | $5.00 | $7.00 | $7.00 | $7.50 | $4.00 |
| 61 | Fence barbed wire with metal posts (607-01010) | LF | 840 | $8.00 | $5.00 | $7.00 | $7.00 | $7.50 | $4.50 |
| 62 | Fence (plastic (607-11525) | LF | 1,100 | $5.00 | $7.50 | $3.50 | $3.50 | $2.00 | $3.50 |
| 63 | Delineator (type (612-00001) | EACH | 4 | $40.00 | $35.00 | $33.00 | $45.00 | $55.00 | $120.00 |
| 64 | Delineator (type III (612-00003) | EACH | 4 | $45.00 | $35.00 | $35.00 | $55.00 | $95.00 | $98.00 |
| 65 | Rumble strip (grinding (614-80387) | LF | 1,265 | $2.00 | $5.55 | $3.00 | $5.00 | $6.35 | $1.50 |
| 66 | Sanitary facility (620-00020) | EACH | 1 | $5,000.00 | $10,000 | $7,250.00 | $1,200.00 | $12,000 | $6,600.00 |
| 67 | Detour (621-00425) | LS | 1 | $50,000 | $250,000 | $350,000 | $285,000 | $420,000 | $350,000 |
| 68 | Ated drainage pipe (class 0 (complete (624-20025) | LF | 80 | $80.00 | $145.00 | $175.00 | $480.00 | $250.00 | $275.00 |
| 69 | Construction surveying (625-00000) | LS | 1 | $20,000 | $70,000 | $40,000 | $40,000 | $45,000 | $52,000 |
| 70 | Construction surveying (hourly (625-00001) | HR | 10 | $250.00 | $190.00 | $240.00 | $245.00 | $190.00 | $900.00 |
| 71 | Mobilization (626-00000) | LS | 1 | $160,000 | $336,000 | $340,000 | $245,000 | $286,954 | $290,000 |
| 72 | Public information services (tier III (626-01103) | LS | 1 | $20,000 | $20,000 | $20,000 | $13,000 | $15,000 | $21,000 |
| 73 | Modified epoxy pavement marking (627-00008) | GAL | 21 | $320.00 | $150.00 | $650.00 | $750.00 | $150.00 | $550.00 |
| 74 | Pavement marking paint (high build (627-00013) | GAL | 40 | $120.00 | $225.00 | $165.00 | $195.00 | $75.00 | $430.00 |
| 75 | Flagging (630-00000) | HR | 2,500 | $45.00 | $50.00 | $55.00 | $60.00 | $45.00 | $60.00 |
| 76 | Traffic control inspection (630-00007) | DAY | 61 | $200.00 | $600.00 | $465.00 | $800.00 | $425.00 | $830.00 |
| 77 | Traffic control management (630-00012) | DAY | 126 | $1,400.00 | $1,500.00 | $1,600.00 | $1,650.00 | $1,400.00 | $1,200.00 |
| 78 | Flashing beacon (portable (630-80001) | EACH | 8 | $1,500.00 | $1,100.00 | $1,200.00 | $1,950.00 | $1,100.00 | $1,700.00 |
| 79 | Barricade (type 3 M-A (temporary (630-80335) | EACH | 4 | $160.00 | $350.00 | $390.00 | $210.00 | $350.00 | $240.00 |
| 80 | Construction traffic sign (panel size A (630-80341) | EACH | 20 | $55.00 | $80.00 | $85.00 | $115.00 | $80.00 | $60.00 |
| 81 | Construction traffic sign (panel size B (630-80342) | EACH | 36 | $75.00 | $110.00 | $120.00 | $125.00 | $110.00 | $86.00 |
| 82 | Construction traffic sign (special (630-80344) | SF | 60 | $30.00 | $35.00 | $38.00 | $90.00 | $35.00 | $33.00 |
| 83 | Vertical panel (630-80350) | EACH | 220 | $35.00 | $35.00 | $38.00 | $48.00 | $35.00 | $60.00 |
| 84 | Portable message sign panel (630-80355) | EACH | 2 | $5,000.00 | $15,000 | $13,000 | $8,500.00 | $12,000 | $14,000 |
| 85 | Advance warning flashing or sequencing (630-80358) | EACH | 2 | $1,500.00 | $750.00 | $830.00 | $2,250.00 | $750.00 | $5,000.00 |
| 86 | Drum channelizing device (630-80360) | EACH | 90 | $45.00 | $40.00 | $44.00 | $65.00 | $40.00 | $73.00 |
| 87 | Drum channelizing device (with light (630-80363) | EACH | 25 | $35.00 | $45.00 | $49.00 | $90.00 | $45.00 | $93.00 |
| 88 | Drum channelizing device (with light (630-80364) | EACH | 50 | $45.00 | $45.00 | $49.00 | $90.00 | $45.00 | $93.00 |
| 89 | Portable traffic speed monitor (630-80367) | EACH | 2 | $3,500.00 | $5,000.00 | $7,500.00 | $6,000.00 | $8,000.00 | $8,300.00 |
| 90 | Barrier (temporary (630-80370) | LF | 1,500 | $65.00 | $100.00 | $130.00 | $105.00 | $120.00 | $120.00 |
| 91 | Traffic cone (630-80380) | EACH | 200 | $10.00 | $5.00 | $6.00 | $22.00 | $5.00 | $24.00 |
| 92 | Impact attenuator (temporary (630-85010) | EACH | 4 | $5,000.00 | $8,000.00 | $8,000.00 | $12,000 | $15,000 | $9,600.00 |
| 93 | Mobile attenuator (630-85020) | EACH | 1 | $35,000 | $35,000 | $38,000 | $95,000 | $35,000 | $60,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
Every contract let that day: CDOT letting of December 18, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.