Abco Contracting, Inc.: CDOT bid record

Abco Contracting, Inc. submitted 12 bids on Colorado DOT contracts in the data, from 11 JUL 2024 to 21 AUG 2025, and was the low bidder on 2 of them (17%). When it was not low, its total sat a median +15% above the low bid.

Owner
Colorado DOT
Low bid volume
$8,051,401
Latest bid
21 AUG 2025
Data through
10 SEP 2026
12Bids
2Low bids
17Win rate, percent
+15%Median gap to the low bid when not low, 10 bids

By year

YearBidsLow bidsWin rate
20242150%
202510110%
Abco Contracting, Inc., CDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 16117%
Region 43133%
Region 2100%
Region 3100%
Region 5100%
Abco Contracting, Inc., CDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Sanitary facility620-00020EACH104 (40%)$3,812.50$4,760.00
Removal of expansion device202-00504LF74 (57%)$450.00$351.29
Pre-fabricated concrete washout structure (type 1)208-00046EACH93 (33%)$2,215.00$3,000.00
Construction traffic sign (panel size B)630-80342EACH102 (20%)$65.00$66.50
Removal and disposal of sediment (labor)208-00103HR92 (22%)$60.00$79.50
Barricade (type 3 M-A) (temporary)630-80335EACH82 (25%)$140.00$200.00
Impact attenuator (temporary)630-85010EACH72 (29%)$7,935.00$8,897.86
Removal and disposal of sediment (equipment)208-00105HR62 (33%)$117.50$150.00
Pre-fabricated vehicle tracking pad208-00075EACH62 (33%)$2,500.00$6,000.00
Removal of portions of present structure (class 2)202-00453SY62 (33%)$410.00$515.83
Construction traffic sign (panel size A)630-80341EACH121 (8%)$55.50$55.00
Traffic control inspection630-00007DAY111 (9%)$470.00$350.00
Abco Contracting, Inc., CDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Myers & Sons Construction, LLC125 of 12
Structures, Inc.106 of 10
Lobato Construction, LLC31 of 3
Native Sun Materials Inc21 of 2
W.W. Clyde & Co.21 of 2
HCG Construction LLC21 of 2
TLM Constructors, Inc.10 of 1
Tricon 2, LLC11 of 1
KSK, LLC11 of 1
Ralph L. Wadsworth Construction Company, LLC.11 of 1
Abco Contracting, Inc., CDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
21 AUG 2025C26065Region 1I-70 AND PENA BLVD OVERPASS4 of 5$1,083,193+32%
21 AUG 2025C26632Region 4Remove and replace bridge rail on SH157 MP3.518 D-16-DG AND I70 MP329.74 F-20-BF Remove and replace adjacent guardrail, remove and replace s1 of 4$612,588Low, 6.0% under the second
24 JUL 2025C26934comboRegion 1Bridge Repairs on east I-70 in Arapahoe County, near Deer Trail. Work includes repairs of bridge decks at four structures, including hydrode2 of 4$7,545,928+4.0%
05 JUN 2025C25575Region 1US 40 IN DEER TRAIL, PINE ST TO BURTON ST5 of 5$778,587+16%
22 MAY 2025C26607Region 1This project is located in Region 1 in Arapahoe County. Project work consists of milling, waterproofing membrane, paving, remove and replace2 of 3$2,928,333+5.0%
01 MAY 2025C25564Region 5Three timber structures throughout Region 5 will be rehabilitated by installing HSS members adjacent to existing timber stringers. The three2 of 4$1,046,632+9.0%
27 FEB 2025C25860Region 4This project is located in Region 4 in Weld County and Morgan Counties. The project consists of bridge preventative maintenance of structure3 of 6$3,693,623+13%
06 FEB 2025C25624Region 1The R1 Expansion Joint Repairs at Railroads project includes the removal and replacement of expansion devices, joint repairs, deck repairs, 2 of 4$2,894,147+8.0%
30 JAN 2025C25603Region 3THIS PROJECT IS LOCATED ALONG I-70 THROUGH GLENWOOD CANYON IN GARFIELD AND EAGLE COUNTIES. THE WORK INCLUDES BRIDGE JOINT REPLACEMENTS.3 of 5$8,933,339+42%
16 JAN 2025C25972Region 2Timber bridge retrofit project on 21 structures located in CDOT Region 2 on CO 9B, US 24A, US 24G, CO 67C, AND US 285D.5 of 7$3,272,287+82%
21 NOV 2024C25058Region 4THIS PROJECT IS A BRIDGE PREVENTATIVE MAINTENANCE PROJECT OF 10 STRUCTURES IN REGION 4. STRUCTURES G-22-BD AND G-22-BE ON I-70 WILL RECIEVE 3 of 4$6,297,010+21%
11 JUL 2024C25561Region 1Bridge Preventative Maintenance project on seven structures along I-76 & I-225 within Adams and Arapahoe counties. The project consists of r1 of 2$7,438,813Low, 2.0% under the second
Abco Contracting, Inc.: latest CDOT bids in the data

How this record was read

CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; CDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy