Jalisco International, Inc.: CDOT bid record

Jalisco International, Inc. submitted 11 bids on Colorado DOT contracts in the data, from 06 JUN 2024 to 10 SEP 2026, and was the low bidder on 4 of them (36%). When it was not low, its total sat a median +26% above the low bid.

Owner
Colorado DOT
Low bid volume
$18,400,618
Latest bid
10 SEP 2026
Data through
10 SEP 2026
11Bids
4Low bids
36Win rate, percent
+26%Median gap to the low bid when not low, 7 bids

By year

YearBidsLow bidsWin rate
20246233%
20254125%
202611100%
Jalisco International, Inc., CDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
Region 19222%
Region 411100%
Jalisco International, Inc., CDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Potholing203-01597HR94 (44%)$299.00$350.00
Construction traffic sign (panel size A)630-80341EACH103 (30%)$95.00$55.00
Traffic cone630-80380EACH103 (30%)$14.00$13.00
Traffic control inspection630-00007DAY93 (33%)$300.00$350.00
Construction traffic sign (panel size B)630-80342EACH93 (33%)$85.00$66.50
Drum channelizing device630-80360EACH93 (33%)$40.00$44.00
Erosion control management208-00207DAY83 (38%)$392.50$410.00
Flashing beacon (portable)630-80001EACH73 (43%)$475.00$900.00
Reset ground sign210-00810EACH63 (50%)$292.50$529.14
Structure excavation206-00000CY53 (60%)$24.00$50.00
Traffic control management630-00012DAY102 (20%)$1,237.50$1,500.00
Sanitary facility620-00020EACH92 (22%)$4,300.00$4,760.00
Jalisco International, Inc., CDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Rodriguez Construction Org., LLC50 of 5
Myers & Sons Construction, LLC52 of 5
Structures, Inc.32 of 3
Hudick Excavating, Inc.33 of 3
FNF Construction, Inc.32 of 3
HCG Construction LLC21 of 2
Lobato Construction, LLC21 of 2
Flatiron Constructors, Inc.21 of 2
Morton Electric, Inc.10 of 1
Mountain Constructors, Inc.10 of 1
Jalisco International, Inc., CDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
10 SEP 2026C27164Region 1SH053A, SH095A, SH287C1 of 8$925,986Low, 19% under the second
05 JUN 2025C25575Region 1US 40 IN DEER TRAIL, PINE ST TO BURTON ST2 of 5$696,230+3.0%
23 MAY 2025C25826VASQUEZ BLVD - I270 TO 64TH - PACKAGE 11 of 1$10,683,069Low
27 MAR 2025C26650Region 1Sand Creek Drive is a frontage road running along the south side of I-270 from 56th Ave to Quebec Street. Sand Creek Drive has a retaining w3 of 3$363,283+47%
16 JAN 2025C24278Region 1I-25 Mobility Hub in the City of Lone Tree, Douglas County. Work includes a pedestrian bridge, ramp modifications to accommodate CDOT's Bust6 of 6$20,979,472+27%
19 DEC 2024C24548Region 1This project is located in Adams and Broomfield County on I-25 andCO-7. It will install Bustang slip ramps for the I-25 NB off ramp and SB o5 of 5$17,677,148+31%
21 NOV 2024C25250Region 1SH 7 AND AIRPORT DR INTERSECTION1 of 4$4,195,724Low, 6.0% under the second
24 OCT 2024C24809Region 1I25 AT MP 165.4 - NEW BRIDGE CONSTRUCTION OF WILDLIFE OVERPASS INCLUDING BRIDGE CONSTRUCTION, RETAINING WALLS, TEMPORARY EROSION CONTROL, SE4 of 8$15,785,295+6.0%
26 SEP 2024C26438Region 1I-270 YORK BRIDGE PREVENTATIVE MAINTENANCE Resident Engineer - Chris Cameron - (720) 505-6226 - chris.cameron@state.co.us2 of 5$991,400+26%
29 AUG 2024C19164Region 4US 34 & US 85 INTERCHANGE IN GREELEY1 of 6$2,595,839Low, 10% under the second
06 JUN 2024C24921Region 1FEDERAL BLVD (SH 287C): FROM 92ND AVE TO 105TH AVE2 of 3$2,988,158+3.0%
Jalisco International, Inc.: latest CDOT bids in the data

How this record was read

CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; CDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy