CDOT contract C25575 bid tabulation

US 40 IN DEER TRAIL, PINE ST TO BURTON ST. Let by Colorado DOT on June 5, 2025, Arapahoe, Region 1. 5 bids received; low bid $672,753 by Myers & Sons Construction, LLC, +40% against the engineer's estimate of $480,000.

Owner
Colorado DOT
Letting
05 JUN 2025
Pay items
69
Data through
10 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Myers & Sons Construction, LLC$672,753Low+40%
2Jalisco International, Inc.$696,230+3.0%+45%
3Structures, Inc.$720,968+7.0%+50%
4HCG Construction LLC$749,999+11%+56%
5Abco Contracting, Inc.$778,587+16%+62%
CDOT contract C25575: bids by rank

Engineer's estimate: $480,000.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Myers & Sons Construction, LLC2. Jalisco International, Inc.3. Structures, Inc.4. HCG Construction LLC5. Abco Contracting, Inc.
1Clearing and grubbing (201-00000)LS1$7,500.00$3,500.00$5,000.00$7,426.76$10,000$20,000
2Removal of structure (special) (202-00002)EACH1$3,000.00$3,800.00$2,850.00$7,500.06$4,000.00$9,000.00
3Removal of sidewalk (202-00200)SY26$60.00$20.00$17.00$26.61$50.00$55.00
4Removal of curb (202-00201)LF20$33.12$20.00$20.00$22.65$20.00$49.00
5Removal of fence (202-01000)LF431$7.69$2.00$3.00$5.94$6.00$3.00
6Unsuitable material (203-00050)CY5$136.79$125.00$185.00$223.14$75.00$400.00
7Embankment material (complete in place) (203-00060)CY81$100.00$35.00$150.00$130.95$100.00$250.00
8Proof rolling (203-01100)HR10$144.35$150.00$140.00$162.21$200.00$300.00
9Blading (203-01500)HR20$131.72$175.00$160.00$230.87$250.00$300.00
10Dozing (203-01550)HR20$227.16$150.00$240.00$230.87$260.00$300.00
11Potholing (203-01597)HR40$313.95$250.00$235.00$310.71$300.00$340.00
12Laborer (203-02330)HR40$30.00$45.00$55.00$55.54$85.00$85.00
13Structure excavation (206-00000)CY47$100.68$75.00$11.00$28.74$30.00$185.00
14Structure backfill (class 1) (206-00100)CY55$165.06$75.00$100.00$182.49$135.00$250.00
15Structure backfill (class 2) (206-00200)CY25$99.57$50.00$58.00$41.31$40.00$283.00
16Stockpile topsoil (207-00210)CY18$57.95$10.00$22.00$19.34$15.00$140.00
17Topsoil (onsite) (207-00700)CY18$85.00$12.00$35.00$19.34$15.00$140.00
18Erosion log type 1 (12 inch) (208-00002)LF200$9.01$6.25$8.00$12.13$8.00$8.00
19Erosion log type 1 (20 inch) (208-00013)LF100$10.86$8.33$10.00$15.06$12.00$3.00
20Silt fence (208-00020)LF200$8.00$2.58$4.00$7.52$5.00$4.00
21Aggregate bag (208-00035)LF40$16.72$8.39$12.00$15.70$15.00$10.00
22Pre-fabricated concrete washout structure (type 1) (208-00046)EACH1$2,281.31$1,000.00$920.00$2,380.52$3,500.00$2,000.00
23Pre-fabricated vehicle tracking pad (208-00075)EACH3$3,200.00$1,500.00$6,700.00$6,934.72$6,000.00$2,500.00
24Removal and disposal of sediment (labor) (208-00103)HR20$83.92$45.00$55.00$48.57$85.00$54.00
25Removal and disposal of sediment (equipment) (208-00105)HR20$165.68$85.00$130.00$101.92$185.00$164.00
26Sweeping (sediment removal) (208-00106)HR40$149.40$200.00$205.00$110.53$200.00$300.00
27Removal of trash (208-00107)HR40$119.30$55.00$165.00$48.57$85.00$55.00
28Erosion control management (208-00207)DAY12$485.93$100.00$485.00$670.36$400.00$710.00
29Reset pre-fabricated vehicle tracking pad (210-00075)EACH3$500.00$500.00$500.00$775.18$250.00$690.00
30Soil conditioning (212-00032)ACRE0.85$8,539.61$5,347.22$5,700.00$7,524.03$3,500.00$6,500.00
31Compost (mechanically applied) (212-00701)CY56$121.65$70.63$76.00$99.38$140.00$85.00
32Mycorrhizae (212-00704)LB7$23.86$43.11$47.00$60.66$40.00$52.00
