Abco Contracting, Inc.: CDOT bid record
Abco Contracting, Inc. submitted 12 bids on Colorado DOT contracts in the data, from 11 JUL 2024 to 21 AUG 2025, and was the low bidder on 2 of them (17%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Colorado DOT
- Low bid volume
- $8,051,401
- Latest bid
- 21 AUG 2025
- Data through
- 10 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 2 | 1 | 50% |
| 2025 | 10 | 1 | 10% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 1 | 6 | 1 | 17% |
| Region 4 | 3 | 1 | 33% |
| Region 2 | 1 | 0 | 0% |
| Region 3 | 1 | 0 | 0% |
| Region 5 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Sanitary facility | 620-00020 | EACH | 10 | 4 (40%) | $3,812.50 | $4,760.00 |
| Removal of expansion device | 202-00504 | LF | 7 | 4 (57%) | $450.00 | $351.29 |
| Pre-fabricated concrete washout structure (type 1) | 208-00046 | EACH | 9 | 3 (33%) | $2,215.00 | $3,000.00 |
| Construction traffic sign (panel size B) | 630-80342 | EACH | 10 | 2 (20%) | $65.00 | $66.50 |
| Removal and disposal of sediment (labor) | 208-00103 | HR | 9 | 2 (22%) | $60.00 | $79.50 |
| Barricade (type 3 M-A) (temporary) | 630-80335 | EACH | 8 | 2 (25%) | $140.00 | $200.00 |
| Impact attenuator (temporary) | 630-85010 | EACH | 7 | 2 (29%) | $7,935.00 | $8,897.86 |
| Removal and disposal of sediment (equipment) | 208-00105 | HR | 6 | 2 (33%) | $117.50 | $150.00 |
| Pre-fabricated vehicle tracking pad | 208-00075 | EACH | 6 | 2 (33%) | $2,500.00 | $6,000.00 |
| Removal of portions of present structure (class 2) | 202-00453 | SY | 6 | 2 (33%) | $410.00 | $515.83 |
| Construction traffic sign (panel size A) | 630-80341 | EACH | 12 | 1 (8%) | $55.50 | $55.00 |
| Traffic control inspection | 630-00007 | DAY | 11 | 1 (9%) | $470.00 | $350.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Myers & Sons Construction, LLC | 12 | 5 of 12 |
| Structures, Inc. | 10 | 6 of 10 |
| Lobato Construction, LLC | 3 | 1 of 3 |
| Native Sun Materials Inc | 2 | 1 of 2 |
| W.W. Clyde & Co. | 2 | 1 of 2 |
| HCG Construction LLC | 2 | 1 of 2 |
| TLM Constructors, Inc. | 1 | 0 of 1 |
| Tricon 2, LLC | 1 | 1 of 1 |
| KSK, LLC | 1 | 1 of 1 |
| Ralph L. Wadsworth Construction Company, LLC. | 1 | 1 of 1 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 21 AUG 2025 | C26065 | Region 1 | I-70 AND PENA BLVD OVERPASS | 4 of 5 | $1,083,193 | +32% |
| 21 AUG 2025 | C26632 | Region 4 | Remove and replace bridge rail on SH157 MP3.518 D-16-DG AND I70 MP329.74 F-20-BF Remove and replace adjacent guardrail, remove and replace s | 1 of 4 | $612,588 | Low, 6.0% under the second |
| 24 JUL 2025 | C26934combo | Region 1 | Bridge Repairs on east I-70 in Arapahoe County, near Deer Trail. Work includes repairs of bridge decks at four structures, including hydrode | 2 of 4 | $7,545,928 | +4.0% |
| 05 JUN 2025 | C25575 | Region 1 | US 40 IN DEER TRAIL, PINE ST TO BURTON ST | 5 of 5 | $778,587 | +16% |
| 22 MAY 2025 | C26607 | Region 1 | This project is located in Region 1 in Arapahoe County. Project work consists of milling, waterproofing membrane, paving, remove and replace | 2 of 3 | $2,928,333 | +5.0% |
| 01 MAY 2025 | C25564 | Region 5 | Three timber structures throughout Region 5 will be rehabilitated by installing HSS members adjacent to existing timber stringers. The three | 2 of 4 | $1,046,632 | +9.0% |
| 27 FEB 2025 | C25860 | Region 4 | This project is located in Region 4 in Weld County and Morgan Counties. The project consists of bridge preventative maintenance of structure | 3 of 6 | $3,693,623 | +13% |
| 06 FEB 2025 | C25624 | Region 1 | The R1 Expansion Joint Repairs at Railroads project includes the removal and replacement of expansion devices, joint repairs, deck repairs, | 2 of 4 | $2,894,147 | +8.0% |
| 30 JAN 2025 | C25603 | Region 3 | THIS PROJECT IS LOCATED ALONG I-70 THROUGH GLENWOOD CANYON IN GARFIELD AND EAGLE COUNTIES. THE WORK INCLUDES BRIDGE JOINT REPLACEMENTS. | 3 of 5 | $8,933,339 | +42% |
| 16 JAN 2025 | C25972 | Region 2 | Timber bridge retrofit project on 21 structures located in CDOT Region 2 on CO 9B, US 24A, US 24G, CO 67C, AND US 285D. | 5 of 7 | $3,272,287 | +82% |
| 21 NOV 2024 | C25058 | Region 4 | THIS PROJECT IS A BRIDGE PREVENTATIVE MAINTENANCE PROJECT OF 10 STRUCTURES IN REGION 4. STRUCTURES G-22-BD AND G-22-BE ON I-70 WILL RECIEVE | 3 of 4 | $6,297,010 | +21% |
| 11 JUL 2024 | C25561 | Region 1 | Bridge Preventative Maintenance project on seven structures along I-76 & I-225 within Adams and Arapahoe counties. The project consists of r | 1 of 2 | $7,438,813 | Low, 2.0% under the second |
How this record was read
CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; CDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.