Jalisco International, Inc.: CDOT bid record
Jalisco International, Inc. submitted 11 bids on Colorado DOT contracts in the data, from 06 JUN 2024 to 10 SEP 2026, and was the low bidder on 4 of them (36%). When it was not low, its total sat a median +26% above the low bid.
- Owner
- Colorado DOT
- Low bid volume
- $18,400,618
- Latest bid
- 10 SEP 2026
- Data through
- 10 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 6 | 2 | 33% |
| 2025 | 4 | 1 | 25% |
| 2026 | 1 | 1 | 100% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 1 | 9 | 2 | 22% |
| Region 4 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Potholing | 203-01597 | HR | 9 | 4 (44%) | $299.00 | $350.00 |
| Construction traffic sign (panel size A) | 630-80341 | EACH | 10 | 3 (30%) | $95.00 | $55.00 |
| Traffic cone | 630-80380 | EACH | 10 | 3 (30%) | $14.00 | $13.00 |
| Traffic control inspection | 630-00007 | DAY | 9 | 3 (33%) | $300.00 | $350.00 |
| Construction traffic sign (panel size B) | 630-80342 | EACH | 9 | 3 (33%) | $85.00 | $66.50 |
| Drum channelizing device | 630-80360 | EACH | 9 | 3 (33%) | $40.00 | $44.00 |
| Erosion control management | 208-00207 | DAY | 8 | 3 (38%) | $392.50 | $410.00 |
| Flashing beacon (portable) | 630-80001 | EACH | 7 | 3 (43%) | $475.00 | $900.00 |
| Reset ground sign | 210-00810 | EACH | 6 | 3 (50%) | $292.50 | $529.14 |
| Structure excavation | 206-00000 | CY | 5 | 3 (60%) | $24.00 | $50.00 |
| Traffic control management | 630-00012 | DAY | 10 | 2 (20%) | $1,237.50 | $1,500.00 |
| Sanitary facility | 620-00020 | EACH | 9 | 2 (22%) | $4,300.00 | $4,760.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Rodriguez Construction Org., LLC | 5 | 0 of 5 |
| Myers & Sons Construction, LLC | 5 | 2 of 5 |
| Structures, Inc. | 3 | 2 of 3 |
| Hudick Excavating, Inc. | 3 | 3 of 3 |
| FNF Construction, Inc. | 3 | 2 of 3 |
| HCG Construction LLC | 2 | 1 of 2 |
| Lobato Construction, LLC | 2 | 1 of 2 |
| Flatiron Constructors, Inc. | 2 | 1 of 2 |
| Morton Electric, Inc. | 1 | 0 of 1 |
| Mountain Constructors, Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 10 SEP 2026 | C27164 | Region 1 | SH053A, SH095A, SH287C | 1 of 8 | $925,986 | Low, 19% under the second |
| 05 JUN 2025 | C25575 | Region 1 | US 40 IN DEER TRAIL, PINE ST TO BURTON ST | 2 of 5 | $696,230 | +3.0% |
| 23 MAY 2025 | C25826 | VASQUEZ BLVD - I270 TO 64TH - PACKAGE 1 | 1 of 1 | $10,683,069 | Low | |
| 27 MAR 2025 | C26650 | Region 1 | Sand Creek Drive is a frontage road running along the south side of I-270 from 56th Ave to Quebec Street. Sand Creek Drive has a retaining w | 3 of 3 | $363,283 | +47% |
| 16 JAN 2025 | C24278 | Region 1 | I-25 Mobility Hub in the City of Lone Tree, Douglas County. Work includes a pedestrian bridge, ramp modifications to accommodate CDOT's Bust | 6 of 6 | $20,979,472 | +27% |
| 19 DEC 2024 | C24548 | Region 1 | This project is located in Adams and Broomfield County on I-25 andCO-7. It will install Bustang slip ramps for the I-25 NB off ramp and SB o | 5 of 5 | $17,677,148 | +31% |
| 21 NOV 2024 | C25250 | Region 1 | SH 7 AND AIRPORT DR INTERSECTION | 1 of 4 | $4,195,724 | Low, 6.0% under the second |
| 24 OCT 2024 | C24809 | Region 1 | I25 AT MP 165.4 - NEW BRIDGE CONSTRUCTION OF WILDLIFE OVERPASS INCLUDING BRIDGE CONSTRUCTION, RETAINING WALLS, TEMPORARY EROSION CONTROL, SE | 4 of 8 | $15,785,295 | +6.0% |
| 26 SEP 2024 | C26438 | Region 1 | I-270 YORK BRIDGE PREVENTATIVE MAINTENANCE Resident Engineer - Chris Cameron - (720) 505-6226 - chris.cameron@state.co.us | 2 of 5 | $991,400 | +26% |
| 29 AUG 2024 | C19164 | Region 4 | US 34 & US 85 INTERCHANGE IN GREELEY | 1 of 6 | $2,595,839 | Low, 10% under the second |
| 06 JUN 2024 | C24921 | Region 1 | FEDERAL BLVD (SH 287C): FROM 92ND AVE TO 105TH AVE | 2 of 3 | $2,988,158 | +3.0% |
How this record was read
CDOT Tabulation of Bids PDFs from its bid tab archive, May 2023 to September 2026 (each contract linked to its OnBase document), and four December 2025 lettings read by OCR. About 100 tabulations of late 2025 and 2026 are printed in a font without text and are not read yet. On A+B contracts the cost part is kept. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; CDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.