33Seeding (native) hydraulic (212-00707)ACRE0.85$2,743.89$2,188.66$2,400.00$3,079.65$3,480.00$2,700.00
34Mulching (weed free straw) (213-00004)ACRE0.85$2,013.77$1,256.44$1,360.00$1,767.93$3,500.00$1,500.00
35Mulch tackifier (213-00061)LB85$5.00$7.70$8.00$10.83$6.00$10.00
36Soil retention blanket (excelsior) (biodegradable class 1) (216-00211)SY450$8.29$3.95$4.28$5.56$6.00$5.00
37Herbicide treatment (217-00020)HR20$193.58$165.00$270.00$267.12$185.00$300.00
38Wildlife biologist (240-00000)HR8$421.67$230.00$220.00$233.20$150.00$275.00
39Hot mix asphalt (patching) (asphalt) (403-00721)SY3$150.26$950.00$400.00$795.00$400.00$655.00
40Pile tip (502-00460)EACH4$254.10$776.00$825.00$536.75$500.00$1,075.00
41Complete joint penetration (CJP) splice (502-00500)EACH4$1,004.36$1,695.00$1,710.00$1,708.45$3,000.00$2,170.00
42Dynamic pile test (502-02010)EACH2$3,870.81$5,000.00$2,300.00$4,639.51$5,500.00$5,300.00
43Steel piling (HP 14X89) (502-11489)LF181$80.00$204.87$215.00$161.64$195.00$255.00
44Pipe railing (514-00000)LF30$139.55$600.00$460.00$422.40$400.00$445.00
45Pedestrian railing (steel) (514-00200)LF114$200.00$600.00$425.00$481.71$400.00$450.00
46Bridge compression joint sealer (518-00000)LF25$217.92$300.00$625.00$334.95$350.00$275.00
47Concrete class D (bridge) (601-03040)CY43$850.00$1,100.00$1,335.00$1,561.54$1,700.00$1,475.00
48Structural concrete coating (anti-graffiti) (601-40302)SF315$4.13$5.00$4.00$9.24$12.00$6.00
49Reinforcing steel (epoxy coated) (602-00020)LB4,180$2.83$1.50$2.25$2.98$2.50$5.00
50Fence combination wire with metal posts (607-11200)LF415$11.04$10.00$6.00$7.57$10.00$6.00
51Fence (plastic) (607-11525)LF2,250$4.26$1.50$4.00$5.09$5.00$4.00
52Concrete sidewalk (6 inch) (608-00006)SY95$128.89$84.13$90.00$133.16$100.00$140.00
53Concrete curb ramp (608-00010)SY14$323.59$156.33$165.00$377.17$250.00$550.00
54Detectable warnings (608-00015)SF15$145.68$67.81$70.00$63.32$60.00$65.00
55Curb and gutter type 2 (section II-M) (609-21021)LF33$66.07$32.41$35.00$98.26$50.00$155.00
56Sign panel (class I) (614-00011)SF4$46.33$40.00$70.00$76.20$50.00$30.00
57Steel signpost (U-2) (614-00200)LF10$16.96$30.00$33.00$88.05$80.00$120.00
58Bollard (622-00270)EACH2$2,000.00$500.00$1,900.00$622.21$1,000.00$1,740.00
59Detour drainage pipe (class 0) (624-20301)LS1$10,000$2,500.00$12,600$4,025.06$23,500$15,500
60Construction surveying (625-00000)LS1$5,000.00$8,000.00$12,500$29,700$30,000$18,000
61Mobilization (626-00000)LS1$46,091$67,000$95,000$59,951$60,000$115,000
62Bridge girder and deck unit (100 feet to 105 feet) (628-00100)EACH1$128,000$272,500$210,000$226,432$240,000$159,000
63Flagging (630-00000)HR20$44.31$42.00$45.00$44.52$40.00$50.00
64Traffic control management (630-00012)DAY5$538.12$1,250.00$1,480.00$1,325.00$1,000.00$1,525.00
65Barricade (type 3 M-A) (temporary) (630-80335)EACH3$85.00$15.00$100.00$15.90$300.00$20.00
66Construction traffic sign (panel size A) (630-80341)EACH14$47.47$20.00$105.00$21.20$125.00$25.00
67Vertical panel (plastic) (630-80351)EACH5$27.99$15.00$30.00$15.90$50.00$20.00
68Drum channelizing device (630-80360)EACH7$100.00$25.00$40.00$26.50$50.00$30.00
69Traffic cone (630-80380)EACH20$10.40$5.00$10.00$5.30$10.00$7.00
CDOT contract C25575: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from CDOT's tabulation for this contract. CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.

Every contract let that day: CDOT letting of June 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy